基于ISM方法和物元模型的海外跨境高鐵項(xiàng)目風(fēng)險(xiǎn)評價(jià)研究
[Abstract]:With the development and implementation of Belt and Road's strategic plan, more and more countries along the route have strengthened their economic, trade and cultural exchanges and cooperation with China. This strategy provides a historic opportunity for the development of high-speed rail in China. However, due to the characteristics of the high-speed rail project itself and the influence of many factors in the host country, China's high-speed rail project to the world has greater complexity and uncertainty. How to identify risk factors scientifically and effectively, clarify the structure and mechanism of risk factors and evaluate the risks accurately has become an important problem of high-speed rail "going out", and is also the focus of this paper. This paper firstly collects and collates the data related to the causes of overseas setbacks of China's high-speed rail projects, and identifies the main types of risks encountered by overseas high-speed rail projects in China. Then the risk factors system of overseas cross-border high-speed rail project is constructed through the collation of relevant documents and the analysis of examples. Considering the interaction between risk factors, this paper proposes an improved method to determine the weight of granular computing. According to the similarity relationship between samples, the quotient space family with hierarchical structure is obtained. By calculating the importance of each attribute in the quotient space family, the corresponding weights of each evaluation index are obtained. Then the matter element model is introduced and the dynamic complex element model is constructed according to the characteristics of the overseas cross-border high-speed rail project which has a long duration and involves many host countries. Finally, taking the "Xinma-Malaysia high-speed railway" project as the research object, this paper uses the explanatory structure model to divide the risk factor system of the "Xinma-Malaysia high-speed railway" project into different levels, draws the structural diagram of the risk factor, and finds out the direct existence of the project. Source and process risk. The risk weight of each evaluation index is obtained by using improved particle calculation method. By comparing the weight obtained by grain calculation, it is found that the weight obtained under the condition of considering the mutual influence of risk factors is more reasonable. The dynamic complex element model is used to evaluate the risk of Xinma-high-speed railway project. Finally, according to the evaluation results, put forward the risk response strategies and recommendations.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F531.3;F125
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 宋微;;海外高鐵項(xiàng)目的風(fēng)險(xiǎn)評估與應(yīng)對策略[J];中國國情國力;2017年03期
2 李艾丹;;制造業(yè)小微企業(yè)競爭要素評價(jià)模型[J];運(yùn)籌與管理;2016年04期
3 黃利福;梁工謙;董仲慧;;基于模糊物元模型的高維多目標(biāo)FJSP研究[J];計(jì)算機(jī)應(yīng)用研究;2017年05期
4 李艾丹;朱東華;;產(chǎn)業(yè)集群協(xié)同創(chuàng)新服務(wù)平臺的可拓服務(wù)模型[J];科學(xué)學(xué)研究;2016年02期
5 潘竟虎;胡艷興;董曉峰;;絲綢之路經(jīng)濟(jì)帶經(jīng)濟(jì)差異時(shí)空格局演變特征[J];經(jīng)濟(jì)地理;2016年01期
6 梁世慶;孫波成;戢小輝;;基于熵權(quán)-物元模型的軌道交通建設(shè)時(shí)序研究[J];鐵道標(biāo)準(zhǔn)設(shè)計(jì);2015年10期
7 吳瓊;;中國—東盟直接投資問題研究[J];現(xiàn)代商業(yè);2015年24期
8 鄭明貴;黃明旺;;礦業(yè)項(xiàng)目生產(chǎn)運(yùn)營風(fēng)險(xiǎn)評價(jià)研究[J];管理現(xiàn)代化;2015年04期
9 李媛;汪偉;劉丹丹;;基于ICRG的中國海外投資國家風(fēng)險(xiǎn)評價(jià)方法[J];沈陽工業(yè)大學(xué)學(xué)報(bào)(社會科學(xué)版);2015年04期
10 譚暢;;“一帶一路”戰(zhàn)略下中國企業(yè)海外投資風(fēng)險(xiǎn)及對策[J];中國流通經(jīng)濟(jì);2015年07期
相關(guān)重要報(bào)紙文章 前1條
1 陳姍姍;任小璋;;中國鐵建中標(biāo)尼日利亞百億美元項(xiàng)目[N];第一財(cái)經(jīng)日報(bào);2014年
相關(guān)博士學(xué)位論文 前1條
1 何新華;內(nèi)河航運(yùn)系統(tǒng)體系框架設(shè)計(jì)的關(guān)鍵問題研究[D];同濟(jì)大學(xué);2007年
相關(guān)碩士學(xué)位論文 前5條
1 藍(lán)燕強(qiáng);高速鐵路施工項(xiàng)目風(fēng)險(xiǎn)控制研究[D];西南交通大學(xué);2014年
2 李向楠;基于模糊群決策的高鐵施工過程風(fēng)險(xiǎn)評價(jià)[D];華北電力大學(xué);2013年
3 侯文甜;基于解釋結(jié)構(gòu)模型的發(fā)電企業(yè)營銷風(fēng)險(xiǎn)分析與控制[D];華北電力大學(xué);2012年
4 張麗娜;項(xiàng)目風(fēng)險(xiǎn)識別的控制圖方法研究[D];鄭州大學(xué);2008年
5 易慶良;鐵路建設(shè)項(xiàng)目投資及其風(fēng)險(xiǎn)管理研究[D];西南交通大學(xué);2004年
,本文編號:2382696
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2382696.html