煙臺(tái)龍?zhí)?0000噸冷庫建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究
本文選題:項(xiàng)目風(fēng)險(xiǎn)管理 切入點(diǎn):項(xiàng)目風(fēng)險(xiǎn)評(píng)估 出處:《中國海洋大學(xué)》2015年碩士論文 論文類型:學(xué)位論文
【摘要】:伴隨著經(jīng)濟(jì)發(fā)展,人民生活水平得到很大提高,對(duì)于冷鏈的需求急劇增加。作為冷鏈的重要環(huán)節(jié)—冷庫建設(shè),迎來了飛速發(fā)展的機(jī)遇。冷庫建設(shè)是一個(gè)復(fù)雜的系統(tǒng)工程,其在建設(shè)及使用過程中存在很多風(fēng)險(xiǎn)因素。隨著冷庫快速發(fā)展也存在很多問題,風(fēng)險(xiǎn)事件頻發(fā)。項(xiàng)目風(fēng)險(xiǎn)管理對(duì)于冷藏行業(yè)的健康發(fā)展具有重要的現(xiàn)實(shí)意義,其管理水平的高低關(guān)系到行業(yè)的興衰、企業(yè)的命運(yùn)。本文以煙臺(tái)市龍?zhí)?0000噸冷庫建設(shè)工程作為案例,以現(xiàn)代項(xiàng)目風(fēng)險(xiǎn)管理的理論為基礎(chǔ),結(jié)合冷庫建設(shè)具體實(shí)踐對(duì)工程建設(shè)過程中可能存在的風(fēng)險(xiǎn)進(jìn)行分析,并找到了應(yīng)對(duì)的措施,以此來指導(dǎo)該項(xiàng)目風(fēng)險(xiǎn)管理。為冷庫建設(shè)風(fēng)險(xiǎn)的管理提供了理論依據(jù)與方法論的支持。本文結(jié)合龍?zhí)┙ㄔO(shè)項(xiàng)目風(fēng)險(xiǎn)管理具體實(shí)踐,對(duì)于風(fēng)險(xiǎn)管理各個(gè)階段展開深入的研究:首先,在風(fēng)險(xiǎn)識(shí)別階段:通過專家會(huì)議利用頭腦風(fēng)暴法對(duì)于龍?zhí)╉?xiàng)目五個(gè)階段存在的風(fēng)險(xiǎn)因素進(jìn)行識(shí)別,識(shí)別出23個(gè)風(fēng)險(xiǎn)因素;其次,在風(fēng)險(xiǎn)評(píng)價(jià)階段:對(duì)于識(shí)別出的風(fēng)險(xiǎn)因素應(yīng)用層次分析法逐一進(jìn)行權(quán)重計(jì)算,并對(duì)相關(guān)的判斷矩陣進(jìn)行了一致性檢驗(yàn);在數(shù)據(jù)分析時(shí)應(yīng)用了模糊綜合評(píng)價(jià)法法對(duì)于所得數(shù)據(jù)進(jìn)行了分析計(jì)算,對(duì)于整個(gè)項(xiàng)目的風(fēng)險(xiǎn)進(jìn)行了評(píng)價(jià),得出了龍?zhí)╉?xiàng)目整體風(fēng)險(xiǎn)水平一般的結(jié)論。本文在風(fēng)險(xiǎn)評(píng)估時(shí)對(duì)于項(xiàng)目五個(gè)階段及23個(gè)風(fēng)險(xiǎn)因素進(jìn)行了風(fēng)險(xiǎn)排序,從而確定了兩個(gè)需要重點(diǎn)控制的階段及8個(gè)關(guān)鍵控制點(diǎn):最后,在風(fēng)險(xiǎn)控制階段:在風(fēng)險(xiǎn)評(píng)估的基礎(chǔ)上采用預(yù)防性的風(fēng)險(xiǎn)規(guī)避策略及關(guān)鍵點(diǎn)控制的思路,找出了龍?zhí)╉?xiàng)目風(fēng)險(xiǎn)控制措施。本文通過對(duì)龍?zhí)┙ㄔO(shè)項(xiàng)目風(fēng)險(xiǎn)研究解決了冷庫風(fēng)險(xiǎn)管理中風(fēng)險(xiǎn)識(shí)別的方法問題以及風(fēng)險(xiǎn)評(píng)估的定量分析方法問題。同時(shí)將現(xiàn)代風(fēng)險(xiǎn)管理中預(yù)防性風(fēng)險(xiǎn)規(guī)避策略及關(guān)鍵點(diǎn)控制思路應(yīng)用于冷庫風(fēng)險(xiǎn)管理的實(shí)踐,豐富了實(shí)踐手段,對(duì)于冷庫工程風(fēng)險(xiǎn)管理具有重要的借鑒意義。
[Abstract]:With the development of economy, the standard of living of the people has been greatly improved, and the demand for cold chain has increased sharply. As an important link of cold chain, the construction of cold storage has ushered in the opportunity of rapid development. The construction of cold storage is a complex system engineering. There are many risk factors in the process of construction and use. With the rapid development of cold storage, there are many problems, and risk events occur frequently. Project risk management has important practical significance