濰坊港中港區(qū)液品泊位工程可行性研究
本文選題:可行性研究 + 液品泊位 ; 參考:《山東大學(xué)》2012年碩士論文
【摘要】:港口作為水陸交通運(yùn)輸?shù)臉屑~,發(fā)揮著連接海陸運(yùn)輸,中轉(zhuǎn)旅客和貨物運(yùn)輸,集散現(xiàn)代物流的重要作用。濰坊港經(jīng)過近幾年的發(fā)展,生產(chǎn)、建設(shè)、經(jīng)營(yíng)有了長(zhǎng)足的發(fā)展,未來將發(fā)展成為濱海開發(fā)區(qū)、濰坊市、淄博市及其他腹地各類物資中轉(zhuǎn)運(yùn)輸服務(wù)的大型綜合性、現(xiàn)代化、區(qū)域性港區(qū),為臨港油化工、鹽化工、煤化工、臨港物流和裝備制造等大型重化工業(yè)服務(wù)的地方性工業(yè)港區(qū),在濱海新城的建設(shè)發(fā)展之中發(fā)揮重要作用,進(jìn)而在黃河三角洲高效生態(tài)區(qū)發(fā)展中處于領(lǐng)先地位。 根據(jù)《濰坊港總體規(guī)劃》,未來10年濰坊港有望躋身山東省億噸大港行列。馬來西亞森達(dá)美有限公司將在未來三年內(nèi)投資約28億元人民幣以擴(kuò)展其在山東濰坊的港口業(yè)務(wù)。而濰坊港5萬噸級(jí)航道、5萬噸級(jí)液化品泊位、客貨滾裝、集裝箱泊位等重點(diǎn)項(xiàng)目已經(jīng)正式啟動(dòng),此舉標(biāo)志濰坊港新一輪大建設(shè)、大發(fā)展序幕已經(jīng)拉開,對(duì)濰坊發(fā)展大局和推動(dòng)濰坊濱海經(jīng)濟(jì)技術(shù)開發(fā)區(qū)加快“藍(lán)黃”兩區(qū)開發(fā)建設(shè)極具意義。 本文對(duì)濰坊港中港區(qū)5萬噸級(jí)液品碼頭的工程項(xiàng)目進(jìn)行了系統(tǒng)的研究。鑒于項(xiàng)目可行性研究在國(guó)內(nèi)外許多領(lǐng)域都有了成熟而詳盡的研究成果,本文著重從濰坊港中港區(qū)液品泊位工程項(xiàng)目的技術(shù)可行性、經(jīng)濟(jì)合理性等方面進(jìn)行了著重論述。論文第一章介紹了液品泊位工程項(xiàng)目的研究背景、研究的目意義、項(xiàng)目可行性研究的國(guó)內(nèi)外現(xiàn)狀;介紹了論文研究的主要內(nèi)容和方法。論文第二章具體到濰坊港中港區(qū)液品泊位項(xiàng)目的建設(shè)概述,對(duì)該項(xiàng)目的建設(shè)背景,必要性進(jìn)行了分析,同時(shí)引入SWOT模型對(duì)該項(xiàng)目的優(yōu)勢(shì)、劣勢(shì)、機(jī)遇、挑戰(zhàn)進(jìn)行了詳盡地分析。論文第三章從工程建設(shè)條件、港口岸線使用方案、節(jié)能與安全、項(xiàng)目實(shí)施、項(xiàng)目招標(biāo)等方面進(jìn)行了立體縱向的技術(shù)可行性分析。論文第四章是該項(xiàng)目的經(jīng)濟(jì)合理性分析,在投資估算及資金籌措的基礎(chǔ)上,進(jìn)行了效益分析、財(cái)務(wù)分析、經(jīng)濟(jì)影響和社會(huì)影響分析。論文第五章從風(fēng)險(xiǎn)識(shí)別和風(fēng)險(xiǎn)應(yīng)對(duì)措施兩個(gè)方面進(jìn)行了項(xiàng)目風(fēng)險(xiǎn)分析。 通過對(duì)該項(xiàng)目的可行性分析,我們得出結(jié)論,該項(xiàng)目的建設(shè)是必要的,并具有現(xiàn)實(shí)的意義,項(xiàng)目建成后,可以推動(dòng)腹地石化產(chǎn)業(yè)持續(xù)快速健康發(fā)展;符合《黃河三角洲高效生態(tài)經(jīng)濟(jì)區(qū)發(fā)展規(guī)劃》和《山東半島藍(lán)色經(jīng)濟(jì)區(qū)發(fā)展規(guī)劃》,促進(jìn)區(qū)域經(jīng)濟(jì)協(xié)調(diào)發(fā)展;完善港區(qū)功能,提升港口競(jìng)爭(zhēng)力。
[Abstract]:As the hub of land and sea transportation, port plays an important role in connecting land and sea transportation, transferring passengers and goods, and distributing modern logistics. After recent years of development, production, construction and operation, Weifang Port has made considerable progress. In the future, it will develop into a large-scale comprehensive and modern transport service for various materials and materials in the coastal development zones, Weifang, Zibo and other hinterlands. Regional port areas, which serve large-scale heavy chemical industries such as oil, salt, coal, logistics and equipment manufacturing, play an important role in the construction and development of Binhai New City. And then in the Yellow River Delta high-efficient ecological region development in the leading position. According to the Weifang Port Master Plan, Weifang Port is expected to rank in Shandong Province in the next 10 years. Malaysia Sendama will invest about 2.8 billion yuan over the next three years to expand its port operations in Weifang, Shandong Province. And the key projects of Weifang