PPP高速公路項(xiàng)目控制權(quán)的配置研究
[Abstract]:At present, franchising mode is introduced in the field of infrastructure construction in many areas of our country. At first, it was mainly BOT mode, that is, construction-operation-handover. Because PPP mode can make up for the deficiency of BOT, PPP mode has gradually become the mainstream in recent years. In view of the unique economic attributes of expressway and its important role in the development of national economy, reasonable regulation of expressway has become the focus of government attention. The key factor affecting the efficiency of highway public-private cooperation is the allocation of control rights. Based on this, this paper studies from the following aspects: (1) systematically expounds the research status of PPP project control at home and abroad. This paper sums up and analyzes the necessity and feasibility of adopting PPP mode on expressway, and combs the relationship among the stakeholders of PPP project at the same time. (2) the influence of reasonable pricing on the optimal allocation of control rights. The main motivation of private sector investment in PPP project is to obtain income. Price, as the main factor affecting private income, directly determines the enthusiasm of private sector investment. Based on this, a new regulatory mechanism is proposed: under the condition of independent pricing by private consortia, the optimal ownership structure of the project is analyzed, which abandons the previous analysis of project ownership from an isolated perspective. (3) the influence of the choice of concession period on the optimal allocation of control. The franchise period of PPP project refers to a certain period of time from the entry into force of the franchise agreement, including the construction period and the operation period. The essence of PPP project concession period and the allocation of control rights on this basis is that the public sector and private consortia work closely to deal with all kinds of uncertainties that may occur during the concession period. Then realize the risk sharing and benefit balance between the two sides. Therefore, a reasonable concession period can balance the cash flow of the project and ensure the investment parties to obtain the corresponding investment income. (4) Research on the relationship between the level of effort and the allocation of control rights in private enterprises. The social benefits of the project are largely