CP機(jī)加線建設(shè)項(xiàng)目進(jìn)度管理研究
本文選題:項(xiàng)目進(jìn)度管理 + 進(jìn)度管控; 參考:《吉林大學(xué)》2013年碩士論文
【摘要】:項(xiàng)目管理作為一門學(xué)科在現(xiàn)今社會的應(yīng)用范圍逐漸在擴(kuò)大,項(xiàng)目進(jìn)度管理在各類工程項(xiàng)目中的應(yīng)用也正逐步得到加強(qiáng),但由于我國開展項(xiàng)目管理研究相對較晚,在實(shí)際項(xiàng)目中的應(yīng)用比率和取得的效果還與國際項(xiàng)目管理的先進(jìn)水平有一定的差距,我們需要在實(shí)際項(xiàng)目實(shí)施工作中結(jié)合項(xiàng)目管理的理論不斷的探索和實(shí)踐,,總結(jié)出應(yīng)用項(xiàng)目管理的經(jīng)驗(yàn)和模式。 項(xiàng)目管理主要分為項(xiàng)目進(jìn)度管理、項(xiàng)目質(zhì)量管理、項(xiàng)目范圍管理、項(xiàng)目成本管理等幾部分,其中項(xiàng)目進(jìn)度管理是其最重要的組成部分,是項(xiàng)目推進(jìn)工作中十分重要的工作,加強(qiáng)項(xiàng)目進(jìn)度管理是規(guī)范項(xiàng)目推進(jìn)方案和保證項(xiàng)目目標(biāo)實(shí)現(xiàn)的關(guān)鍵。目前項(xiàng)目進(jìn)度管理在機(jī)械制造業(yè)上的應(yīng)用,尤其是項(xiàng)目進(jìn)度管理在生產(chǎn)線建設(shè)項(xiàng)目上的推行,還沒有較專業(yè)的闡述和可遵循的推行模式。為了探討生產(chǎn)線建設(shè)項(xiàng)目中項(xiàng)目進(jìn)度管理應(yīng)用的可操作性和可行性,以及分析總結(jié)采取項(xiàng)目進(jìn)度管理的推行模式與取得的效果。論文結(jié)合CP公司機(jī)加生產(chǎn)線建設(shè)項(xiàng)目的開展,論述了項(xiàng)目進(jìn)度管理在生產(chǎn)線建設(shè)上應(yīng)用的管理方式,并結(jié)合機(jī)加生產(chǎn)線建設(shè)的實(shí)際,從實(shí)用性的角度闡述了項(xiàng)目進(jìn)度管理對機(jī)加線項(xiàng)目進(jìn)展的管控優(yōu)勢,并對取得的效果和下一步的努力方向進(jìn)行了分析。 通過對CP公司的組建背景及發(fā)展規(guī)劃的展示,以及對其機(jī)加生產(chǎn)線建設(shè)情況的描述和介紹,并結(jié)合當(dāng)前各發(fā)動機(jī)制造公司在機(jī)加生產(chǎn)線建設(shè)項(xiàng)目上采用的管理模式的對比,和目前CP公司對機(jī)加生產(chǎn)線建設(shè)項(xiàng)目中的進(jìn)度要求和投入的各類資源條件等方面的論述,系統(tǒng)的分析了機(jī)加線項(xiàng)目采取項(xiàng)目進(jìn)度管理的可行性,總結(jié)了機(jī)加生產(chǎn)建設(shè)采用項(xiàng)目進(jìn)度管理的優(yōu)點(diǎn)和存在的問題。最終給出CP公司機(jī)加生產(chǎn)線建設(shè)項(xiàng)目應(yīng)采取以項(xiàng)目建設(shè)委員會領(lǐng)導(dǎo)下的以工藝部牽頭組織,以項(xiàng)目經(jīng)理負(fù)全責(zé),各部門協(xié)同參與的以項(xiàng)目進(jìn)度控制為核心的項(xiàng)目進(jìn)度管理模式。 針對CP公司機(jī)加生產(chǎn)線建設(shè)的實(shí)際,給出采用項(xiàng)目進(jìn)度管理的模式進(jìn)行管理的具體方法和步驟,并通過一些具體事項(xiàng)的分析和展示來加以論證,同時對提高機(jī)加生產(chǎn)線建設(shè)的管控能力的做法和如何高效快速推進(jìn)機(jī)加線建設(shè)等進(jìn)行了一定的闡述。結(jié)合CP公司機(jī)加生產(chǎn)線建設(shè)項(xiàng)目,目前以取得的進(jìn)展及效果的說明和對其優(yōu)劣勢的分析,證明項(xiàng)目進(jìn)度管理模式在機(jī)加生產(chǎn)線建設(shè)項(xiàng)目中的實(shí)用性和起到的促進(jìn)作用。應(yīng)用項(xiàng)目進(jìn)度管理模式可以有效掌控項(xiàng)目的推進(jìn)速度,利于項(xiàng)目資源高效利用,簡化了項(xiàng)目管理的層級,降低了項(xiàng)目管理成本,使項(xiàng)目目標(biāo)的實(shí)現(xiàn)得以有效保證。