Port, such as the 50,000 ton waterway with 50,000 tons of liquefied berths, passenger and cargo ro / ro, container berths, have been officially started. This marks a new round of large-scale construction of Weifang Port, and the prologue of the major development has already begun. It is of great significance to the overall development of Weifang and to speed up the development and construction of Weifang Binhai Economic and technological Development Zone. This paper makes a systematic study on the engineering project of the 50,000 ton liquid products wharf in the middle port of Weifang Port. In view of the mature and detailed research results in many fields at home and abroad, this paper focuses on the technical feasibility and economic rationality of the water berth project in the middle port of Weifang Port. The first chapter introduces the research background, the significance of the research, the status quo of the feasibility study at home and abroad, and introduces the main contents and methods of the research. In the second chapter, the author summarizes the construction of the berth project in Weifang Port, analyzes the background and necessity of the project, and introduces the SWOT model to analyze the advantages, disadvantages, opportunities and challenges of the project. In the third chapter, the technical feasibility is analyzed from the aspects of engineering construction conditions, port shoreline usage scheme, energy saving and safety, project implementation, project bidding, and so on. The fourth chapter is the economic rationality analysis of the project. On the basis of investment estimation and fund raising, the paper carries out the benefit analysis, financial analysis, economic impact analysis and social impact analysis. The fifth chapter analyzes the project risk from two aspects: risk identification and risk response. Through the feasibility analysis of the project, we draw the conclusion that the construction of the project is necessary and has practical significance, after the project is completed, it can promote the sustainable, rapid and healthy development of petrochemical industry in hinterland; In line with the "Yellow River Delta Eco-Economic Zone Development Plan" and "Shandong Peninsula Blue Economic Zone Development Plan" to promote the coordinated development of regional economy, improve the functions of port areas, enhance the competitiveness of the port.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類號(hào)】:F552;U653.2
【共引文獻(xiàn)】
相關(guān)期刊論文 前10條
1 鄧國(guó)勝;;高校人事制度改革的方向與路徑[J];清華大學(xué)教育研究;2009年05期
2 張福慶,廖亮,姚麗;論江西省重大投資項(xiàng)目?jī)?chǔ)備庫(kù)管理機(jī)制[J];企業(yè)經(jīng)濟(jì);2004年03期
3 李開容;;青藏鐵路工程投資控制合理性分析[J];四川建筑;2010年02期
4 黃平;方月圓;;模糊綜合評(píng)價(jià)在投資項(xiàng)目風(fēng)險(xiǎn)分析中的應(yīng)用[J];四川建材;2006年04期
5 趙偉;高林章;;水電項(xiàng)目投資決策及其市場(chǎng)風(fēng)險(xiǎn)分析[J];四川水利;2006年05期
6 王寧寧;張琪;;電力建設(shè)工程設(shè)計(jì)階段造價(jià)管理研究[J];山東電力高等專科學(xué)校學(xué)報(bào);2011年02期
