天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 生產(chǎn)管理論文 >

白石220KV變電站技術(shù)經(jīng)濟(jì)分析及綜合評價

發(fā)布時間:2018-01-15 03:09

  本文關(guān)鍵詞:白石220KV變電站技術(shù)經(jīng)濟(jì)分析及綜合評價 出處:《華北電力大學(xué)》2013年碩士論文 論文類型:學(xué)位論文


  更多相關(guān)文章: 變電站 可行性分析 層次分析法 模糊綜合評價


【摘要】:隨著我國廠網(wǎng)分開模式的初步完成,大量資本逐漸涌入發(fā)電側(cè),上大壓小政策也陸續(xù)出臺,電能供應(yīng)緊張的情況得到了較大緩解。但是,連接發(fā)電側(cè)和售電側(cè)的電網(wǎng)建設(shè)遠(yuǎn)遠(yuǎn)滯后,嚴(yán)重阻礙了電力工業(yè)的發(fā)展。變電站作為電網(wǎng)的重要基礎(chǔ)設(shè)施,其高水平建設(shè)施工可以有效地改善電網(wǎng)供電能力不足的現(xiàn)狀,促進(jìn)經(jīng)濟(jì)發(fā)展。白石變電站建設(shè)工程具有投資大、工期長、施工難度大、技術(shù)復(fù)雜以及工程參與方眾多等特點(diǎn),所在地區(qū)負(fù)荷增長迅速,且主要為煤礦負(fù)荷,供電可靠性要求較高,因此在建設(shè)初期有必要對項(xiàng)目進(jìn)行技術(shù)經(jīng)濟(jì)可行性分析,以提高項(xiàng)目決策的科學(xué)性,避免盲目投資。 本文采用項(xiàng)目管理理論,運(yùn)用定量與定性分析相結(jié)合,理論與實(shí)踐相結(jié)合的方法對白石220KV變電站新建工程的技術(shù)經(jīng)濟(jì)可行性及綜合可行性進(jìn)行分析、評價。首先,對研究背景意義及國內(nèi)外研究現(xiàn)狀進(jìn)行闡述;其次對本文相關(guān)的項(xiàng)目管理及可行性分析理論進(jìn)行綜合論述。在此基礎(chǔ)上,對白石變電站新建工程的必要性進(jìn)行分析,并提出了該變電站新建工程的選址和線路建設(shè)問題的可行方案,分別從該變電站的電氣一次接線、變電二次、系統(tǒng)通信和系統(tǒng)保護(hù)進(jìn)行技術(shù)分析,同時對財(cái)務(wù)凈現(xiàn)值、財(cái)務(wù)內(nèi)部收益率和投資回收期等方面進(jìn)行了經(jīng)濟(jì)分析;最后,采用層次分析法和模糊綜合評價方法的組合模型對白石變電站的綜合可行性進(jìn)行了評價。 模糊綜合評判結(jié)果表明,該項(xiàng)目的具有很好的可行性。該結(jié)果將給白石220KV變電站新建工程的投資決策及施工建設(shè)提供科學(xué)的參考依據(jù),能夠有效的避免項(xiàng)目的盲目投資,提高項(xiàng)目的投資收益。同時也對國內(nèi)其他同類變電站建設(shè)項(xiàng)目的順利開展具有積極的指導(dǎo)和借鑒作用。
[Abstract]:With the initial completion of the separation mode of power plant and power grid in our country, a large amount of capital has gradually poured into the power generation side, and the policy of high pressure and small pressure has been introduced one after another, and the situation of the shortage of power supply has been greatly alleviated. The construction of power grid connecting the generation side and the selling side is lagging far behind, which seriously hinders the development of the power industry. Substation is an important infrastructure of the power network. Its high level construction can effectively improve the current situation of insufficient power supply capacity of power grid and promote economic development. Baishi substation construction project has a large investment, long construction period and difficult construction. Because of the complexity of technology and the large number of project participants, the load in the region is growing rapidly, and the main load is coal mine load, and the reliability of power supply is very high. Therefore, it is necessary to analyze the technical and economic feasibility of the project in the early stage of construction so as to improve the scientific nature of the project decision and avoid blind investment. In this paper, project management theory, quantitative and qualitative analysis, theory and practice are used to analyze the technical and economic feasibility and comprehensive feasibility of the newly built project of Baishi 220KV substation. First of all, the significance of the research background and the status quo of the research at home and abroad are expounded. Secondly, the related project management and feasibility analysis theory are comprehensively discussed. On this basis, the necessity of the new project of Baishi substation is analyzed. And put forward the feasible scheme of location and line construction of the new project of the substation, respectively from the substation electrical primary wiring, substation secondary, system communication and system protection technical analysis. At the same time, the financial net present value, financial internal rate of return and investment recovery period are analyzed. Finally, the comprehensive feasibility of Baishi substation is evaluated by the combination model of analytic hierarchy process and fuzzy comprehensive evaluation method. The result of fuzzy comprehensive evaluation shows that the project has good feasibility, and the result will provide a scientific reference for the investment decision and construction construction of the new project of Baishi 220KV substation. It can effectively avoid the blind investment of the project and improve the investment income of the project. It also has a positive guidance and reference role for the smooth development of other similar substation construction projects in China.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F424.7;TM63