[Abstract]:As a discipline , the application of project management is gradually expanded , and the application of project progress management in various engineering projects is gradually strengthened . However , because of the relatively late implementation of project management research in our country , the application ratio and effect of project management are still different from the advanced level of international project management , and we need to explore and practice the theory of project management in actual project implementation , and summarize the experience and model of application project management .
Project management is divided into the project schedule management , project quality management , project scope management and project cost management .
The paper analyzes the feasibility of the project schedule management , summarizes the advantages and existing problems of the project schedule management under the leadership of the project construction committee , and takes the project progress control as the core project schedule management mode under the leadership of the project construction committee .
In view of the actual situation of CP company machine plus production line construction , the concrete method and steps for managing the project progress management mode are given , and the practice of improving the control ability of the machine plus production line and how to improve the line construction of the high efficiency rapid propelling machine are expounded .
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TK408
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李優(yōu);;建設(shè)項(xiàng)目的施工進(jìn)度控制[J];廣西質(zhì)量監(jiān)督導(dǎo)報;2008年07期
2 李芳;;施工企業(yè)項(xiàng)目進(jìn)度控制方法[J];合作經(jīng)濟(jì)與科技;2008年12期
3 汪強(qiáng);進(jìn)度控制信息化初探[J];建筑管理現(xiàn)代化;2001年01期
4 歐春花;;淺談工程施工進(jìn)度管理[J];山西建筑;2008年08期
5 胡月愛;;淺談施工進(jìn)度控制[J];山西建筑;2008年16期
6 張小純;;淺談項(xiàng)目管理中的施工進(jìn)度的控制[J];黑龍江科技信息;2009年10期
7 吳國有;項(xiàng)目管理的計(jì)劃及控制方法[J];當(dāng)代石油石化;2002年08期
8 王健,劉爾烈,駱剛;工程項(xiàng)目管理中工期—成本—質(zhì)量綜合均衡優(yōu)化[J];系統(tǒng)工程學(xué)報;2004年02期
9 郭軍義;;淺議施工項(xiàng)目進(jìn)度控制[J];科技創(chuàng)新導(dǎo)報;2008年27期
10 季雪;我國建設(shè)項(xiàng)目管理中存在的問題及對策[J];中央財(cái)經(jīng)大學(xué)學(xué)報;1998年02期
相關(guān)碩士學(xué)位論文 前2條
1 孫愛民;A公司發(fā)動機(jī)生產(chǎn)線建設(shè)項(xiàng)目進(jìn)度和風(fēng)險管理研究[D];南京理工大學(xué);2010年
2 王樹明;工程項(xiàng)目進(jìn)度優(yōu)化管理研究[D];天津大學(xué);2004年
本文編號:2018590
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2018590.html