高鐵施工項(xiàng)目物資管理流程的評(píng)價(jià)及優(yōu)化研究
[Abstract]:The construction and operation mileage of high-speed railway in China ranks first in the world, and has become the national business card that symbolizes the pride of Chinese people. Compared with other road projects, such as ordinary railways and highways, the construction of high-speed railways has brought new challenges to material management because of the difficulty of construction and the high technology involved. The quality of material management has an important impact on the quality and construction cost of the project. In view of this, this paper studies the material management flow, evaluation method and optimization method in the construction project of high-speed railway, and analyzes and discusses the material management problem and optimization problem in high-speed railway. First of all, it summarizes the material management process in the construction process of the project, studies the material management organization structure, the material plan, the material acquisition and the important material management system and the method. The influence of material management on engineering construction and the advantages and disadvantages of existing management methods are summarized. It is pointed out that material management runs through the whole construction process of the project, and the system construction of material management must be strengthened. Secondly, from three aspects of quality control, cost control and risk control, the evaluation method of material management in construction project is studied, and the supplier with high material value is obtained by using fuzzy evaluation method. The results show that quality control, cost control and risk control should be taken into account in the evaluation of material management. Then, the improved differential evolution algorithm is proposed as the optimization algorithm for material management, and the corresponding mathematical model is established, and the optimization program is written in C language. The results show that the algorithm with rand-to-best and best-to-rand difference operator combined with adaptive control parameters has a high success rate for all test functions, and the former can take into account the success rate and computational efficiency of the algorithm. Finally, the optimization model of material management is developed, and the optimization flow of material management is put forward. Taking the steel bar purchasing in the construction project of Yunnan section of Hu-Kun passenger dedicated line as an example, the optimization analysis of material management is carried out in view of the key links in material management and the main attributes of suppliers. The results show that the optimization model can balance many factors in procurement, transportation, storage and recovery, and obtain the material management scheme which can ensure the quality and schedule of the project and make the total cost lowest. The more the number of alternative suppliers is, the lower the total cost is, and the less the impact of material management evaluation method on the optimization results is, which greatly weakens the influence of human subjective factors on the optimization management.
【學(xué)位授予單位】:石家莊鐵道大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F251;F532.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉連通;;淺談加強(qiáng)工程項(xiàng)目物資材料管理的策略[J];科技資訊;2016年02期
2 唐文佳;;鐵路工程施工中的物資材料管理[J];工程經(jīng)濟(jì);2015年12期
3 吳鴻亮;;改進(jìn)的邏輯框架法在電網(wǎng)項(xiàng)目后評(píng)價(jià)中的應(yīng)用[J];電網(wǎng)與清潔能源;2011年10期
4 李維;;關(guān)于建筑材料管理的探討[J];科技風(fēng);2010年09期
5 李順國;龔必武;黃清平;李匯;;基于Web Services的建筑企業(yè)信息化集成模型研究[J];武漢理工大學(xué)學(xué)報(bào);2008年05期
6 劉波;王凌;金以慧;;差分進(jìn)化算法研究進(jìn)展[J];控制與決策;2007年07期
7 曾晶;;淺析建筑工程項(xiàng)目信息化的現(xiàn)狀及實(shí)施建議[J];鐵道工程學(xué)報(bào);2007年03期
8 陸裕德;;藥物制劑生產(chǎn)中的物料管理[J];中國醫(yī)藥工業(yè)雜志;2006年03期
9 漢斯·克利斯蒂安·波弗爾,王微 ,張計(jì)劃;物流結(jié)構(gòu)的變遷——組織結(jié)構(gòu)[J];物流技術(shù)與應(yīng)用;2005年01期
10 柴君,滕清安;邏輯框架法在政府投資項(xiàng)目后評(píng)價(jià)中的應(yīng)用[J];江蘇地質(zhì);2004年03期
相關(guān)博士學(xué)位論文 前1條
1 劉建華;粒子群算法的基本理論及其改進(jìn)研究[D];中南大學(xué);2009年
相關(guān)碩士學(xué)位論文 前3條
1 元云麗;基于模糊層次分析法(FAHP)的建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];重慶大學(xué);2013年
2 李春驊;滬昆高鐵施工項(xiàng)目成本控制研究[D];蘭州大學(xué);2011年
3 戴化;建設(shè)工程材料供應(yīng)系統(tǒng)的可靠性管理與控制研究[D];湖南大學(xué);2007年
,本文編號(hào):2264808
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2264808.html