冶金高爐工程進(jìn)度控制研究
[Abstract]:The construction project of large metallurgical blast furnace is a large system engineering with many stakeholders, complex technology, bad environment, large investment, large scale and long construction cycle. Good management can effectively organize and combine all kinds of resources in the process of project construction, so as to ensure the engineering quality, safety, schedule and cost of the project can be effectively controlled. In recent years, the construction technology and the industrial smelting technology have experienced rapid development, but for many construction units, the project management still adopts the traditional method, the management thought is backward, and the understanding of the related problems in the construction progress process is insufficient. This will affect the progress of the project. Construction schedule management is often ignored by everyone in construction. When the construction period is urgent, because the construction pressure is great, it is not normal and orderly construction, but blindly rush the construction period, it will inevitably lead to the quality of the project. Therefore, the construction schedule control is not only related to whether the construction schedule can be achieved, but also to the quality and cost of the project. Based on the review of engineering management theory and the present situation of large metallurgical blast furnace engineering, this paper analyzes the characteristics of large metallurgical blast furnace engineering. Combined with the practice of the main construction project of 2560m3 blast furnace in a steel plant, the principle of project schedule control is discussed by taking the main construction project of 2560m3 blast furnace as an example and adopting the theory of project schedule control. Analysis of the relationship between project schedule control and pre-planning, quality, technology, dynamic adjustment in the implementation process, prior control of progress in the process of project implementation, in-process control, Post-control and the use of earned value method for progress and cost management.
【學(xué)位授予單位】:燕山大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TF576;TU722
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙錦鍇,崔存濱;網(wǎng)絡(luò)計(jì)劃技術(shù)的應(yīng)用現(xiàn)狀與推廣對策[J];四川建筑科學(xué)研究;2002年01期
2 王英磊,徐哲;大型工程項(xiàng)目進(jìn)度-費(fèi)用聯(lián)合風(fēng)險(xiǎn)分析[J];北京航空航天大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2000年04期
3 王延樹,成虎;大型施工項(xiàng)目的集成管理[J];東南大學(xué)學(xué)報(bào)(自然科學(xué)版);2000年04期
4 鐘冬梅,余曉鐘;對工程項(xiàng)目管理贏得值分析法的改進(jìn)[J];化工技術(shù)經(jīng)濟(jì);2005年03期
5 吳春誠;齊紅衛(wèi);岳超源;王干一;;大型工程項(xiàng)目進(jìn)度評價(jià)研究[J];華中科技大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年05期
6 馬健;;工程項(xiàng)目成本、進(jìn)度綜合控制方法及應(yīng)用[J];經(jīng)濟(jì)師;2006年10期
7 徐洪剛;胡鵬飛;;工程項(xiàng)目成本、進(jìn)度、質(zhì)量集成控制的研究[J];科技管理研究;2006年03期
8 田永清;李海濤;梁向東;;淺談建筑工程進(jìn)度控制的原理和措施[J];遼寧建材;2008年02期
9 岳振國;淺談項(xiàng)目管理中質(zhì)量、進(jìn)度、成本的協(xié)調(diào)[J];內(nèi)蒙古科技與經(jīng)濟(jì);2004年22期
10 胡長明,於東,梁森,陳冬虎;大型冶金建設(shè)項(xiàng)目進(jìn)度控制及其應(yīng)用[J];施工技術(shù);2005年02期
本文編號:2403088
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2403088.html