A公司項目化管理的解決方案與信息化平臺實現(xiàn)研究
[Abstract]:Company A is a strong technical force, strong new product development capacity, with the development of highly complex electronic products and batch production capacity of a comprehensive scientific research unit. A company's scientific research project is a collection of high-tech, multi-unit team, multi-region, Multi-subcontractor / supplier cooperation in a large project group. With the continuous expansion of business and the increase of projects, the traditional functional management model has no longer adapted to the new development requirements, project-based management ideas emerged as the times require. Under this demand, this paper explores the application of project-based management model in A Company, and studies its key problems. In view of the existing management system of Company A, according to the modern management concept and standard of PMI, combined with the actual situation of Company A, this paper contrasts the management direction concerned in the process of project management. This paper introduces in detail the scope management, schedule management, resource allocation and cost management, plan change and control management, risk analysis and management in the project management process under the multi-project environment of the enterprise. Through the focused analysis, this paper analyzes the problems existing in the existing system, and puts forward the corresponding solutions to the specific problems. The important means of project management is to establish a project management information system (PMIS),) which adapts to the characteristics of A Company. This paper discusses the information demand and construction scheme of scientific research project management system.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:F270.7
【參考文獻】
相關(guān)期刊論文 前10條
1 王立文;項目費用控制的一個有效手段[J];北京航空航天大學(xué)學(xué)報;1998年03期
2 趙輝;王雪青;;集成化的工程項目管理信息系統(tǒng)構(gòu)建[J];北京理工大學(xué)學(xué)報(社會科學(xué)版);2008年06期
3 丁寶成;沈玉志;;通用項目評估決策支持系統(tǒng)模型[J];遼寧工程技術(shù)大學(xué)學(xué)報;2006年S1期
4 羌維立 ,盧超 ,趙普鎰;項目管理組織結(jié)構(gòu)的類型及比較[J];航天工業(yè)管理;2003年04期
5 詹偉;王兆紅;邱菀華;;基于Multi-Agent的分布式項目管理決策支持系統(tǒng)研究[J];計算機應(yīng)用研究;2007年02期
6 楊廷雙,崔寶靈;黑龍江省自然科學(xué)基金項目管理決策支持系統(tǒng)結(jié)構(gòu)研究[J];科技與管理;1999年02期
7 劉士新,王夢光,唐加福;資源受限工程調(diào)度問題的優(yōu)化方法綜述[J];控制與決策;2001年S1期
8 沈暉,陳禹六;面向企業(yè)集成的群體決策支持系統(tǒng)設(shè)計與實現(xiàn)[J];控制與決策;2004年03期
9 戚安邦;多要素項目集成管理方法研究[J];南開管理評論;2002年06期
10 高向軍,賈文濤,陳原,張中帆;土地整理項目管理與決策支持系統(tǒng)的構(gòu)建[J];農(nóng)業(yè)工程學(xué)報;2002年03期
,本文編號:2433377
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2433377.html