施工組織設(shè)計(jì)對(duì)公路項(xiàng)目成本的影響研究

發(fā)布時(shí)間:2018-07-23 13:50
【摘要】:隨著我國(guó)加入WTO,建筑市場(chǎng)經(jīng)濟(jì)體制的建立和不斷完善,建筑市場(chǎng)的競(jìng)爭(zhēng)越來(lái)越激烈,而要在這種環(huán)境下求得生存與發(fā)展,就必須不斷提高自身的核心競(jìng)爭(zhēng)力和管理水平。只有通過這兩方面的加強(qiáng)來(lái)對(duì)項(xiàng)目質(zhì)量、工期、成本進(jìn)行控制,才能有盈利的空間,才能爭(zhēng)取到市場(chǎng)占有的主動(dòng)權(quán)?梢姳疚牡难芯渴鞘钟斜匾摹 本文主要通過對(duì)施工項(xiàng)目的特點(diǎn)、成本構(gòu)成,以及施工組織設(shè)計(jì)所包含的內(nèi)容進(jìn)行了分析,在此基礎(chǔ)上對(duì)施工組織設(shè)計(jì)影響公路項(xiàng)目成本的因素進(jìn)行了識(shí)別,然后運(yùn)用了ISM模型對(duì)影響因素進(jìn)行了結(jié)構(gòu)分析,得出了影響公路項(xiàng)目成本的二大主要因素,施工方案和資源配置計(jì)劃,并針對(duì)于這二個(gè)因素分別運(yùn)用了模糊層次分析法和蟻群算法對(duì)其進(jìn)行優(yōu)化,最后結(jié)合具體項(xiàng)目對(duì)施工方案的比選進(jìn)行了實(shí)證分析,并提出了優(yōu)化施組控制成本的相關(guān)建議。 本文在上述研究領(lǐng)域取得的成果有: (1)對(duì)施工組織設(shè)計(jì)與公路項(xiàng)目成本的關(guān)系進(jìn)行了分析,并對(duì)公路施工項(xiàng)項(xiàng)目的特點(diǎn)在公路工程和工程施工兩方面作出了總結(jié)。將公路施工項(xiàng)目的成本構(gòu)成按照時(shí)間、生產(chǎn)費(fèi)用計(jì)入成本的防范以及成本費(fèi)用目標(biāo)進(jìn)行了劃分,確定了施工組織設(shè)計(jì)的主要內(nèi)容。 (2)研究了ISM模型的基本概念、應(yīng)用程序;通過使用ISM模型對(duì)施工組織設(shè)計(jì)影響項(xiàng)目成本的因素做了結(jié)構(gòu)分析,得出施工方案和資源的優(yōu)化配置對(duì)成本影響最為重要的結(jié)論。 (3)對(duì)公路項(xiàng)目施工方案比選的重要性及確定的前提條件作了闡述;對(duì)模糊層次分析法的基本概念以及應(yīng)用程序進(jìn)行了深入研究。最后,應(yīng)用該法對(duì)施工方案進(jìn)行了比選研究。 (4)在實(shí)證分析中,結(jié)合惠興高速第16合同段,應(yīng)用ISM模型對(duì)其影響成本的因素進(jìn)行了結(jié)構(gòu)性分析;并用模糊層次法對(duì)施工方案進(jìn)行了比選,最終選擇了方案C;最后提出了優(yōu)化施工組織設(shè)計(jì)以降低成本的措施。
[Abstract]:With China's entry into WTO, the construction market economy system has been established and perfected, and the competition in the construction market is becoming more and more fierce. However, in order to survive and develop in this environment, we must constantly improve our core competitiveness and management level. Only through the strengthening of these two aspects to control the project quality, time limit and cost, can there be profit space and gain the initiative power of the market. Therefore, the study of this paper is very necessary. Based on the analysis of the characteristics of the construction project, the composition of the cost and the contents of the construction organization design, this paper identifies the factors that affect the cost of the highway project in the design of the construction organization. Then using the ISM model to carry on the structure analysis to the influence factor, has obtained the two main factors which influence the highway project cost, the construction plan and the resources disposition plan, Aiming at these two factors, fuzzy analytic hierarchy process (FAHP) and ant colony algorithm (ACA) are used to optimize them respectively. Finally, combined with specific projects, the comparison and selection of construction schemes are analyzed empirically, and the relevant suggestions for optimizing the cost of construction group control are put forward. The achievements of this paper are as follows: (1) the relationship between construction organization design and highway project cost is analyzed, and the characteristics of highway construction item are summarized in two aspects: highway engineering and engineering construction. The cost composition of highway construction project is divided according to time, production cost into cost prevention and cost target, and the main content of construction organization design is determined. (2) the basic concept of ISM model is studied. By using the ISM model, the factors that influence the project cost of the construction organization design are analyzed. The conclusion that the optimal allocation of construction plan and resources has the most important effect on the cost. (3) the importance of the comparison and selection of the construction plan of highway project and the presupposition of the determination are expounded. The basic concept and application program of fuzzy analytic hierarchy process (FAHP) are studied. Finally, this paper makes a comparative study on construction scheme by using this method. (4) in the empirical analysis, combined with the 16th contract section of Huexing Expressway, ISM model is used to analyze the factors that affect the cost. The method of fuzzy hierarchy is used to compare and select the construction scheme, and finally, the measures of optimizing the construction organization design to reduce the cost are put forward.
【學(xué)位授予單位】:中南大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2012
【分類號(hào)】:F285;F542