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 劉琴;;旅游項(xiàng)目規(guī)劃的理論與方法研究進(jìn)展[J];安徽農(nóng)業(yè)科學(xué);2011年08期

2 陳希祥;邱靜;劉冠軍;;基于層次分析法與模糊綜合評判的測試設(shè)備選擇方法研究[J];兵工學(xué)報(bào);2010年01期

3 張威;;可行性研究在項(xiàng)目建設(shè)中的作用[J];電大理工;2009年01期

4 謝立群;;110kV佛山石洲變電站擴(kuò)建工程可行性研究[J];電工技術(shù);2007年12期

5 黃浩;;電力工程建設(shè)可行性研究的作用[J];電網(wǎng)技術(shù);2007年S1期

6 聶宏展;呂盼;喬怡;姚秀萍;;基于熵權(quán)法的輸電網(wǎng)規(guī)劃方案模糊綜合評價[J];電網(wǎng)技術(shù);2009年11期

7 洪晉;;談建設(shè)項(xiàng)目可行性研究質(zhì)量對投資估算的約束[J];工程建設(shè)與設(shè)計(jì);2010年12期

8 徐志勇;張徐東;曾鳴;鄢帆;;基于ANP的多層次模糊綜合評價法的電網(wǎng)建設(shè)項(xiàng)目后評價研究[J];華東電力;2009年03期

9 孫紅;;投資項(xiàng)目可行性研究理論綜述[J];華北電力大學(xué)學(xué)報(bào)(社會科學(xué)版);2008年06期

10 孟秀琴;;淺談我國項(xiàng)目投資的可行性研究[J];經(jīng)濟(jì)師;2008年06期

相關(guān)博士學(xué)位論文 前1條

1 朱振濤;工程文化的系統(tǒng)復(fù)雜性及其演化機(jī)理研究[D];南京大學(xué);2012年



本文編號:1426503

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/shengchanguanlilunwen/1426503.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶a95bb***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com
午夜视频成人在线免费| 久久碰国产一区二区三区| 东京热男人的天堂久久综合| 中文字幕乱码亚洲三区| 偷自拍亚洲欧美一区二页| 国产色第一区不卡高清| 日韩国产亚洲欧美激情| 神马午夜福利一区二区| 一区二区三区国产日韩| 国产精品一区二区香蕉视频 | 真实偷拍一区二区免费视频| 欧美日韩一级aa大片| 欧美日韩综合在线第一页| 又大又紧又硬又湿又爽又猛| 夫妻性生活动态图视频| 亚洲欧美日产综合在线网| 欧美精品亚洲精品日韩专区| 日韩欧美三级视频在线| 欧美尤物在线观看西比尔| 亚洲av熟女一区二区三区蜜桃 | 国产午夜精品美女露脸视频| 老司机精品国产在线视频| 久一视频这里只有精品| 亚洲中文字幕在线观看四区| 国产亚洲欧美日韩国亚语| 国产高清精品福利私拍| 久七久精品视频黄色的| 99久热只有精品视频最新| 男女午夜福利院在线观看| 亚洲欧美日本国产不卡| 中文字幕久久精品亚洲乱码| 欧美国产日韩在线综合| 精品熟女少妇一区二区三区| 日韩无套内射免费精品| 老司机精品国产在线视频| 久久精品久久久精品久久| 中国美女偷拍福利视频| 好吊色欧美一区二区三区顽频| 中文字幕精品人妻一区| 国产高清精品福利私拍| 偷拍洗澡一区二区三区|