高速公路PPP項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:According to the 12th Five-Year Development Plan of Transportation issued by the Ministry of Communications in 2011, the mileage of expressway in China will increase from 74100 km at the end of 2010 to 108000 km. in 2015. It takes an average of 1.24 trillion yuan a year to achieve this goal, with a total investment of 6.2 trillion yuan. Government funding alone is clearly not enough to meet demand, so the PPP model has emerged. The PPP model brings the policy support capacity of government departments and relatively abundant private sector funding. Advanced management mode and rich management experience have been applied in infrastructure construction in China. Because the infrastructure PPP project lasts for a long time, involves a wide range of areas, has a large amount of investment, risk factors and risk, its risk management has been a common focus of the project participants. On the basis of analyzing and summarizing the domestic and foreign theories, this paper starts with the basic concept of the PPP project risk of expressway in our country, and introduces the concept, basic form, basic operation procedure, risk definition and characteristic of the PPP mode, as well as the meaning of risk management. The main contents and characteristics are briefly introduced. This paper analyzes and evaluates the risk of expressway PPP project, explains the main characteristics of the risk of PPP project, and at the same time divides the type of risk and constructs the set of risk factors. The risk assessment model is established by using the analytic hierarchy process (AHP) and fuzzy mathematics. The main risk factors are financing risk, market operation risk and construction risk. On the basis of the principle of PPP project risk sharing, taking into account the overall interests of the project participants and the project, this paper analyzes and designs how to share the risk factors of the PPP project. This paper analyzes the basic measures of PPP project risk management, and puts forward the concrete countermeasures of PPP project risk.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類(lèi)號(hào)】:F283;F542;F224
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 陳峗;聶波;;高速公路經(jīng)營(yíng)主體行為風(fēng)險(xiǎn)預(yù)測(cè)[J];工業(yè)技術(shù)經(jīng)濟(jì);2005年09期
2 歐顯濤,劉玉峰,鐘韻;BOT項(xiàng)目的風(fēng)險(xiǎn)轉(zhuǎn)移實(shí)證分析[J];建筑經(jīng)濟(jì);2004年09期
3 柯永建;王守清;陳炳泉;;基礎(chǔ)設(shè)施PPP項(xiàng)目的風(fēng)險(xiǎn)分擔(dān)[J];建筑經(jīng)濟(jì);2008年04期
4 曾民;我國(guó)高速公路特許經(jīng)營(yíng)風(fēng)險(xiǎn)分析[J];企業(yè)技術(shù)開(kāi)發(fā);2005年05期
5 張衛(wèi)軍;葛折圣;;廣州市增從高速公路投資風(fēng)險(xiǎn)評(píng)價(jià)[J];市政技術(shù);2006年04期
6 楊秋波;侯曉文;;PPP模式風(fēng)險(xiǎn)分擔(dān)框架的改進(jìn)研究[J];項(xiàng)目管理技術(shù);2008年08期
7 王雪青;喻剛;邴興國(guó);;PPP項(xiàng)目融資模式風(fēng)險(xiǎn)分擔(dān)研究[J];軟科學(xué);2007年06期
8 王作功,賈元華,王海星,高詠玲;基于模糊綜合模型的收費(fèi)高速公路投資風(fēng)險(xiǎn)評(píng)估研究[J];中國(guó)安全科學(xué)學(xué)報(bào);2005年10期
相關(guān)博士學(xué)位論文 前1條
1 王作功;基于生態(tài)理論的高速公路投資風(fēng)險(xiǎn)管理研究[D];北京交通大學(xué);2009年
相關(guān)碩士學(xué)位論文 前8條
1 劉雷;PPP(公私協(xié)作)在北京軌道交通建設(shè)運(yùn)營(yíng)中的應(yīng)用研究[D];對(duì)外經(jīng)濟(jì)貿(mào)易大學(xué);2005年
2 池洲;公路工程質(zhì)量風(fēng)險(xiǎn)管理問(wèn)題的研究[D];合肥工業(yè)大學(xué);2005年
3 常忠蛟;我國(guó)高速公路項(xiàng)目投資風(fēng)險(xiǎn)管理[D];山東大學(xué);2005年
4 王治強(qiáng);層次分析法在高速公路工程承包風(fēng)險(xiǎn)管理中的應(yīng)用[D];鄭州大學(xué);2005年
5 楊鳳菊;公路建設(shè)外匯貸款風(fēng)險(xiǎn)管理研究[D];長(zhǎng)沙理工大學(xué);2005年
6 吳美紅;城市基礎(chǔ)設(shè)施融資引入PPP模式研究[D];河海大學(xué);2007年
7 王曄;高速公路項(xiàng)目投資風(fēng)險(xiǎn)管理[D];北京郵電大學(xué);2007年
8 李強(qiáng);高速公路工程建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];山東大學(xué);2007年
本文編號(hào):2340985
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2340985.html