affected by the level of efforts of the private sector. Because the output stage of social benefits is mainly the operation period of the project, the social benefits of the expressway include driving the economic development of the areas along the route, getting better service, technological innovation, improving the management level of the company, thus reducing the cost and improving the efficiency, and so on. These aspects are largely affected by the level of private sector efforts. Therefore, by studying the relationship between the allocation of control and the level of efforts of the private sector, the government can achieve the goal of improving the level of efforts of the private sector through the rational allocation of control.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類號(hào)】:F542;F283
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 焦新武;吳艷群;;蘭州市軌道交通投融資模式研究[J];甘肅科技;2011年15期
2 李義;;PPP項(xiàng)目融資風(fēng)險(xiǎn)分擔(dān)機(jī)制研究[J];中國證券期貨;2011年07期
3 魯會(huì)霞;;中國保障性住房項(xiàng)目融資模式探析[J];當(dāng)代經(jīng)濟(jì);2011年15期
4 盛和太;王守清;黃碩;;PPP項(xiàng)目公司的股權(quán)結(jié)構(gòu)及其在某養(yǎng)老項(xiàng)目中的應(yīng)用[J];工程管理學(xué)報(bào);2011年04期
5 胡振;劉華;金維興;;PPP項(xiàng)目范式選擇與風(fēng)險(xiǎn)分配的關(guān)系研究[J];土木工程學(xué)報(bào);2011年09期
6 葉曉u(píng)&;易朋成;吳書霞;;PPP項(xiàng)目控制權(quán)本質(zhì)探討[J];科技進(jìn)步與對(duì)策;2011年13期
7 袁競峰;季闖;李啟明;Skibniewski Miroslaw J.;;基于虛擬標(biāo)桿的基礎(chǔ)設(shè)施PPP項(xiàng)目績效評(píng)價(jià)體系構(gòu)建[J];現(xiàn)代管理科學(xué);2011年07期
8 吳曉兵;;我國城市物流規(guī)劃問題和對(duì)策[J];銅陵職業(yè)技術(shù)學(xué)院學(xué)報(bào);2011年02期
9 鄒立;孫運(yùn)濤;周慶;;基于精密單點(diǎn)定位的ADS40航測(cè)技術(shù)在線路工程中的應(yīng)用研究[J];科技創(chuàng)新導(dǎo)報(bào);2011年20期
10 楊潔;賈益斌;;論城市環(huán)境基礎(chǔ)設(shè)施投融資模式的選擇[J];中國城市經(jīng)濟(jì);2011年18期
相關(guān)會(huì)議論文 前10條
1 項(xiàng)英輝;劉全芝;;淺析PPP模式在沈陽市農(nóng)村水利設(shè)施建設(shè)中的應(yīng)用[A];第八屆沈陽科學(xué)學(xué)術(shù)年會(huì)論文集[C];2011年
2 魏巍;馬媛;湯民強(qiáng);周巨鎖;揚(yáng)琴;;縣際間海域勘界中GPS技術(shù)應(yīng)用研究[A];2009全國測(cè)繪科技信息交流會(huì)暨首屆測(cè)繪博客征文頒獎(jiǎng)?wù)撐募痆C];2009年
3 魏巍;馬媛;湯民強(qiáng);周巨鎖;揚(yáng)琴;;縣際間海域勘界中GPS技術(shù)應(yīng)用研究[A];第二十一屆海洋測(cè)繪綜合性學(xué)術(shù)研討會(huì)論文集[C];2009年
4 袁宏偉;張淑芳;;基于無線模塊的移動(dòng)終端的研究[A];中國航海學(xué)會(huì)通信導(dǎo)航專業(yè)委員會(huì)2005年學(xué)術(shù)年會(huì)論文集[C];2005年
5 涂銳;黃觀文;張勤;王利;;基于CORS站改正的模糊度固定PPP算法[A];第二屆中國衛(wèi)星導(dǎo)航學(xué)術(shù)年會(huì)電子文集[C];2011年
6 張軍;;一種遠(yuǎn)距離高精度時(shí)間比對(duì)和計(jì)量方法的測(cè)試研究[A];2005年全國時(shí)間頻率學(xué)術(shù)交流會(huì)文集[C];2005年
7 李忠;蔣文怡;;LOCOTROL通信在GSM-R網(wǎng)絡(luò)環(huán)境下的設(shè)計(jì)與實(shí)現(xiàn)[A];GSM-R數(shù)字移動(dòng)通信學(xué)術(shù)研討會(huì)論文集[C];2005年
