W電廠空氣預(yù)熱器改造項(xiàng)目進(jìn)度管理研究
[Abstract]:As an important part of enterprise management, project schedule management has gradually become the key determinant for electric power enterprises to gain competitive advantage. How to carry out the project schedule management is closely related to improving the production efficiency and enhancing the core competitiveness of enterprises. This paper first reviews the development of project schedule management and its related knowledge dissemination and application in China, and analyzes the current situation of project schedule management in China and the technical trends of project schedule management at home and abroad. Then the related concepts of project schedule management are expounded, and some common problems in project schedule management are put forward. The main content of this paper is to introduce the application of project schedule management in the equipment transformation of W power plant, and analyze the advantages and disadvantages existing in the equipment renovation schedule management of W power plant. On the basis of literature research and experience, this paper uses the method of theoretical induction and practical comparison to carry out schedule planning and schedule control management for the air preheater renovation project in W power plant, and carries out an empirical study combined with the practice of equipment transformation. In this paper, the whole project schedule management scheme of air preheater renovation project in W power plant is designed and planned. From project description, project decomposition to schedule matrix, schedule optimization, detailed, scientific and reasonable management of the schedule of the air preheater reconstruction project in W power plant. From the aspects of determining the control target, establishing the control system, drawing up the schedule control measures and drawing up the schedule control countermeasures, the progress control of the retrofit project of the air preheater in W power plant has been carried out. This paper investigates and studies the difficulties and obstacles often encountered in the project, and makes corresponding countermeasures by using the method of project management, and sums up, contrasts, analyses and concludes, from the perspective of schedule management, For the implementation of similar projects to provide a lot of valuable experience. In this paper, the scientific project schedule management method is applied to solve the problems in the actual equipment transformation for specific projects and specific cases. From the start of the project, layout, construction, completion to acceptance, problem finding, solution content is detailed, pertinence is strong, has certain reference to the similar engineering project. This paper puts forward that the application of project schedule management to the retrofit of actual equipment in power plants is of great significance to improving the level of project schedule management and is a beneficial attempt in the practice of project schedule management.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:F273.4;F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張蚌京;;電力建設(shè)項(xiàng)目后評(píng)價(jià)工作的若干思考[J];電力標(biāo)準(zhǔn)化與技術(shù)經(jīng)濟(jì);2008年03期
2 侯建設(shè);吳輝;;南陽西500kV變電站工程施工質(zhì)量管理[J];電力建設(shè);2009年09期
3 陳昌振;單沅;陳偉標(biāo);;戶外型220kV變電站設(shè)計(jì)方案優(yōu)化[J];廣東輸電與變電技術(shù);2006年04期
4 徐寧;;風(fēng)險(xiǎn)管理在電力工程項(xiàng)目管理中的應(yīng)用實(shí)施研究[J];甘肅科技;2009年24期
5 徐清超;;變電站自動(dòng)化應(yīng)用IEC 61850標(biāo)準(zhǔn)的分析[J];電力系統(tǒng)保護(hù)與控制;2009年23期
6 葛黎敏;韓建平;;電力工程項(xiàng)目風(fēng)險(xiǎn)管理的初步研究[J];今日科苑;2009年21期
7 金雪蓮;閆敏;馬源良;;項(xiàng)目后評(píng)價(jià)理論在電力項(xiàng)目中的應(yīng)用[J];青海電力;2009年02期
8 崔曉明;馬力;;軟件項(xiàng)目進(jìn)度控制方法研究[J];計(jì)算機(jī)工程與設(shè)計(jì);2010年12期
9 魏宏鴿;程雪山;馬彥斌;朱躍;;燃煤煙氣中SO_3的產(chǎn)生與轉(zhuǎn)化及其抑制對(duì)策探討[J];發(fā)電與空調(diào);2012年02期
10 趙利;畢向林;鹿吉祥;陳洪軍;;并行建設(shè)工程項(xiàng)目管理模式研究[J];項(xiàng)目管理技術(shù);2011年01期
相關(guān)碩士學(xué)位論文 前4條
1 趙志崗;火電廠設(shè)備檢修項(xiàng)目管理體系優(yōu)化與應(yīng)用研究[D];華北電力大學(xué);2011年
2 胡娜;H公司機(jī)加車間現(xiàn)場改造項(xiàng)目進(jìn)度計(jì)劃與控制研究[D];南京理工大學(xué);2011年
3 劉杰;濰坊市天潤路改造項(xiàng)目進(jìn)度計(jì)劃與控制研究[D];中國海洋大學(xué);2009年
4 劉國棟;中石化山東分公司加油卡工程項(xiàng)目進(jìn)度計(jì)劃管理研究[D];西北大學(xué);2009年
,本文編號(hào):2181488
本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/2181488.html