長(zhǎng)春燃?xì)夤竟艿拦こ谈脑祉?xiàng)目的成本管理研究
本文關(guān)鍵詞:長(zhǎng)春燃?xì)夤竟艿拦こ谈脑祉?xiàng)目的成本管理研究 出處:《吉林大學(xué)》2014年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 燃?xì)夤艿栏脑?/b> 項(xiàng)目成本管理 項(xiàng)目成本控制
【摘要】:隨著城市化進(jìn)程的不斷推進(jìn)和深入,能源行業(yè)發(fā)展迅猛,天然氣作為經(jīng)濟(jì)安全、綠色環(huán)保的清潔能源,其發(fā)展速度更是有目共睹。但是在燃?xì)馐聵I(yè)發(fā)展的同時(shí),由于受過去年代材質(zhì)、施工技術(shù)等因素影響,燃?xì)夤芫W(wǎng)老化斷裂燃?xì)馐鹿蕰r(shí)有發(fā)生,給百姓的生命財(cái)產(chǎn)安全帶來很大的威脅。長(zhǎng)春燃?xì)庾鳛榧质∽畲蟮墓艿廊細(xì)馍鲜泄荆淝吧黹L(zhǎng)春市煤氣公司,始建于日偽時(shí)期的1924年,至今有90年的歷史,目前擁有市區(qū)燃?xì)庥脩?0.3萬戶,2846公里管網(wǎng)。在管網(wǎng)改造前的2008年,有燃?xì)夤芫W(wǎng)2484公里,高危管網(wǎng)達(dá)57%,每年事故頻發(fā),且出現(xiàn)多起惡性事故,引起了政府、社會(huì)的高度關(guān)注,燃?xì)馀f管網(wǎng)改造勢(shì)在必行。燃?xì)夤芫W(wǎng)改造工程是一項(xiàng)涉及范圍廣,投資大,跨期長(zhǎng)的工程,不僅需要進(jìn)行嚴(yán)格的項(xiàng)目管理,而在項(xiàng)目管理的諸多內(nèi)容中,項(xiàng)目的成本管理影響著項(xiàng)目最終的成本效益,對(duì)最終實(shí)現(xiàn)改造任務(wù)起到至關(guān)重要的作用。 本文從項(xiàng)目成本角度入手深入分析了長(zhǎng)春燃?xì)夤艿拦こ谈脑祉?xiàng)目的管理問題,根據(jù)對(duì)改造項(xiàng)目的實(shí)施進(jìn)行的可行性分析,從政策、經(jīng)濟(jì)、技術(shù)、組織等角度論證了長(zhǎng)春燃?xì)夤艿栏脑斓目尚行。同時(shí)分析了管道改造過程中存在的成本高,控制難等問題,結(jié)合項(xiàng)目成本管理的相關(guān)理論,設(shè)計(jì)了長(zhǎng)春燃?xì)夤艿拦こ谈脑祉?xiàng)目的成本管理研究方案。項(xiàng)目成本管理的目標(biāo)是通過多種成本管理方法使得項(xiàng)目的成本控制在預(yù)算之內(nèi),實(shí)現(xiàn)降低成本,,效益最大化的目標(biāo)。但受到燃?xì)夤艿栏脑祉?xiàng)目范圍、時(shí)間等因素的約束,使得成本的降低和控制很難實(shí)現(xiàn);谝陨戏治,第一步對(duì)長(zhǎng)春燃?xì)夤艿拦こ谈脑祉?xiàng)目制定成本管理計(jì)劃,初步明確該項(xiàng)目成本管理的過程和步驟;第二步通過對(duì)此次燃?xì)夤艿栏脑祉?xiàng)目進(jìn)行估算和詳細(xì)預(yù)算,為成本控制提供參考標(biāo)準(zhǔn),給績(jī)效考評(píng)提供依據(jù);第三步在此次燃?xì)夤艿栏脑祉?xiàng)目進(jìn)行過程中對(duì)成本采取控制,運(yùn)用目標(biāo)成本管理和全過程成本控制方法,結(jié)合各階段成本發(fā)生的主要內(nèi)容和特點(diǎn),對(duì)各階段的成本進(jìn)行控制。 長(zhǎng)春燃?xì)庠谌細(xì)夤艿栏脑爝^程中,還應(yīng)制定和建立相應(yīng)的保障措施來輔助改造項(xiàng)目成本管理方案的實(shí)施。其一,加強(qiáng)成本管理組織建設(shè),從組織架構(gòu)方面保證此次燃?xì)夤艿栏脑祉?xiàng)目的順利進(jìn)行;其二,建立成本管理流程,使改造項(xiàng)目進(jìn)行中每一步都有標(biāo)準(zhǔn)可依,該流程不僅適用于此次燃?xì)夤艿栏脑,還為以后的管道改造提供借鑒;其三,完善成本控制信息系統(tǒng),通過引入計(jì)算機(jī)系統(tǒng)來保證項(xiàng)目成本數(shù)據(jù)的準(zhǔn)確性和提高成本核算、分析、考核的效率。