8 尹哲;;風(fēng)險(xiǎn)投資介入與退出對(duì)中小企業(yè)控制權(quán)轉(zhuǎn)移影響的研究——基于中小企業(yè)板上市公司的經(jīng)驗(yàn)分析[A];第三屆(2008)中國管理學(xué)年會(huì)論文集[C];2008年
9 程煉;;對(duì)《合約主導(dǎo)權(quán)價(jià)值:TCL集團(tuán)整體上市的案例》一文的評(píng)論[A];中國制度變遷的案例研究(廣東卷)(第六集)[C];2008年
10 Thomas Nischan;Jens Wickert;;The GFZ Real-time GNSS Precise Positioning Service System and Its Adaption for COMPASS[A];第三屆中國衛(wèi)星導(dǎo)航學(xué)術(shù)年會(huì)電子文集——S03精密定軌與精密定位[C];2012年
相關(guān)重要報(bào)紙文章 前10條
1 葉梓;PPP:解讀與衡量經(jīng)濟(jì)發(fā)展的新視角[N];消費(fèi)日?qǐng)?bào);2011年
2 早報(bào)記者 羅晟;中國經(jīng)濟(jì)總量已經(jīng)超過美國?馬建堂:PPP計(jì)算法只有參考價(jià)值[N];東方早報(bào);2011年
3 ;探索PPP[N];中國房地產(chǎn)報(bào);2011年
4 本報(bào)記者 李木子;北京保障房建設(shè)率先引入PPP模式[N];證券日?qǐng)?bào);2011年
5 記者 金輝;孟春:PPP模式可以解決保障房融資難題[N];經(jīng)濟(jì)參考報(bào);2011年
6 本報(bào)記者 李紅梅;賈康:PPP模式已上報(bào)決策層[N];中國房地產(chǎn)報(bào);2011年
7 本報(bào)記者 李紅梅;孫潔:保障房的PPP模式[N];中國房地產(chǎn)報(bào);2011年
8 本報(bào)記者 陳韋;保障房建設(shè)的PPP模式[N];中華建筑報(bào);2011年
9 國務(wù)院發(fā)展研究中心研究員 高偉;慎用PPP理論[N];金融時(shí)報(bào);2011年
10 ;中國公司還需做好各種準(zhǔn)備[N];建筑時(shí)報(bào);2011年
相關(guān)博士學(xué)位論文 前10條
1 陳帆;基于契約關(guān)系的PPP項(xiàng)目治理機(jī)制研究[D];中南大學(xué);2010年
2 賴丹馨;基于合約理論的公私合作制(PPP)研究[D];上海交通大學(xué);2011年
3 甘琳;PPP模式在農(nóng)村水利基礎(chǔ)設(shè)施建設(shè)中的應(yīng)用研究[D];重慶大學(xué);2011年
4 Deus Mwita;坦桑尼亞住房項(xiàng)目的PPP模式建模研究[D];大連海事大學(xué);2012年
5 侯麗;風(fēng)險(xiǎn)條件下收費(fèi)公路PPP項(xiàng)目特許定價(jià)研究[D];昆明理工大學(xué);2012年
6 豆中強(qiáng);我國上市公司的控制權(quán)私利行為及其經(jīng)濟(jì)后果研究[D];重慶大學(xué);2010年
7 姚鵬程;不確定環(huán)境下的高速公路PPP項(xiàng)目定價(jià)問題研究[D];昆明理工大學(xué);2011年
8 柯永建;中國PPP項(xiàng)目風(fēng)險(xiǎn)公平分擔(dān)[D];清華大學(xué);2010年
9 何濤;基于PPP模式的交通基礎(chǔ)設(shè)施項(xiàng)目風(fēng)險(xiǎn)分擔(dān)合理化研究[D];天津大學(xué);2011年
10 劉宇文;PPP項(xiàng)目再融資最優(yōu)資本結(jié)構(gòu)研究[D];清華大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 孫曉鵬;PPP高速公路項(xiàng)目控制權(quán)的配置研究[D];天津大學(xué);2012年
2 易朋成;基于控制權(quán)理論的PPP項(xiàng)目合作效率研究[D];重慶大學(xué);2011年
3 陳曉;論我國PPP(公私合營)模式的法律框架[D];中國政法大學(xué);2010年
4 張永艷;基于公共選擇理論的我國PPP項(xiàng)目政府政策機(jī)制研究[D];重慶大學(xué);2011年
5 余小芳;PPP項(xiàng)目合作關(guān)系中的資源配置方式研究[D];重慶大學(xué);2010年
6 吳偉;PPP項(xiàng)目融資管理信息系統(tǒng)控制模式研究[D];重慶大學(xué);2009年
7 潘高;我國醫(yī)藥衛(wèi)生領(lǐng)域PPP應(yīng)用研究[D];重慶大學(xué);2011年
8 崔晨暉;基礎(chǔ)設(shè)施PPP建設(shè)模式應(yīng)用研究[D];重慶大學(xué);2011年
9 李堯;PPP模式在中國的研究趨勢(shì)分析[D];天津大學(xué);2012年
10 白銳;城市基礎(chǔ)設(shè)施建設(shè)項(xiàng)目PPP模式應(yīng)用研究[D];重慶交通大學(xué);2012年
,本文編號(hào):2500486
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2500486.html