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 張志文;;淺析施工企業(yè)如何進(jìn)行工程項(xiàng)目成本控制[J];電力標(biāo)準(zhǔn)化與技術(shù)經(jīng)濟(jì);2006年04期

2 梅國(guó)青;;市場(chǎng)經(jīng)濟(jì)條件下國(guó)內(nèi)外施工項(xiàng)目成本管理比較及對(duì)策[J];黨史文苑;2005年24期

3 闕濟(jì)興;網(wǎng)絡(luò)計(jì)劃技術(shù)在施工進(jìn)度控制中的應(yīng)用[J];福建建筑;2003年02期

4 張永慶,劉長(zhǎng)利;網(wǎng)絡(luò)計(jì)劃法在廣電網(wǎng)絡(luò)工程施工組織設(shè)計(jì)中的應(yīng)用[J];廣播與電視技術(shù);2002年07期

5 王清洲;劉淑艷;;施工組織設(shè)計(jì)對(duì)工程成本的影響[J];河北交通科技;2006年01期

6 周曉靜,李恒東,肖瑞江;施工項(xiàng)目成本控制體系的評(píng)價(jià)[J];哈爾濱建筑大學(xué)學(xué)報(bào);2002年04期

7 唐智奮;工期—成本優(yōu)化的網(wǎng)絡(luò)分析方法[J];建設(shè)機(jī)械技術(shù)與管理;2001年12期

8 宋越;;成本控制是施工企業(yè)的管理重點(diǎn)[J];決策探索;2006年10期

9 伏志宏;施工組織設(shè)計(jì)與控制投資[J];經(jīng)濟(jì)師;2000年05期

10 谷蘭;淺談道路工程施工組織設(shè)計(jì)[J];經(jīng)濟(jì)師;2001年07期

相關(guān)博士學(xué)位論文 前1條

1 熊鷹;施工項(xiàng)目資源優(yōu)化配置理論和方法[D];北京交通大學(xué);2008年

相關(guān)碩士學(xué)位論文 前4條

1 尹華麗;施工組織對(duì)施工項(xiàng)目成本的影響分析[D];山東大學(xué);2007年

2 樊建國(guó);施工組織對(duì)公路施工項(xiàng)目的成本影響研究[D];河北工業(yè)大學(xué);2007年

3 宋艷艷;長(zhǎng)平高速公路施工成本管理研究[D];中國(guó)海洋大學(xué);2009年

4 蘭鳴;建設(shè)工程施工組織設(shè)計(jì)優(yōu)化研究[D];北京林業(yè)大學(xué);2010年

,

本文編號(hào):2139613

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/jingjilunwen/jtysjj/2139613.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶08d6e***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com