【摘要】:由于房地產(chǎn)業(yè)具有投資規(guī)模大、運行風險高、建設(shè)周期久的特點,國內(nèi)調(diào)控房地產(chǎn)政策的陸續(xù)出臺,國際金融政策的收緊,這一系列的問題都會導(dǎo)致該產(chǎn)業(yè)的投資建設(shè)過程中會面臨一定的財務(wù)風險。對項目進行財務(wù)風險管理研究,可以合理的降低投資決策的盲目性,避免投資風險,減少投資成本,從而達到增加開發(fā)商經(jīng)濟利潤的目的,并且會使房地產(chǎn)投資越來越完善,并取得合理進展。本文以項目的財務(wù)風險管理理論和方法為基礎(chǔ),對渭南市西海學(xué)府花園建設(shè)項目財務(wù)風險管理進行了研究。論文主要內(nèi)容包括:(1)渭南市“西海學(xué)府花園”建設(shè)項目財務(wù)風險識別。通過定性分析研究渭南市“西海學(xué)府花園”建設(shè)項目在招投標階段、項目開發(fā)階段、項目施工階段、項目銷售階段四個時期財務(wù)風險,主要表現(xiàn)為籌資風險、投資風險、資金回收風險和利潤分配風險等。(2)渭南市“西海學(xué)府花園”建設(shè)項目財務(wù)風險評估。通過定量分析進行渭南市“西海學(xué)府花園”建設(shè)項目的財務(wù)風險評價,分別研究了該項目的投資估算和資金籌措、基本財務(wù)指標分析、動態(tài)盈利分析、清償能力分析及不確定性分析等。經(jīng)過測算,得出本項目全投資財務(wù)內(nèi)部收益率39.59%大于基準收益率12%;財務(wù)凈現(xiàn)值11634.71萬元大于零;動、靜態(tài)投資回收期均小于項目總開發(fā)期4年,說明項目盈利能力較好,且具有較強的清償能力,本項目滿足財務(wù)的基本要求。(3)渭南市“西海學(xué)府花園”建設(shè)項目財務(wù)風險控制。根據(jù)對項目財務(wù)風險的識別和評價,論文對渭南市“西海學(xué)府花園”建設(shè)項目在招投標階段、開發(fā)階段、施工階段和銷售階段中存在的財務(wù)風險控制進行了分析,主要是控制資金籌資風險、資金投資風險、資金回收風險和利潤分配風險等。
[Abstract]:Because the real estate industry has the characteristics of large scale of investment, high operational risk and long construction cycle, the domestic regulation and control of real estate policy has been introduced one after another, and the international financial policy has been tightened. This series of problems will lead to certain financial risks in the process of investment and construction of the industry. Research on financial risk management of projects can reasonably reduce the blindness of investment decisions, avoid investment risks, and reduce investment costs. In order to increase the economic profits of developers, and make real estate investment more and more perfect, and achieve reasonable progress. This paper based on the financial risk management theory and method of the project, This paper studies the financial risk management of the garden construction project of Xihai University in Weinan City. The main contents of this paper include: (1) the identification of financial risk in the construction project of "Xihai academic Institution Garden" in Weinan City. The qualitative analysis is used to study the "West" of Weinan City. The construction project of Haixue University Garden is in the bidding stage. The financial risks in the four stages of project development, project construction and project sales are mainly shown as financing risk, investment risk, Risk of capital recovery and risk of profit distribution) Financial risk assessment of the construction project of "Xihai University Garden" in Weinan City. Through quantitative analysis, the financial risk assessment of the construction project of "Xihai University Garden" in Weinan City is carried out. The investment estimation and financing, the basic financial index analysis, the dynamic profit analysis, the solvency analysis and the uncertainty analysis of the project are studied respectively. It is concluded that the financial internal return rate of the whole investment of the project is 39.59% more than the benchmark rate of return 12; the net present value of finance is one hundred and sixteen million three hundred and forty-seven thousand and one hundred yuan more than zero; the recovery period of dynamic and static investment is less than 4 years of the total development period of the project, which shows that the profitability of the project is good. The project meets the basic requirements of finance.) Weinan City "Xihai Institute Garden" construction project financial risk control. According to the identification and evaluation of the project financial risk, This paper analyzes the financial risk control in the bidding stage, development stage, construction stage and sales stage of the construction project of Xihai University Garden in Weinan City, which mainly controls the risk of fund raising and capital investment. Risk of capital recovery and risk of profit distribution, etc.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F299.233.42
【參考文獻】
相關(guān)期刊論文 前10條
1 王輝利;;房地產(chǎn)開發(fā)企業(yè)投資決策分析與成本控制研究[J];現(xiàn)代商業(yè);2008年09期
2 陳衛(wèi)軍;母小曼;;房地產(chǎn)項目投資風險綜合評價研究[J];商場現(xiàn)代化;2008年04期
3 彭曉炎;鄒媚;;房地產(chǎn)投資風險識別[J];資源與人居環(huán)境;2007年20期
4 史童偉;劉寧寧;;我國房地產(chǎn)投資風險的防范[J];科技情報開發(fā)與經(jīng)濟;2006年23期
5 畢星,雷榮軍;房地產(chǎn)項目投資風險評價體系初探[J];河北建筑科技學(xué)院學(xué)報;2004年04期
6 粟國敏;房地產(chǎn)項目投資風險評價研究[J];工業(yè)技術(shù)經(jīng)濟;2003年06期
7 郭曉順,戴利斌;企業(yè)集團財務(wù)風險及其控制[J];武漢理工大學(xué)學(xué)報(信息與管理工程版);2003年02期
8 張一帆 ,徐遂;投資風險分析研究方法概述[J];技術(shù)經(jīng)濟與管理研究;2002年04期
9 胡再祥,姜早龍;房地產(chǎn)項目開發(fā)工程造價管理優(yōu)化研究[J];基建優(yōu)化;2002年02期
10 梁爽,李e,
本文編號:1600611
本文鏈接:http://sikaile.net/jingjilunwen/fangdichanjingjilunwen/1600611.html