向莆鐵路青云山隧道成本控制研究
[Abstract]:Railway, as the largest land transportation system, has undergone many changes to meet the needs of social progress and economic development. The cost and schedule control of railway construction project is also very important to the project itself. For the cost control of railway construction project, its basic purpose is to save investment for the country and society. On the basis of ensuring quality and time limit demand, reasonable cost compression can effectively save waste and obtain benefit and profit. Therefore, based on the study of Qingyun Mountain Tunnel Project, this paper is of great significance to improve the profit level of railway construction enterprises. The main work of this paper is as follows: firstly, this paper expounds the concept and content of project schedule management, introduces the general situation of Qingyun Mountain tunnel project, the quantity of the project, the organization of construction and the requirement of owner's time limit. The comprehensive and systematic understanding of Qingyun mountain tunnel project is realized, and the project schedule is analyzed on the basis of this, which creates the conditions for estimating the cost of Qingyun mountain tunnel project and drawing up the schedule plan in the future. Secondly, this paper expounds the concept and content of project cost management. On the basis of full understanding of Qingyun Mountain Tunnel Project, this paper calculates and integrates the main parts of Qingyun Mountain Tunnel Project cost. According to the project schedule, the project cost plan of Qingyun mountain tunnel is worked out, and the cost composition of Qingyun mountain tunnel project is analyzed, and the profit and loss analysis is carried out by comparing the project plan value with the actual value. Thirdly, this paper expounds the concept and content of earned value management, mainly including three basic parameters and four analysis indexes of earned value management, on the basis of the progress cost analysis mentioned above, This paper analyzes the deviation analysis and performance analysis of the progress and cost synthesis of Qingyun Mountain Tunnel Project. Aiming at the problems in the process of project implementation, the corresponding technical and organizational guarantee measures are put forward, which provide help for guiding the actual production of the project. The cost progress analysis of Qingyunshan Tunnel Project in Xiangpu Railway plays a guiding and reference role to the construction practice of the project, and also provides a reference for the cost and schedule management of similar railway projects.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:U455.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 林煒桐,左小明;價(jià)值工程在成本控制中的作用[J];財(cái)會(huì)通訊;2004年11期
2 姜慧;董非;殷惠光;;施工企業(yè)項(xiàng)目成本控制體系的建立與應(yīng)用[J];常熟理工學(xué)院學(xué)報(bào);2007年10期
3 曹燕紅;中外企業(yè)成本管理比較研究[J];北方經(jīng)貿(mào);2003年11期
4 張望秋;;淺談加強(qiáng)鐵路工程項(xiàng)目成本管理的方法和途徑[J];建設(shè)機(jī)械技術(shù)與管理;2006年10期
5 董怡;;進(jìn)口貿(mào)易與中國(guó)經(jīng)濟(jì)增長(zhǎng)互動(dòng)關(guān)系探析[J];經(jīng)濟(jì)與管理;2007年02期
6 孫力浩;張新生;;國(guó)有施工企業(yè)項(xiàng)目成本控制對(duì)策思考[J];經(jīng)濟(jì)論壇;2007年16期
7 肖芳林;淺議施工項(xiàng)目質(zhì)量成本控制[J];經(jīng)濟(jì)師;2002年02期
8 肖輝;;淺談施工企業(yè)項(xiàng)目成本控制與施工索賠[J];山西建筑;2007年29期
9 劉黎;施工企業(yè)工程項(xiàng)目成本的考核評(píng)價(jià)工作[J];科技情報(bào)開(kāi)發(fā)與經(jīng)濟(jì);2005年03期
10 霍忠鋒,郝毅君,楊學(xué)武;試論成本系統(tǒng)控制工程的實(shí)施[J];煤炭經(jīng)濟(jì)研究;2004年11期
,本文編號(hào):2454953
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2454953.html