A市M110kV變電站擴(kuò)建工程的投資分析
[Abstract]:With the development of economy, the demand for power energy is becoming more and more prominent. In order to meet the increasing demand for power supply under the economic prosperity, the construction and transformation of power grid become more and more frequent. Engineering construction cost plays an important role in the production and operation cost composition of power supply enterprises. Therefore, it is of great significance to carry out academic research on the investment of engineering construction projects. Power engineering investment is a relatively controllable investment under the condition of relevant national policies. Because the management construction of power transmission and transformation project in electric power industry is a production and consumption process with multiple participation, complex internal structure and long period, The project management in the electric power industry must pay attention to the cost management and benefit management of the whole investment at the beginning of the investment stage, track the project cost information in real time, collect, input and save the data in time. A systematic process of engineering investment analysis, a complete investment plan, prior control, real-time analysis of uncertain sensitive factors such as site selection, safety, quality, etc., are established, which can be controlled and controlled. The management of engineering investment in electric power industry refers to the coordinated control of five processes from research and establishment to construction drawing design, bidding, construction, completion and acceptance, and settlement. In the process of project implementation, in order to realize the project construction management, the electric power industry has built a software platform which is based on ERP and supplemented by various auxiliary decision software, and has compiled the characteristic project cost quota according to the national laws and regulations. These conditions have laid a solid foundation for the analysis of economic activities of engineering construction. This paper takes M110KV substation of A city as the research object, on the basis of combing, inducting cost management, risk control, project cost and other investment theories, adopting the method of combining theoretical research with empirical analysis, qualitative analysis and quantitative analysis. The investment estimation, financing, bidding and contract management of M substation extension project are systematically analyzed. Combined with the actual situation of M110kV substation project, the installation project and debugging project are selected for case analysis. In view of the problems in engineering construction, the improvement measures of project investment control to increase economic benefit are put forward.
【學(xué)位授予單位】:南昌大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TM63;F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙庭紅;盲數(shù)的BM模型在經(jīng)濟(jì)管理中的應(yīng)用[J];商業(yè)研究;2004年03期
2 王春宇;風(fēng)險(xiǎn)投資評(píng)估與傳統(tǒng)項(xiàng)目評(píng)估的比較分析[J];船舶工業(yè)技術(shù)經(jīng)濟(jì)信息;2005年08期
3 黃蘭敏;吳艷;;風(fēng)險(xiǎn)投資評(píng)估的模糊數(shù)學(xué)模型[J];重慶工商大學(xué)學(xué)報(bào).西部論壇;2006年S2期
4 周孔均;李海俊;侯興哲;;全壽命周期成本(LCC)理論在電能表管理中的應(yīng)用[J];電測(cè)與儀表;2006年10期
5 潘佳林,扶縛龍;風(fēng)險(xiǎn)投資項(xiàng)目評(píng)估的模糊多目標(biāo)群決策方法[J];當(dāng)代經(jīng)濟(jì)管理;2005年02期
6 李振宇;徐蓉;尚斌;李海波;;數(shù)字化變電站建設(shè)中的難點(diǎn)與對(duì)策[J];電力建設(shè);2008年08期
7 侯建設(shè);吳輝;;南陽(yáng)西500kV變電站工程施工質(zhì)量管理[J];電力建設(shè);2009年09期
8 王有元;袁園;李劍;楊麗君;李寅偉;;變壓器油紙絕緣可靠性的威布爾混合評(píng)估模型[J];高電壓技術(shù);2010年04期
9 周喜軍;黃華煒;戈京;王昕;;抽水蓄能電站運(yùn)行方式的LCC研究[J];華東電力;2006年07期
10 韓天祥;李莉華;余穎輝;;用LCC方法對(duì)500kV變電站改造的經(jīng)濟(jì)性評(píng)價(jià)[J];華東電力;2007年08期
本文編號(hào):2360494
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2360494.html