中國大都市區(qū)市域快軌發(fā)展滯后的原因
發(fā)布時(shí)間:2018-10-05 07:14
【摘要】:我國超大城市的空間拓展已進(jìn)入都市區(qū)階段,出行時(shí)耗明顯延長,利用常規(guī)地鐵制式難以滿足人們的出行要求,市域快軌的誕生有一定的實(shí)際需求,但最高運(yùn)行速度為140-160公里/小時(shí)的軌道制式在實(shí)踐中卻鮮有應(yīng)用。對(duì)其建設(shè)滯后的原因分析,國內(nèi)研究較少且不夠系統(tǒng)深入。本文系統(tǒng)分析了國內(nèi)市域快軌發(fā)展現(xiàn)狀、制式選擇的核心問題及市域快軌發(fā)展的制約因素。認(rèn)為主要滯因包括發(fā)展政策和建設(shè)機(jī)制不明晰、地方政府缺少建設(shè)動(dòng)機(jī)、都市區(qū)土地開發(fā)模式及規(guī)劃設(shè)計(jì)理論不完善、客流風(fēng)險(xiǎn)大等諸多不利條件;市域快軌是大都市區(qū)空間組織必不可少的運(yùn)輸工具,對(duì)我國大都市區(qū)而言有著更強(qiáng)的建設(shè)必要性,在法定規(guī)劃和軌網(wǎng)規(guī)劃中應(yīng)預(yù)留建設(shè)空間以降低建設(shè)成本。
[Abstract]:The space expansion of mega-cities in China has entered the stage of metropolitan area, the travel time is obviously prolonged, it is difficult to meet the travel requirements of people by using the conventional subway system, and the birth of urban fast rail has certain practical needs. However, the rail system with a maximum speed of 140-160 km / h is rarely used in practice. The analysis of the reasons for the lagging of its construction, the domestic research is less and less systematic. This paper systematically analyzes the present situation of the rapid rail development in China, the core problems of the system selection and the restrictive factors of the rapid rail development in the city area. The main reasons include unclear development policy and construction mechanism, lack of construction motivation of local government, imperfect land development model and planning and design theory in metropolitan area, high risk of passenger flow and so on. Urban fast track is an indispensable transportation tool for metropolitan spatial organization. It is more necessary to construct metropolitan area in our country. In order to reduce the construction cost, the construction space should be reserved in the legal planning and rail network planning.
【作者單位】: 西安建筑科技大學(xué)建筑學(xué)院;
【分類號(hào)】:F572;U239.5
本文編號(hào):2252487
[Abstract]:The space expansion of mega-cities in China has entered the stage of metropolitan area, the travel time is obviously prolonged, it is difficult to meet the travel requirements of people by using the conventional subway system, and the birth of urban fast rail has certain practical needs. However, the rail system with a maximum speed of 140-160 km / h is rarely used in practice. The analysis of the reasons for the lagging of its construction, the domestic research is less and less systematic. This paper systematically analyzes the present situation of the rapid rail development in China, the core problems of the system selection and the restrictive factors of the rapid rail development in the city area. The main reasons include unclear development policy and construction mechanism, lack of construction motivation of local government, imperfect land development model and planning and design theory in metropolitan area, high risk of passenger flow and so on. Urban fast track is an indispensable transportation tool for metropolitan spatial organization. It is more necessary to construct metropolitan area in our country. In order to reduce the construction cost, the construction space should be reserved in the legal planning and rail network planning.
【作者單位】: 西安建筑科技大學(xué)建筑學(xué)院;
【分類號(hào)】:F572;U239.5
【相似文獻(xiàn)】
相關(guān)期刊論文 前3條
1 朱艷平;;高鐵對(duì)沿線大都市區(qū)擴(kuò)大化的影響分析——以臺(tái)灣高鐵為例[J];中國市場;2012年23期
2 ;趙堅(jiān)教授建議加快發(fā)展通勤鐵路[J];城市軌道交通研究;2013年04期
3 魏立華,叢艷國;城際快速列車對(duì)大都市區(qū)通達(dá)性空間格局的影響機(jī)制分析——以京津唐大都市區(qū)為例[J];經(jīng)濟(jì)地理;2004年06期
相關(guān)重要報(bào)紙文章 前1條
1 本報(bào)記者 林乃鵬;引導(dǎo)大都市向外延伸發(fā)展[N];溫州日報(bào);2011年
相關(guān)碩士學(xué)位論文 前2條
1 黃珊珊;東京大都市區(qū)和北京軌道交通網(wǎng)絡(luò)的拓?fù)浣Y(jié)構(gòu)對(duì)比及分析[D];北京交通大學(xué);2015年
2 周婭娜;鐵路服務(wù)于大都市區(qū)公共交通的對(duì)策研究[D];西南交通大學(xué);2010年
,本文編號(hào):2252487
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2252487.html
最近更新
教材專著