吉林石化公司乙二醇裝置聯(lián)產(chǎn)環(huán)氧乙烷項(xiàng)目成本管理研究
[Abstract]:In order to improve the economic benefit of the project and enhance the competitive ability of the enterprise in the fierce market competition, in the concrete enterprise project operation process, the project management this kind of advanced modern management idea and the management method is many big, It is widely used by medium-sized enterprises, which breaks the management hierarchy of administrative functions, forms the management mode with project as the core, and realizes the goals of low cost, high quality and short construction period. How to effectively play the role of cost management, improve the standard of project management, ensure the smooth progress of the project and other project management research has received extensive attention. At present, the cost management of chemical plant project in our country is still in the extensive mode stage. Cost management is a formality, and project costs often exceed budget. The main reasons are: (1) lack of advanced project cost management concept; (2) inaccurate cost estimation and cost budget; (3) one-sided emphasis on construction progress without considering the increase of cost; (4) lack of corresponding cost control measures. Taking the ethylene glycol co-production project of Jilin Petrochemical Company as the engineering background, this paper analyzes the basic situation of the project in four aspects: resource planning, cost estimation, cost budget and cost control. This paper finds out the experience and existing problems of the project in cost management, probes into the method and application of cost management of chemical plant, and puts forward some concrete suggestions on cost management of the project in order to reduce the risk of project management and improve the efficiency of the plant. Through the research of this paper, it is believed that it can provide some help for the project cost management of chemical plant in Jilin Petrochemical Company, and provide some reference for the project cost management of some enterprises.
【學(xué)位授予單位】:華東理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F406.72;F426.72
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙超;;施工企業(yè)工程項(xiàng)目成本核算之探討[J];重慶交通學(xué)院學(xué)報(bào);2007年01期
2 李文洪;;淺論施工成本控制在建筑工程施工管理中重要性[J];科技創(chuàng)新與應(yīng)用;2012年18期
3 周麗芬;陳倫官;;工程項(xiàng)目成本風(fēng)險(xiǎn)與成本控制措施分析探討[J];科技創(chuàng)新與應(yīng)用;2012年19期
4 宋玉琪;試議項(xiàng)目管理、成本管理及竣工決算之間關(guān)系[J];遼東學(xué)院學(xué)報(bào);2004年S1期
5 任玉瓏,吳銳,朱寧;層次型Agent在工程量工作分解結(jié)構(gòu)中的構(gòu)建及應(yīng)用[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);2002年05期
6 林軍;劉朝輝;沈志剛;;一種資源約束下的工程項(xiàng)目進(jìn)度計(jì)劃優(yōu)化方法[J];工程建設(shè)與設(shè)計(jì);2006年11期
7 范承余;;工程項(xiàng)目工期風(fēng)險(xiǎn)管理分析[J];工程與建設(shè);2006年03期
8 王東泉;;淺談建筑工程項(xiàng)目成本控制問(wèn)題[J];科技創(chuàng)新與應(yīng)用;2012年18期
9 何雁;;試論項(xiàng)目成本控制[J];河北企業(yè);2006年05期
10 楊義兵,曹小琳;工程項(xiàng)目進(jìn)度控制目標(biāo)的經(jīng)濟(jì)性分析[J];重慶建筑大學(xué)學(xué)報(bào);2003年02期
,本文編號(hào):2363475
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2363475.html