四川省重點(diǎn)公路特殊隧道建設(shè)管理及信息化施工技術(shù)要點(diǎn)研究

發(fā)布時(shí)間:2019-06-25 12:46
【摘要】:按照四川省委九屆四次全會(huì)做出的建設(shè)西部綜合交通樞紐的戰(zhàn)略部署,四川高速公路建設(shè)突飛猛進(jìn),到2013年底,四川省高速公路通車?yán)锍踢_(dá)到5000公里,2014年在建高速公路1592公里,正在開展前期工作的項(xiàng)目1660公里。我省規(guī)劃擬在未來20年建設(shè)高速公路總里程達(dá)12000公里以上。隨著公路事業(yè)的發(fā)展,隧道建設(shè)成為公路建設(shè)的關(guān)鍵環(huán)節(jié),瓦斯、巖溶、涌突水較為常見,隧道棄碴帶來的環(huán)保問題和誘發(fā)新的次生地質(zhì)災(zāi)害問題,給隧道建設(shè)管理帶來了極大的挑戰(zhàn)。如果對(duì)這些特殊地質(zhì)災(zāi)害認(rèn)識(shí)不足,管理不到位,措施不力,對(duì)可能出現(xiàn)的安全隱患沒有防范和預(yù)見,將不能有效防范安全事故的發(fā)生,而且還會(huì)增加工程造價(jià),延誤建設(shè)工期。本文通過研究國(guó)內(nèi)外隧道的先進(jìn)建設(shè)管理技術(shù),結(jié)合已積累的經(jīng)驗(yàn)和新形勢(shì)、新問題,積極探索公路隧道建設(shè)管理技術(shù),用于指導(dǎo)四川省公路隧道建設(shè)管理。
[Abstract]:According to the strategic plan of building a comprehensive transportation hub in the west made by the fourth Plenary session of the Ninth Sichuan Provincial CPC Committee, the construction of Sichuan expressway has advanced by leaps and bounds. By the end of 2013, the mileage of Sichuan expressway was 5000 kilometers, the highway under construction in 2014 was 1592 kilometers, and the project under construction was 1660 kilometers. Our province plans to build a highway in the next 20 years, the total mileage of more than 12000 kilometers. With the development of highway industry, tunnel construction has become the key link of highway construction. Gas, karstification and water inrush are more common. The environmental protection problems and induced new secondary geological disasters caused by tunnel ballast disposal have brought great challenges to tunnel construction management. If there is not enough understanding of these special geological disasters, the management is not in place, the measures are not effective, and the possible safety hidden dangers are not prevented and predicted, the occurrence of safety accidents will not be effectively prevented, and the project cost will be increased and the construction period will be delayed. By studying the advanced construction management technology of tunnel at home and abroad, combined with the accumulated experience, new situation and new problems, this paper actively explores the highway tunnel construction management technology, which can be used to guide the highway tunnel construction management in Sichuan Province.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U455.4;U459.2

【參考文獻(xiàn)】

相關(guān)博士學(xué)位論文 前1條

1 孟陸波;隧道超前地質(zhì)預(yù)報(bào)技術(shù)與計(jì)算機(jī)輔助預(yù)報(bào)系統(tǒng)研究[D];成都理工大學(xué);2009年

相關(guān)碩士學(xué)位論文 前1條

1 李紅云;業(yè)主工程施工質(zhì)量控制研究[D];四川大學(xué);2006年



本文編號(hào):2505695

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2505695.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶657e7***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com