BT模式下工程施工企業(yè)的合同與建設(shè)管理
[Abstract]:Since the 21st century, the Chinese government has encouraged the social capital to participate in the construction investment through BTO bot model, aiming at the needs of the domestic infrastructure construction and investment system reform, and the engineering construction enterprises as the main force of the infrastructure construction. Actively expand the business sector, BT model to participate in infrastructure investment and construction. But up to now, there is no uniform BT model project contract standard and construction standard. Most construction enterprises encounter many bottleneck problems of contract and construction management in the project investment and construction under BT mode, which lead to project investment failure, contract disputes and loss of corresponding market. In this paper, the key links of "three control" management of contract and construction in construction enterprises under BT mode are taken as the research object, including the market analysis and selection of BT project contract management, project quality, progress, and so on. The main points of cost control management are analyzed and studied. Using the relevant knowledge of management, economics and contract management theory, combined with practical cases to analyze and summarize the problems. Based on the analysis of the structural content design, performance management difficulties and the weak links of project quality, schedule and cost management in the project management practice of engineering construction enterprises under BT mode, the corresponding solutions are put forward. The management methods for these problems are studied. It provides a reference for engineering construction enterprises to participate in BT project construction operation management, at the same time, in the current domestic theoretical circle of investors (construction enterprises) perspective of BT mode theory research is lacking, management norms are blank, Promote the industry investors to BT mode construction project management system research.
【學(xué)位授予單位】:武漢工程大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU723.1
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 嚴(yán)玲;趙華;楊苓剛;;BT建設(shè)模式下回購(gòu)總價(jià)的確定及控制策略研究[J];財(cái)經(jīng)問題研究;2009年12期
2 劉應(yīng)宗;周曉麗;;運(yùn)用BT模式進(jìn)行城市軌道交通建設(shè)[J];重慶交通大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2007年03期
3 曠開萃;;政府視角下的BOT項(xiàng)目實(shí)施研究[J];重慶建筑;2011年06期
4 謝明輝;呂秉虹;;BT模式建設(shè)保障性住房之律師實(shí)務(wù)探析[J];法治研究;2011年08期
5 費(fèi)磊;;國(guó)有建筑施工企業(yè)人力資源培訓(xùn)與開發(fā)的探索[J];經(jīng)營(yíng)管理者;2011年11期
6 翟文生;;淺談項(xiàng)目管理中的進(jìn)度控制[J];工業(yè)設(shè)計(jì);2011年07期
7 徐恒升;施工項(xiàng)目成本控制中的問題與對(duì)策[J];基建優(yōu)化;2004年06期
8 鐘煒;王博;;BT項(xiàng)目回購(gòu)階段業(yè)主方回購(gòu)價(jià)款確定分析[J];建筑經(jīng)濟(jì);2010年09期
9 周鳳榮;;BT模式投資項(xiàng)目的招標(biāo)合同籌劃[J];建筑市場(chǎng)與招標(biāo)投標(biāo);2008年03期
10 鄧麗瓊;;建設(shè)項(xiàng)目管理中工程的進(jìn)度控制[J];科技信息(學(xué)術(shù)研究);2008年06期
本文編號(hào):2139517
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2139517.html