for the healthy development of refrigeration industry. The management level is related to the rise and fall of the industry and the fate of the enterprise. This paper takes the Longtai 10000 ton cold storage construction project in Yantai as a case study, based on the theory of modern project risk management. Combined with the concrete practice of cold storage construction, the possible risks in the process of construction are analyzed, and the corresponding measures are found. It provides theoretical basis and methodological support for the risk management of cold storage construction. This paper combines the concrete practice of risk management in Longtai construction project. To carry out in-depth research on each stage of risk management: first, in the risk identification phase: through the expert meeting to identify the risk factors in the five stages of Longtai project by using the brainstorming method, and then identify 23 risk factors. In the stage of risk evaluation, the weight of identified risk factors is calculated one by one by AHP, and the consistency of the related judgment matrix is verified. In the data analysis, the fuzzy comprehensive evaluation method is applied to analyze and calculate the data, and the risk of the whole project is evaluated. The conclusion is that the overall risk level of Longtai project is general. In this paper, the five stages and 23 risk factors of the project are ranked in the risk assessment. Thus, two key control stages and eight key control points are determined. Finally, in the risk control stage, the preventive risk aversion strategy and the key point control are adopted on the basis of risk assessment. The risk control measures of Longtai Project are found out. This paper solves the problem of risk identification in cold storage risk management and the quantitative analysis method of risk assessment by studying the risk of Longtai Construction Project. The preventive risk avoidance strategy and key point control in risk management are applied to the practice of risk management in cold storage. Enriched the practical means, for cold storage engineering risk management has an important reference significance.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:F252;TU71
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉云華;項(xiàng)目風(fēng)險(xiǎn)管理[J];內(nèi)蒙古科技與經(jīng)濟(jì);2004年S1期
2 申建紅;加強(qiáng)施工項(xiàng)目風(fēng)險(xiǎn)管理[J];建筑;2001年03期
3 宋晉杰;;對(duì)房地產(chǎn)項(xiàng)目風(fēng)險(xiǎn)管理的一些認(rèn)識(shí)[J];天津建設(shè)科技;2007年S1期
