出口塔鐵集裝箱平車開發(fā)項(xiàng)目全過程成本管理研究
[Abstract]:The research content of this paper is under the background of the signing of export container flat car project between Shenyang Locomotive and Rolling Stock Co., Ltd. (Shenyang Locomotive & Rolling Stock Co., Ltd.) and Tasmania Railway and Freight car Company (TARV) of Australia. The whole process cost management of tower iron container flat car project is studied. Based on the current cost management situation and the significance of tower iron container flat car as the export product of Shenyang Railway Company, the whole process cost management system of tower iron container flat car project is constructed in this paper. The purpose of this paper is to perfect the cost management system of new products and export products, to improve the cost management level of enterprises, and to strengthen the strength and market competition ability of Shenyang Automobile Company. Based on the existing cost management methods of new products of Shenyang Automobile Company, this paper establishes the basic cost management system of tower iron flat car in three aspects, including the establishment of cost management team. Establishing scientific cost management process and establishing cost management system; The cost management analysis and diagnosis system of tower rail flat car is based on the budget cost of NX70 common flat car and the design cost of tower iron container flat car. Constructing the cost management system of tower iron container flat car; The cost management and control system of tower iron flat car refers to three aspects: cost management and control in product design stage, batch actual production stage and after-sales service stage. The above three cost management systems constitute the whole process cost management system of the tower iron container flat car project. Through the analysis of the current cost management of the project, it is found out that the deficiencies of the new product design and the cost management in the production stage are found, and the measures and methods to solve the problems are put forward in the process of establishing the whole process cost management system of the tower iron flat car project. Finally, the technical and management suggestions are put forward to improve the effectiveness of the cost management system in the whole process of the tower rail flat car project.
【學(xué)位授予單位】:哈爾濱工程大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F426.472;F406.72;F752.62
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王穎馳;侯瑋;;我國企業(yè)成本管理的弊端及成因[J];中國外資;2013年06期
2 韓曉磊;;現(xiàn)代企業(yè)成本管理研究[J];華章;2013年04期
3 張麗華;徐光遠(yuǎn);;論現(xiàn)代企業(yè)成本管理[J];中國外資;2013年01期
4 秦利芳;;我國企業(yè)成本管理的發(fā)展方向[J];現(xiàn)代經(jīng)濟(jì)信息;2012年24期
5 張穎;;淺談國有企業(yè)成本管理的問題及對策[J];財經(jīng)界(學(xué)術(shù)版);2012年04期
6 張悅;張艷芳;;淺析我國企業(yè)成本管理現(xiàn)狀、問題及對策[J];統(tǒng)計與管理;2011年04期
7 鄭俊萍;;企業(yè)成本管理現(xiàn)狀分析[J];科教文匯(上旬刊);2011年06期
8 王麗敏;;我國企業(yè)成本管理現(xiàn)狀及發(fā)展趨勢探討[J];科技信息;2011年13期
9 郭鴻;;淺議我國企業(yè)成本管理[J];中國商界(下半月);2010年11期
10 葉苗苗;;作業(yè)成本法在我國企業(yè)的應(yīng)用研究[J];科技管理研究;2006年10期
相關(guān)博士學(xué)位論文 前1條
1 吳炎太;項(xiàng)目制造成本管理研究(基于項(xiàng)目制造的成本管理研究)[D];南京理工大學(xué);2003年
相關(guān)碩士學(xué)位論文 前7條
1 張向林;A公司產(chǎn)品成本控制研究[D];陜西師范大學(xué);2013年
2 黃薇;關(guān)于D生產(chǎn)制造企業(yè)成本管理的研究[D];大連理工大學(xué);2013年
3 耿祥;關(guān)于YN公司成本管理的研究[D];云南大學(xué);2013年
4 張嘉航;中國國有企業(yè)成本管理問題研究[D];吉林大學(xué);2013年
5 趙凱龍;國際電站EPC項(xiàng)目成本管理研究[D];華北電力大學(xué);2012年
6 車燕萍;我國企業(yè)成本管理的研究[D];上海交通大學(xué);2011年
7 彭莉;產(chǎn)品設(shè)計階段的成本管理研究[D];武漢大學(xué);2005年
,本文編號:2413805
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2413805.html