[Abstract]:With the rapid development of urbanization and the deepening of the development of energy industry , natural gas is a clean energy source of economic security and environmental protection . Based on the analysis of the feasibility of the project cost management , this paper analyzes the feasibility of the reform of Changchun Gas Pipeline Project by analyzing the feasibility of the project cost management . The aim of the project cost management is to provide a cost management plan for the project cost control by means of various cost management methods . The aim of the project cost management is to provide the reference standard for cost control and to provide the basis for cost control . In the process of gas pipeline reconstruction , Changchun gas should also formulate and establish corresponding safeguard measures to assist the implementation of the project cost management scheme . First , strengthen the construction of cost management organization , ensure the smooth progress of the gas pipeline reconstruction project from the organizational structure ; secondly , establish the cost management process , make the reconstruction project carry on every step have the standard applicable , the process not only is suitable for the reconstruction of the gas pipeline , but also provides reference for the later pipeline transformation ; thirdly , improve the cost control information system , ensure the accuracy of the project cost data and improve the cost accounting , analysis and examination efficiency by introducing the computer system .
【學(xué)位授予單位】:吉林大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU723.3;TU996
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫德青;姚安林;趙忠剛;;我國(guó)城市燃?xì)馐聵I(yè)的發(fā)展趨勢(shì)[J];城市燃?xì)?2006年09期
2 李成玲;;管理信息系統(tǒng)在工程項(xiàng)目成本管理中的運(yùn)用[J];電腦知識(shí)與技術(shù);2006年23期
3 汪清波,肖營(yíng);建筑施工項(xiàng)目成本控制和管理[J];工程質(zhì)量;2005年11期
4 李劍洲;;基于濱城電房項(xiàng)目改造工程施工管理研究[J];電源技術(shù)應(yīng)用;2012年12期
5 房啟軍;;公路工程招標(biāo)階段的造價(jià)控制和管理[J];科技創(chuàng)新與應(yīng)用;2013年15期
6 顧春雷;;論工程項(xiàng)目管理及項(xiàng)目成本控制[J];華章;2010年04期
7 皮娟娟;;工程項(xiàng)目招標(biāo)階段的造價(jià)管理[J];河南建材;2009年01期
8 盧飛寶;;城市燃?xì)夤芫W(wǎng)施工及管理探討[J];技術(shù)與市場(chǎng);2011年07期
9 王恩茂;劉曉君;;施工項(xiàng)目成本管理模式研究[J];建筑技術(shù);2005年12期
10 陳煒地;;論建設(shè)工程施工招標(biāo)階段的造價(jià)控制[J];建筑經(jīng)濟(jì);2008年06期
本文編號(hào):1401739
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/1401739.html