4 劉漢榮;秦紅燕;丁向麗;;國防科研試驗(yàn)項(xiàng)目風(fēng)險(xiǎn)管理[J];裝備指揮技術(shù)學(xué)院學(xué)報(bào);2008年04期
5 顧軍政;;建筑企業(yè)項(xiàng)目風(fēng)險(xiǎn)管理中存在問題及防治措施[J];交通科技與經(jīng)濟(jì);2009年03期
6 楊曉華;李盛;曾朝文;;淺談水利水電施工企業(yè)的項(xiàng)目風(fēng)險(xiǎn)管理[J];江西水利科技;2013年01期
7 丁遠(yuǎn);;房地產(chǎn)項(xiàng)目風(fēng)險(xiǎn)管理探討[J];科技創(chuàng)新與應(yīng)用;2013年15期
8 張愛珍;;公路項(xiàng)目風(fēng)險(xiǎn)管理的認(rèn)識(shí)與思考[J];科技促進(jìn)發(fā)展;2010年S1期
9 楊正祥;;軟件項(xiàng)目風(fēng)險(xiǎn)管理分析與實(shí)踐[J];中國水運(yùn)(理論版);2007年03期
10 崔金志;;論施工項(xiàng)目風(fēng)險(xiǎn)管理[J];中國民航大學(xué)學(xué)報(bào);2007年S1期
相關(guān)會(huì)議論文 前7條
1 彭英民;劉化民;;項(xiàng)目風(fēng)險(xiǎn)管理的重要性[A];河南省冶金企業(yè)創(chuàng)新與和諧發(fā)展研討會(huì)——暨技術(shù)經(jīng)濟(jì)年會(huì)論文集[C];2008年
2 王虎軍;毛明裕;周建敏;;淺談項(xiàng)目風(fēng)險(xiǎn)管理[A];土木建筑學(xué)術(shù)文庫(第16卷)[C];2012年
3 胡勇;肖靜華;龐家峰;謝康;;軟件項(xiàng)目風(fēng)險(xiǎn)管理的協(xié)同過程模型[A];信息經(jīng)濟(jì)與國民經(jīng)濟(jì)增長方式的轉(zhuǎn)變——中國信息經(jīng)濟(jì)學(xué)會(huì)2006年學(xué)術(shù)年會(huì)論文集[C];2006年
4 初哲;江共養(yǎng);;澳大利亞礦山項(xiàng)目風(fēng)險(xiǎn)管理工作的分析及反思[A];第九屆全國采礦學(xué)術(shù)會(huì)議暨礦山技術(shù)設(shè)備展示會(huì)論文集[C];2012年
5 鄭清濤;楊世明;孫元文;;項(xiàng)目風(fēng)險(xiǎn)管理的幾點(diǎn)體會(huì)及做法[A];山東水利學(xué)會(huì)第八屆優(yōu)秀學(xué)術(shù)論文匯編[C];2003年
6 楊律青;;基于SAP的ERP項(xiàng)目風(fēng)險(xiǎn)管理[A];第10屆計(jì)算機(jī)模擬與信息技術(shù)會(huì)議論文集[C];2005年
7 孫曉蕾;李建平;陳建明;;基于項(xiàng)目生命周期觀的R&D項(xiàng)目風(fēng)險(xiǎn)管理分析[A];第八屆中國管理科學(xué)學(xué)術(shù)年會(huì)論文集[C];2006年
相關(guān)重要報(bào)紙文章 前8條
1 宏偉;中國企業(yè)項(xiàng)目風(fēng)險(xiǎn)管理任務(wù)艱巨[N];中國質(zhì)量報(bào);2011年
2 記者 陳樹青 李仕兵 通訊員 王建勛;實(shí)施項(xiàng)目風(fēng)險(xiǎn)管理[N];中國鐵道建筑報(bào);2006年
3 張慧民;化解項(xiàng)目風(fēng)險(xiǎn)走好“四步棋”[N];中國建設(shè)報(bào);2009年
4 張慧民;設(shè)計(jì)院如何化解轉(zhuǎn)型風(fēng)險(xiǎn)[N];建筑時(shí)報(bào);2010年
5 中南大學(xué)商學(xué)院副院長、博士導(dǎo)師、教授 肖序;評(píng)《高速公路BOT項(xiàng)目風(fēng)險(xiǎn)管理問題研究》[N];湖南日?qǐng)?bào);2011年
6 本報(bào)記者 何志丹 劉立巖 特約記者 盧迪;一封表揚(yáng)信引發(fā)的新聞[N];石油管道報(bào);2009年
7 記者 姜瑜;美亞“中國護(hù)照計(jì)劃”助企業(yè)“走出去”[N];上海金融報(bào);2011年
8 王建國;多措并舉,破解蘭成管道難題[N];石油管道報(bào);2011年
相關(guān)博士學(xué)位論文 前3條
1 蔣國萍;軟件項(xiàng)目風(fēng)險(xiǎn)管理的貝葉斯網(wǎng)絡(luò)模型研究[D];國防科學(xué)技術(shù)大學(xué);2005年
2 潘春光;軟件項(xiàng)目風(fēng)險(xiǎn)計(jì)劃與過程控制模型研究[D];國防科學(xué)技術(shù)大學(xué);2006年
3 葉峗;設(shè)計(jì)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];中國美術(shù)學(xué)院;2015年
相關(guān)碩士學(xué)位論文 前10條
1 李擁;廣西電子口岸海運(yùn)物流服務(wù)信息平臺(tái)建設(shè)的風(fēng)險(xiǎn)管理研究[D];電子科技大學(xué);2016年
2 王青青;福田雷沃重工職工公寓建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];中國海洋大學(xué);2014年
3 周,
本文編號(hào):1581525
本文鏈接:http://sikaile.net/jingjilunwen/hongguanjingjilunwen/1581525.html