收益最大化的BOO項(xiàng)目投融資比例研究
發(fā)布時(shí)間:2018-05-25 09:26
本文選題:運(yùn)營成本 + 還款方式及金額; 參考:《西安工業(yè)大學(xué)》2015年碩士論文
【摘要】:目前,隨著我國經(jīng)濟(jì)的不斷發(fā)展,改革開放的不斷深入,陳舊的基礎(chǔ)設(shè)施建設(shè)理念已經(jīng)無法滿足廣大人民群眾的需求。進(jìn)而,開拓一種能夠推動經(jīng)濟(jì)快速發(fā)展的,有效的基礎(chǔ)設(shè)施建設(shè)途徑已經(jīng)迫在眉睫。此時(shí),以BOO、BOT以及BT為主的,新型建設(shè)融資模式應(yīng)運(yùn)而生。以BOO及相似模式為代表的私人資金的引入,有效地解決了我國財(cái)政資金的短缺與急需投資建設(shè)的基礎(chǔ)設(shè)施之間的矛盾。BOO模式是BOT模式的一種衍生,它是在BOT基礎(chǔ)上發(fā)展起來的公共基礎(chǔ)設(shè)施最高程度的私有化的典型代表。BOO項(xiàng)目多為大型基礎(chǔ)設(shè)施建設(shè)項(xiàng)目,建設(shè)工期時(shí)間長,資金投入多,僅靠投資人自有資金的投入難以完成,需要向銀行等金融機(jī)構(gòu)貸款融資,因此項(xiàng)目的投融資資金比例的決策是個(gè)重要的研究問題。但在現(xiàn)有BOO項(xiàng)目的研究中,大多以投資人收益最大化為目標(biāo),考慮借助銀行貸款產(chǎn)生利息費(fèi)用,或者考慮建設(shè)期間的建設(shè)成本等的投融資比例決策。而缺乏對BOO項(xiàng)目運(yùn)營期間,運(yùn)營成本、項(xiàng)目貸款還款方式與金額以及銀行提供貸款也須獲得最大收益的考慮。針對以往對BOO項(xiàng)目投融資比例研究的不足,本文重點(diǎn)考慮了BOO項(xiàng)目運(yùn)營成本,項(xiàng)目貸款的還款方式和金額以及為使項(xiàng)目順利開展,銀行提供貸款所獲得的最大收益問題。論文的主要工作和創(chuàng)新性成果如下。建立考慮運(yùn)營成本以及分期還款的數(shù)學(xué)模型,給出了運(yùn)營期間成本變動和分次對項(xiàng)目貸款還本付息的策略,分析該策略的現(xiàn)實(shí)中的經(jīng)濟(jì)含義。首先考慮BOO項(xiàng)目的運(yùn)營期間內(nèi)存在一個(gè)不可缺少的成本,即運(yùn)營成本。運(yùn)營成本會隨著投資規(guī)模以及運(yùn)營時(shí)間的變化而變化。因此,首先應(yīng)該分析運(yùn)營成本的影響因素,建立運(yùn)營維護(hù)成本函數(shù)模型;其次由于項(xiàng)目建設(shè)資金由私人投資者的自有資金和銀行提供貸款兩部分組成,因此必須考慮對銀行提供貸款的還款方式及金額的問題。在此基礎(chǔ)上,提出了運(yùn)營期間對項(xiàng)目貸款進(jìn)行分次還本付息的方式。研究結(jié)果表明,在一定時(shí)間內(nèi),項(xiàng)目運(yùn)營成本與項(xiàng)目的投資規(guī)模成反比(即前期投資越多,進(jìn)入運(yùn)營期間后的運(yùn)營成本越少);并且,所提出的對貸款分次還本付息的方式更加貼合實(shí)際。最后,本章以某BOO項(xiàng)目為實(shí)例進(jìn)行了分析。建立私人投資者和銀行分別提供資金獲得最大收益的雙目標(biāo)模型,對其進(jìn)行求解。項(xiàng)目資金來源是由私人投資者自有資金和借助銀行的貸款資金共同組成的。因而除私人投資者需要獲得最大收益的同時(shí),銀行也需要對項(xiàng)目提供的貸款進(jìn)行風(fēng)險(xiǎn)評估,最終確保能獲得提供貸款的最大收益。最后,以同一BOO項(xiàng)目的實(shí)際情況為實(shí)例進(jìn)行了分析。
[Abstract]:With the development of our country ' s economy and the deepening of reform and opening - up , the old infrastructure construction idea has been unable to meet the needs of the masses of people .
Secondly , because the project construction funds are made up of private investors ' own funds and the loan of the bank , we must consider the repayment way and the amount of the loan to the bank . On the basis of this , the way of sub - payment for the project loan is put forward . The results show that the project ' s operating cost is inversely proportional to the investment scale of the project during the operation period ( i.e . , the more pre - investment investment , the less the operating cost after entering the operation period ) ;
In the end , this chapter analyzes the ways of paying principal and interest to the loan . Finally , this chapter makes an analysis on a kind of project as an example . The establishment of private investors and banks to provide the dual objective model of maximum income , which is composed of private investor ' s own funds and loan funds by means of bank . The project funds are also required to carry out risk assessment on loan provided by private investors . Finally , the actual situation of the same project is analyzed .
【學(xué)位授予單位】:西安工業(yè)大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:F283
【參考文獻(xiàn)】
相關(guān)博士學(xué)位論文 前2條
1 陳錦旗;中國上市公司融資結(jié)構(gòu)研究[D];上海社會科學(xué)院;2006年
2 劉萍;市政公用基礎(chǔ)設(shè)施建設(shè)項(xiàng)目財(cái)務(wù)控制研究[D];吉林大學(xué);2008年
,本文編號:1932919
本文鏈接:http://sikaile.net/jingjilunwen/hongguanjingjilunwen/1932919.html
最近更新
教材專著