城際鐵路施工承包商的外部行為風(fēng)險(xiǎn)研究
[Abstract]:The construction of intercity railway has been paid more and more attention by the government and the public. In the construction implementation period, inter-city railway construction contractors encountered from natural, social and other aspects of risk. Among the risk factors of the project, the behavior risk of the external subject encountered by the construction contractor is more and more prominent. These external behavioral risks will affect the realization of the project objectives. If not controlled, it will directly affect the smooth progress of the inter-city railway project construction. It can even cause serious economic losses and casualties. Therefore, it is necessary to study the external risk of intercity railway construction contractor. Firstly, from the angle of inter-city railway construction contractor, combined with the literature, this paper analyzes the external behavior risk factors of the construction contractor, and completes the identification and analysis of the external behavior risk of the inter-city railway construction contractor. Then the risk of credit behavior arising from the inability of the external subject to perform the contract, This paper probes into the forming mechanism of the behavior risk from three angles: the moral behavior risk caused by the external subject pursuing the maximization of its own interests and the ability behavior risk caused by the external subject's own insufficient capacity, which is regarded as the initial list of the risks. Based on a large number of field investigations and Delphi's expert consultation method, a set of index system of external behavior risk assessment of intercity railway construction contractor is constructed, which is based on a questionnaire survey on the specific behavior of the external subject of the construction contractor. These include 6 first-level indicators, 9 second-level indicators and 21 third-level indicators. The first grade indicators are: the behavior risk of the owner, the behavior risk of the supervision engineer, the behavior risk of the designer, the behavior risk of the material and equipment supplier, the behavior risk of the personnel of the government administrative department, and the behavior risk of residents and units along the line. At the same time, the detailed grading rules are put forward for the three-level index. The external behavior risk assessment model of intercity railway contractor is established by grey weight clustering method. This method not only fully absorbs the expert evaluation knowledge and experience, but also quantifies the judgment of some subjects' behavior risk which is not clearly defined, and provides a practical and simple evaluation method for the actual project. Finally, the control measures of the exterior behavior risk of the intercity railway contractor are given. This paper enriches and perfects the risk management theory of inter-city railway construction project by studying the external behavior risk of inter-city railway construction contractor. This paper attempts to provide theoretical guidance and practical reference for the evaluation of external behavior risk process of intercity railway construction contractors in the future.
【學(xué)位授予單位】:長沙理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2012
【分類號】:F532;F426.92;F224
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃慶潮;池利兵;湯宇軒;胡春斌;;區(qū)域城際軌道交通功能定位與建設(shè)標(biāo)準(zhǔn)[J];城市交通;2010年04期
2 唐文彬;張飛漣;李晶晶;;基于模糊網(wǎng)絡(luò)分析法的城際鐵路建設(shè)項(xiàng)目風(fēng)險(xiǎn)評價(jià)研究[J];鐵道科學(xué)與工程學(xué)報(bào);2011年04期
3 任玉瓏,吳國生,許勁,張渝;工程項(xiàng)目參與主體行為的經(jīng)濟(jì)學(xué)分析[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);2004年04期
4 向鵬成;任宏;鐘韻;馮迎賓;;信息不對稱理論的工程項(xiàng)目主體行為博弈分析[J];重慶大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年10期
5 張志勤;宋元?jiǎng)?;城際鐵路最大坡度研究[J];高速鐵路技術(shù);2011年01期
6 謝如鶴,宗巖,王榮華,邱祝強(qiáng);城際鐵路客運(yùn)公交化的綜合評價(jià)[J];廣州大學(xué)學(xué)報(bào)(自然科學(xué)版);2005年01期
7 任志濤,張世英;業(yè)主和承包商的尋租分析[J];河北建筑科技學(xué)院學(xué)報(bào);2004年01期
8 童雅琴;汪法頻;;艱難延伸的大動(dòng)脈——道路施工干擾現(xiàn)象透視[J];建筑;2011年16期
9 周士富;;經(jīng)濟(jì)管理中的決策分析方法[J];經(jīng)濟(jì)管理;1980年09期
10 曹玉明;淺談公路施工企業(yè)經(jīng)營風(fēng)險(xiǎn)與風(fēng)險(xiǎn)防范[J];經(jīng)濟(jì)問題;2002年07期
相關(guān)重要報(bào)紙文章 前1條
1 叢培經(jīng);[N];建筑時(shí)報(bào);2004年
相關(guān)博士學(xué)位論文 前1條
1 張飛漣;鐵路建設(shè)項(xiàng)目后評價(jià)理論與方法的研究[D];中南大學(xué);2004年
相關(guān)碩士學(xué)位論文 前4條
1 毛惠林;中國鐵路建設(shè)工程管理問題與對策研究[D];中南大學(xué);2004年
2 胡和昌;鐵路監(jiān)理組織績效與薪酬設(shè)計(jì)的研究[D];西南交通大學(xué);2007年
3 冉龍華;鐵路工程項(xiàng)目施工風(fēng)險(xiǎn)管理及對策研究[D];西南交通大學(xué);2007年
4 周華;鐵路特別繁忙干線風(fēng)險(xiǎn)評估指標(biāo)體系的研究[D];北京交通大學(xué);2010年
本文編號:2273644
本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2273644.html