CD學(xué)院教學(xué)質(zhì)量提升項目的進度控制與協(xié)調(diào)管理
[Abstract]:Teaching quality is the soul of colleges and universities. The effective application of the theory of project schedule control and coordination to the teaching management of colleges and universities is of great importance to the improvement of teaching quality. This paper takes the teaching quality improvement project of CD College as a case, takes the project schedule control and project coordination management knowledge as the guide, and takes the engineering project management standard as the criterion, studies the implementation of the applied undergraduate talent training plan. Aiming at the practical problems in teaching quality management, this paper puts forward some new ideas and measures to solve the problem of improving teaching quality in colleges and universities by project management. Hope to improve the quality of applied undergraduate personnel training play a certain role in guidance. The structure of the thesis is as follows: the first chapter introduces the background and significance of the thesis, and describes the research ideas and technical route. In the second chapter, on the basis of clarifying the related concepts, the theoretical basis of the application of project management to the improvement of teaching quality is expounded. In the third chapter, combining with the problems existing in the teaching quality management of CD college, this paper expounds the background and main measures of the project management of teaching quality in CD college, and analyses the present situation of the project management of teaching quality in CD college, including the project management system. Organization setup, function arrangement, operation mechanism, and student management and safety assurance during project operation. The fourth chapter analyzes the progress control of the CD college teaching quality improvement project, optimizes the progress plan of the project implementation stage, analyzes the dynamic monitoring of the project progress, and puts forward the internal coordination in the project coordination. On the basis of external coordination, this paper studies the solution of teaching quality management problem in CD College. The fifth chapter analyzes the coordinated management of the teaching quality improvement project in CD College, from the aspects of optimizing the learning environment, establishing the evaluation mechanism and research system, strengthening the management and improving the comprehensive quality, etc. The implementation process of the project progress control and project coordination management are evaluated, and the strategies to further improve the teaching quality project management in CD college are given.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:G647
【相似文獻】
相關(guān)期刊論文 前10條
1 李立江;池重;;項目成功與失敗的標(biāo)準(zhǔn)研究[J];河北廣播電視大學(xué)學(xué)報;2006年05期
2 里奇;;項目成功的12個關(guān)鍵原則[J];現(xiàn)代企業(yè)教育;2009年05期
3 戚存杰;;創(chuàng)新項目建設(shè)工作機制的實踐與思考[J];決策探索(下半月);2009年05期
4 馬輝;;公益類項目設(shè)計淺談[J];社會工作(上半月);2010年09期
5 潘誼;什么是社會發(fā)展項目[J];社會福利;2002年09期
6 陳海龍;;高職院校項目教學(xué)中的教師角色研究[J];佳木斯教育學(xué)院學(xué)報;2012年05期
7 屈蘭鋒;屈蘭琴;;淺析項目前期工作的重要性及應(yīng)注意的問題[J];蘭州工業(yè)高等?茖W(xué)校學(xué)報;2010年05期
8 朱光華;;環(huán)保項目建設(shè)對宏觀政策影響機制的研究[J];理論月刊;2007年06期
9 岑燕坤;中國西南世行扶貧項目的運行、特點及借鑒意義[J];黔南民族師范學(xué)院學(xué)報;2001年04期
10 龍光正;張文;王明宇;;基于多維矩陣項目組織在某國防項目中的應(yīng)用[J];管理工程學(xué)報;2005年S1期
相關(guān)會議論文 前10條
1 ;征集項目一覽表[A];2010’第五屆綠色財富(中國)論壇會刊[C];2010年
2 趙彬;焦書長;;“三次會議”制度推進項目穩(wěn)步持續(xù)發(fā)展[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2010)[C];2010年
3 劉中平;周甄;李亞玲;馬韜;;項目團隊組織、分工與工作模式[A];2013年中國航空學(xué)會管理科學(xué)分會學(xué)術(shù)會議論文集[C];2013年
4 陳登慧;郭紅梅;;水土保持執(zhí)法項目目標(biāo)競爭崗位責(zé)任制的形成與效益分析[A];水土保持監(jiān)督管理論文選編[C];2003年
5 馮亮;;用項目管理模式開展ICT外包服務(wù)項目[A];海南省通信學(xué)會學(xué)術(shù)年會論文集(2006)[C];2006年
6 盛漢濱;樊軍;王紀(jì)泉;;杭甬高速公路項目目標(biāo)可持續(xù)發(fā)展評價[A];第一屆全國公路科技創(chuàng)新高層論壇論文集環(huán)保與可持續(xù)發(fā)展卷[C];2002年
7 紀(jì)存興;;項目管理在原子能院核電項目中的應(yīng)用研究[A];中國核科學(xué)技術(shù)進展報告(第二卷)——中國核學(xué)會2011年學(xué)術(shù)年會論文集第10冊(核情報(含計算機技術(shù))分卷、核技術(shù)經(jīng)濟與管理現(xiàn)代化分卷)[C];2011年
8 楊來成;唐慧中;;改革管理機制 搞好藉河項目建設(shè)[A];中國水土保持探索與實踐——小流域可持續(xù)發(fā)展研討會論文集[C];2005年
9 王作功;賈元華;李素芬;;高速公路項目目標(biāo)持續(xù)性評價指標(biāo)體系及方法研究[A];可持續(xù)發(fā)展的中國交通——2005全國博士生學(xué)術(shù)論壇(交通運輸工程學(xué)科)論文集(上冊)[C];2005年
10 袁偉峰;;基于WBS的項目掙值分析及其應(yīng)用[A];2011年中國航空學(xué)會管理科學(xué)分會學(xué)術(shù)交流會議論文集[C];2011年
相關(guān)重要報紙文章 前10條
1 崔晶煒;如何確定項目目標(biāo)?[N];中國計算機報;2004年
2 記者 莊啟e,
本文編號:2345310
本文鏈接:http://sikaile.net/jiaoyulunwen/shifanjiaoyulunwen/2345310.html