援加納高速公路改擴建項目管理研究
[Abstract]:Under the guidance of project management theory and on the basis of studying and analyzing the present situation of expressway project management at home and abroad, this paper puts forward that the four phases of project life cycle should be taken as the main line to carry out project management. And throughout the life cycle of the project management elements, the elements as an organic whole, analysis of the impact of each element on the project, put forward the corresponding solution; at the same time, according to the control theory of project management, Effective control of progress, cost and quality during project implementation. The main work of this paper is as follows: with the aid of Ghana highway reconstruction and extension project as an example, the background of the project, Ghana's natural geographical environment, political and economic environment and other management environment are analyzed. According to the project cycle theory, the project is divided into four stages: start, plan, implement and monitor and finish. In the starting stage of the project, it mainly introduces the starting of domestic and foreign organizations, construction technology and material starting, and in the planning stage of the project, it mainly divides the work scope of the project, gives the work breakdown structure of the project, and gives the progress plan of the project. Cost planning and quality planning; in the implementation and monitoring phase of the project introduced the project construction characteristics, the project key difficulties and countermeasures, the progress of the project, cost, quality implementation and monitoring; At the end of the project, the acceptance and evaluation of the project are mainly carried out. Combined with the management and implementation of the project, this paper analyzes the management mode and characteristics of the reconstruction and extension project of the aid Ghana expressway, and makes a thorough discussion and analysis of the foreign aid project. The enterprise is participating in the construction of the foreign aid project. How to fully prepare for the early stage, draw up detailed work plan according to the actual situation of the project, coordinate the relationship between the company and the recipient government, make good use of existing resources to make good progress, cost and quality, etc. At the same time, the reasonable protection of the interests of the company, the maintenance of the international image of Chinese enterprises, Chinese enterprises in the implementation of foreign aid projects have practical reference value and guiding significance.
【學位授予單位】:大連海事大學
【學位級別】:碩士
【學位授予年份】:2012
【分類號】:F542
【參考文獻】
相關期刊論文 前10條
1 朱瑤宏;國際工程風險實例分析[J];安徽建筑;2001年06期
2 楊合湘,黃瀟;我國項目管理的問題及對策[J];中國創(chuàng)業(yè)投資與高科技;2003年08期
3 李學峰,田立平,于麗梅;對公路工程設計產(chǎn)品質量也要進行監(jiān)督和評定[J];東北公路;1998年04期
4 劉先淼;國內FIDIC公路項目管理模式實踐體會[J];廣東公路交通;1997年S2期
5 李軍,崔若春;淺談高速公路工程進度管理的方法與措施[J];公路;2003年08期
6 張勁文,張起森;高速公路項目管理[J];中外公路;2001年05期
7 劉志偉,白明;非標設備制作工程造價分析[J];化工設備與管道;2004年03期
8 高文華,華澤峰,戚志云;淺談高速公路施工中的工程質量管理問題[J];遼寧交通科技;2005年07期
9 鄭萬勝;邵明剛;;非洲法語區(qū)高速公路項目管理實踐[J];上海商學院學報;2010年05期
10 李明;非標設備造計價算方法探討[J];石油規(guī)劃設計;2002年03期
相關碩士學位論文 前10條
1 白應賢;高速公路項目管理要素分析及研究[D];長安大學;2000年
2 宋科;四川省高速公路ITS工程項目管理研究[D];電子科技大學;2002年
3 秦建軍;高速公路項目建設進度、質量控制及業(yè)主風險管理研究[D];長安大學;2004年
4 賈曉剛;公路工程國際承包項目中的合同管理研究[D];對外經(jīng)濟貿(mào)易大學;2006年
5 王英杰;一航局三公司高速公路項目成本管理研究[D];大連理工大學;2006年
6 樊偉鋒;京珠高速公路新鄉(xiāng)至鄭州段建設項目管理研究[D];天津大學;2006年
7 韓寶睿;高速公路改擴建工程方案研究的關鍵技術分析[D];東南大學;2005年
8 梁海霞;西銅高速公路改擴建工程項目管理研究[D];中國海洋大學;2009年
9 朱云;項目管理在高速公路施工階段的應用研究[D];長安大學;2009年
10 高志堅;國際工程項目管理—阿爾及利亞東西高速公路[D];中國地質大學(北京);2010年
,本文編號:2127822
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2127822.html