【摘要】:2009年6月,國(guó)網(wǎng)公司正式啟動(dòng)電網(wǎng)GIS地理信息服務(wù)平臺(tái)建設(shè),2010年完成了平臺(tái)的典型設(shè)計(jì)和基礎(chǔ)功能開(kāi)發(fā)。新疆電網(wǎng)作為第二批推廣單位,于2012年1月正式啟動(dòng)電網(wǎng)GIS地理信息服務(wù)平臺(tái)的建設(shè)工作。GIS平臺(tái)需要采集10kV電壓等級(jí)以上的高壓線路地理信息數(shù)據(jù),以及變電站、配電站及電廠等等的地理信息數(shù)據(jù)。 根據(jù)國(guó)網(wǎng)公司的企業(yè)標(biāo)準(zhǔn)要求,所有數(shù)據(jù)必須采用統(tǒng)一的坐標(biāo)和高程系統(tǒng)。建立GPS基準(zhǔn)站可以統(tǒng)一采集的數(shù)據(jù)系統(tǒng),滿足國(guó)網(wǎng)公司GIS平臺(tái)建設(shè)的要求。新疆地域非常廣闊,電網(wǎng)資產(chǎn)龐大且分散,數(shù)據(jù)采集工作量非常大。這樣需要建設(shè)的GPS基準(zhǔn)站的數(shù)量也很多,耗費(fèi)的建設(shè)資金很大。 如何獲得最優(yōu)秀的GPS基準(zhǔn)站建設(shè)方案是本文研究的目的。 本文擬采用全壽命周期成本理論,分析GPS基準(zhǔn)站建設(shè)工程的階段劃分、各階段的成本,研究建立GPS基準(zhǔn)站網(wǎng)形選擇和GPS主設(shè)備選型的全壽命周期成本管理的數(shù)學(xué)模型。以烏魯木齊地區(qū)作為一個(gè)采樣點(diǎn),通過(guò)對(duì)一系列模擬數(shù)據(jù)進(jìn)行計(jì)算和分析,得出如下結(jié)論:新疆電網(wǎng)數(shù)據(jù)采集的GPS基準(zhǔn)站組網(wǎng)的最佳方案是主輔站技術(shù),最適合的GPS主設(shè)備類型是先采用能接收兩種GPS系統(tǒng)信號(hào)的雙星GPS設(shè)備,當(dāng)?shù)谌NGPS系統(tǒng)成熟運(yùn)用時(shí)再升級(jí)到能接收三種GPS系統(tǒng)信號(hào)的三星GPS設(shè)備。 通過(guò)本文的研究,力圖擴(kuò)大全壽命周期理念的傳播范圍及領(lǐng)域,鼓勵(lì)在各行各業(yè)進(jìn)行全壽命周期成本管理的應(yīng)用,在實(shí)現(xiàn)功能的前提下,選擇最佳方案,節(jié)省工程建設(shè)費(fèi)用。
[Abstract]:In June 2009, China Power Grid Company officially started the construction of GIS GIS service platform, and completed the typical design and basic function development of the platform in 2010.Xinjiang Power Grid, as the second batch of extension units, officially started the construction of GIS GIS service platform in January, 2012. The GIS platform needs to collect high voltage line geographic information data above 10kV voltage level, as well as substations.Geographic information data for distribution stations and power plants, etc.According to the company's enterprise standards, all data must be a unified coordinate and elevation system.The establishment of GPS datum station can unify the collected data system to meet the requirements of GIS platform construction of national network company.Xinjiang area is very broad, power grid assets are huge and scattered, data acquisition workload is very large.In this way, the number of GPS base stations that need to be built is also a lot, and the cost of construction is very large.How to obtain the best GPS reference station construction plan is the purpose of this paper.In this paper, the life-cycle cost theory is used to analyze the stage division and cost of GPS reference station construction project. The mathematical model of GPS reference station network selection and GPS master equipment selection is established.Taking Urumqi area as a sampling point, through the calculation and analysis of a series of simulated data, the following conclusions are drawn: the best scheme of GPS datum station for data acquisition in Xinjiang Power Grid is the main and auxiliary station technology.The most suitable type of GPS main equipment is to first adopt two-star GPS equipment which can receive two kinds of GPS system signals, and then upgrade to Samsung GPS device which can receive three kinds of GPS system signals when the third kind of GPS system is ripe for use.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:P228.4;F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 尹玫;朱合華;閆治國(guó);;盾構(gòu)隧道全壽命周期成本分析方法研究[J];地下空間與工程學(xué)報(bào);2010年S1期

2 王治憲;金萃;;關(guān)于建設(shè)項(xiàng)目全壽命周期成本的分析與思考[J];電力學(xué)報(bào);2008年02期

3 馬馴,劉道義;地理信息系統(tǒng)(GIS)在輸電線路工程管理中的開(kāi)發(fā)與應(yīng)用[J];電力建設(shè);2000年04期

4 高頌九;配電網(wǎng)地理信息系統(tǒng)在縣城配電網(wǎng)規(guī)劃與設(shè)計(jì)中的應(yīng)用[J];電網(wǎng)技術(shù);2001年12期

5 朱基木,余正環(huán),韓天祥;用全壽命周期成本方法對(duì)新建機(jī)組額定參數(shù)的選型決策[J];華東電力;2004年11期

6 馬曉久;石峰;劉鵬偉;白潔;李清;;全壽命周期成本管理簡(jiǎn)介及應(yīng)用分析[J];河南電力;2006年04期

7 邵長(zhǎng)利;喬光林;;±500kV直流輸電線路絕緣設(shè)計(jì)方案全壽命費(fèi)用決策[J];吉林電力;2006年02期

8 何鑫;鄧榕;;房地產(chǎn)項(xiàng)目應(yīng)用全壽命周期成本控制的可行性[J];經(jīng)營(yíng)與管理;2010年06期

9 韓文慶;叢培瑞;吳鵬;;某變電站站內(nèi)道路設(shè)計(jì)全壽命周期成本分析[J];山西建筑;2011年23期

10 姜益民;;變壓器的全壽命周期成本分析[J];上海電力;2004年03期

相關(guān)碩士學(xué)位論文 前2條

1 李汝霞;全壽命周期成本理論在高速公路建設(shè)方案決策中的應(yīng)用研究[D];長(zhǎng)沙理工大學(xué);2008年

2 趙穎;基于全壽命周期管理理論的青島錯(cuò)埠嶺220kV輸變電項(xiàng)目管理研究[D];華北電力大學(xué)(河北);2009年



本文編號(hào):1728067

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/1728067.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶2c4e5***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com