九江至南昌城際高速鐵路質(zhì)量管理研究
[Abstract]:At present, China's inter-city railway and high-speed railway are constantly building and developing, the construction of inter-city railway has many advantages, which can bring economic growth, shorten the operation time between cities, ease the pressure of transportation, and bring convenience to the common people. However, there are still many problems to be solved in the process of high-speed railway construction in China. For example, in the construction of inter-city railway, the concept of legal system of personnel involved in the construction is not strong, the supervision system of inter-city railway and the related supporting system are not perfect. The quality of intercity railway needs to be further strengthened and improved. In view of these problems, this paper thinks that it is very important and worthy to study the quality management of inter-city railway construction. Based on the analysis of the relevant projects of the inter-city railway construction from Jiujiang to Nanchang, this paper studies the quality assurance measures of the inter-city railway construction and the key points of the quality control of the inter-city railway construction. The application of safety assurance in the construction of inter-city railway and the application of construction time measures in the quality management of inter-city railway are discussed. The requirements and contents of quality management for inter-city railway construction are studied and analyzed. After focusing on the quality assurance measures of inter-city railway construction, this paper analyzes the importance of safety in quality construction by studying the quality control and analysis of technical key points in Changjiu inter-city railway. Three problems are put forward, they are: there may be corruption in the process of bidding and material supply in the construction of inter-city railway, and there are still problems in the supervision and management of project quality. The phenomenon of high-speed railway construction project is still very serious. According to these three problems, this paper also analyzes the countermeasures to solve the problem. We should perfect the legal system construction, improve the legal concept of the participants, and put an end to this phenomenon, and we should formulate local laws and regulations or departmental regulations. To establish the construction period control system and other solutions. By analyzing and solving the problems of Changjiu inter-city railway, this paper further studies and analyzes the important role of quality management in project management.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:U238;F532.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張建宏;;淺談建設(shè)工程質(zhì)量管理[J];福建建筑;2011年04期
2 陳志雄,譚玉芳,劉穗斌,陳慶烈;嚴(yán)格執(zhí)行建筑工程秩序 確保施工工程質(zhì)量[J];工程建設(shè)與設(shè)計(jì);2003年07期
3 楊柏鐘;;確保城市軌道交通通信傳輸系統(tǒng)穩(wěn)定運(yùn)行的幾個(gè)關(guān)鍵環(huán)節(jié)[J];城市軌道交通研究;2011年05期
4 江仕煉;;淺談如何提高工程質(zhì)量管理[J];廣東建材;2010年05期
5 于姝;;淺談建設(shè)工程質(zhì)量管理中存在的問題[J];黑龍江科技信息;2011年11期
6 王滔;胡強(qiáng);;工程質(zhì)量監(jiān)督管理系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];計(jì)算機(jī)與現(xiàn)代化;2007年01期
7 付立;崔鵬;;對(duì)建筑工程的施工管理中存在問題剖析[J];科技致富向?qū)?2011年29期
8 李寶茹;;談如何提高建筑工程質(zhì)量管理水平[J];科技信息;2012年21期
9 謝水生;;高速列車用接觸導(dǎo)線的加工與制備[J];資源再生;2012年10期
10 馬楠;;城際鐵路對(duì)區(qū)域經(jīng)濟(jì)社會(huì)發(fā)展的作用[J];天津職業(yè)院校聯(lián)合學(xué)報(bào);2010年05期
,本文編號(hào):2277958
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2277958.html