7 溫國(guó)棟;;可行性研究報(bào)告在食品工廠建設(shè)項(xiàng)目中的作用[J];食品工程;2006年02期
8 吳春,王銘;非營(yíng)利組織績(jī)效評(píng)估初探[J];山東行政學(xué)院山東省經(jīng)濟(jì)管理干部學(xué)院學(xué)報(bào);2005年05期
9 趙立波;李紅娟;張素琴;;基于平衡記分卡的非營(yíng)利組織評(píng)估體系研究[J];山東行政學(xué)院山東省經(jīng)濟(jì)管理干部學(xué)院學(xué)報(bào);2006年03期
10 張立;;基于成本效益矩陣的投資項(xiàng)目社會(huì)影響評(píng)價(jià)[J];上海金融;2008年07期
相關(guān)會(huì)議論文 前10條
1 宋浩;楊愛國(guó);;高速公路項(xiàng)目投資決策與融資框架分析[A];中國(guó)高速公路管理學(xué)術(shù)論文集(2009卷)[C];2009年
2 付軍明;;公路建設(shè)節(jié)約土地的對(duì)策與措施[A];湖北省公路學(xué)會(huì)二○○九年學(xué)術(shù)年會(huì)論文集[C];2010年
3 王廣林;馮智杰;;城鎮(zhèn)污水處理工程經(jīng)濟(jì)評(píng)價(jià)要點(diǎn)[A];中國(guó)環(huán)境保護(hù)優(yōu)秀論文集(2005)(上冊(cè))[C];2005年
4 呂曉英;呂勝利;;天然林保護(hù)工程綜合價(jià)值的動(dòng)態(tài)模擬與投資的費(fèi)用-效益分析[A];中國(guó)環(huán)境科學(xué)學(xué)會(huì)2006年學(xué)術(shù)年會(huì)優(yōu)秀論文集(下卷)[C];2006年
5 王麗杰;林天巖;;鴨綠江中朝友誼橋至太平灣段航道通航重要性分析[A];第十四屆中國(guó)海洋(岸)工程學(xué)術(shù)討論會(huì)論文集(下冊(cè))[C];2009年
6 張風(fēng)先;;工程變更索賠的風(fēng)險(xiǎn)管理[A];公路交通與建設(shè)論壇(2009)[C];2010年
7 杜亞娜;白珊珊;;建設(shè)項(xiàng)目管理“四大控制”措施[A];公路交通與建設(shè)論壇(2009)[C];2010年
8 張東紅;;移動(dòng)通信新業(yè)務(wù)項(xiàng)目再分配收入模型研究[A];中國(guó)通信學(xué)會(huì)第五屆學(xué)術(shù)年會(huì)論文集[C];2008年
9 王增忠;柳玉杰;施建剛;;建筑工程項(xiàng)目全壽命安全管理決策的貝葉斯方法[A];中國(guó)優(yōu)選法統(tǒng)籌法與經(jīng)濟(jì)數(shù)學(xué)研究會(huì)第七屆全國(guó)會(huì)員代表大會(huì)暨第七屆中國(guó)管理科學(xué)學(xué)術(shù)年會(huì)論文集[C];2005年
10 曾葦;;對(duì)廣州港口船舶生活污水排放接收處理的探討[A];第四屆廣東海事高級(jí)論壇論文集[C];2012年
相關(guān)博士學(xué)位論文 前10條
1 劉向東;基于利益相關(guān)者的土地整理項(xiàng)目共同治理模式研究[D];中國(guó)地質(zhì)大學(xué)(北京);2011年
2 孫慶友;大慶油田低滲透裂縫性油藏重復(fù)壓裂造縫機(jī)理研究[D];東北石油大學(xué);2011年
3 王小林;農(nóng)業(yè)項(xiàng)目投資群體決策支持系統(tǒng)[D];中國(guó)農(nóng)業(yè)大學(xué);2003年
4 孫波;國(guó)家重大項(xiàng)目監(jiān)管模式研究[D];河海大學(xué);2003年
5 溫汝俊;城市垃圾處置系統(tǒng)方案決策及市場(chǎng)動(dòng)作研究[D];重慶大學(xué);2003年
6 石振武;高速公路建設(shè)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)相關(guān)問題的研究[D];東北林業(yè)大學(xué);2004年
7 趙湘蓮;高新技術(shù)企業(yè)R&D財(cái)務(wù)管理研究[D];南京理工大學(xué);2004年
8 盛明泉;社會(huì)工程財(cái)務(wù)研究[D];天津財(cái)經(jīng)學(xué)院;2004年
9 顧海軍;公共項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)問題研究[D];河海大學(xué);2007年
10 馬麗娜;科技投資項(xiàng)目評(píng)價(jià)理論與方法研究[D];吉林大學(xué);2007年
相關(guān)碩士學(xué)位論文 前10條
1 張爽;北五味子產(chǎn)業(yè)基地項(xiàng)目財(cái)務(wù)評(píng)價(jià)與風(fēng)險(xiǎn)分析[D];長(zhǎng)春理工大學(xué);2010年
2 艾群;阜礦集團(tuán)吉林樺甸油頁巖開發(fā)項(xiàng)目經(jīng)濟(jì)評(píng)價(jià)研究[D];遼寧工程技術(shù)大學(xué);2009年
3 李標(biāo)實(shí);A公司年產(chǎn)5000噸超高分子量聚乙烯纖維財(cái)務(wù)分析及風(fēng)險(xiǎn)控制[D];中國(guó)海洋大學(xué);2010年
4 范小濤;萊蕪XX公司液壓齒輪泵項(xiàng)目的可行性研究[D];中國(guó)海洋大學(xué);2010年
5 劉純琪;Q化工有限公司年產(chǎn)5000噸萘系高效減水劑可行性研究[D];中國(guó)海洋大學(xué);2010年
6 胡延峰;萊蕪市Y粉末冶金廠1萬噸粉末冶金制品項(xiàng)目可行性分析[D];中國(guó)海洋大學(xué);2010年
7 穆鳳蘭;T紙業(yè)9萬噸SC紙項(xiàng)目財(cái)務(wù)分析[D];中國(guó)海洋大學(xué);2010年
8 貢艷潔;天津港集裝箱碼頭競(jìng)爭(zhēng)力綜合評(píng)價(jià)[D];大連海事大學(xué);2010年
9 巫騰飛;基于低碳經(jīng)濟(jì)的企業(yè)投資項(xiàng)目的評(píng)價(jià)研究[D];重慶理工大學(xué);2010年
10 潘利;C公司焊裝線自動(dòng)控制項(xiàng)目管理研究[D];華東理工大學(xué);2011年
,本文編號(hào):1923248
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/1923248.html