朔州至準(zhǔn)格爾鐵路綜合電氣化工程項(xiàng)目管理應(yīng)用研究
[Abstract]:Modern engineering project is a complex and open dynamic system with large scale, many participants, high technical requirements, many interference factors, and the difficulty of planning implementation is the main problem we consider. There are three main items in project management of integrated electrification engineering, which are short construction period, good quality and less investment. This paper takes the project process of Shuozhou-Zhunger Railway Integrated electrification Project as the main line, combines the corresponding project management methods, such as constraint theory, total quality management theory, key line, Gantt chart, etc., and plans its schedule in turn. And the quality, safety, cost and other aspects, specific analysis, put forward countermeasures. Set up the guarantee system of organization structure, quality, safety and so on, use single code name network path and Gantt chart to find out the key path, and provide reference and basis for similar engineering project. This paper is divided into five parts. The first chapter is the introduction, which mainly describes the research background, research significance, the source of the paper, the innovation of the subject, the main contents and objectives of the research. At the same time, it expounds the research situation and main theories, mainly describes the project schedule management, the related research evolution process of quality management, and the methodology involved in the article, such as constraint theory, total quality management theory, Gantt chart, etc. Key lines and other specific application methods. The second chapter is the general situation of Shuozhou-Zhunger Railway Integrated electrification Project. It analyzes the general situation of the project, the main engineering quantity and the characteristics of the project. At the same time, it expounds the structure of the project organization frame, which lays the foundation for the project management. Chapter 3, 4 and 5 is the key point of the project management of Shuozhou to Zhunger Railway Integrated electrification Project. It is expounded in detail from three aspects of schedule management, quality management and cost management, analyzes the progress plan, finds out the reasonable key route, and makes the Gantt chart. The quality and safety are analyzed, the effective system of quality assurance is set up, the project management is carried out, and the guarantee measures in practice are given.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:U227
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 楊建華,謝珍,習(xí)應(yīng)祥;PERT網(wǎng)絡(luò)時(shí)間-費(fèi)用優(yōu)化數(shù)學(xué)模型及程序?qū)崿F(xiàn)[J];長(zhǎng)沙交通學(xué)院學(xué)報(bào);1999年01期
2 喬非,沈榮芳,吳啟迪;系統(tǒng)理論、系統(tǒng)方法、系統(tǒng)工程——發(fā)展與展望[J];系統(tǒng)工程;1996年05期
3 張儒忠;淺談工程建設(shè)項(xiàng)目的投資、工期、質(zhì)量及其關(guān)系[J];廣東水利水電;2002年05期
4 張曉偉;施工工期、工程質(zhì)量和投資成本之間的關(guān)系[J];安陽師專學(xué)報(bào);1999年02期
5 許勁;任玉瓏;;總承包體制下項(xiàng)目質(zhì)量管理研究[J];科技管理研究;2007年04期
6 劉士新,王夢(mèng)光,唐加福;資源受限工程調(diào)度問題的優(yōu)化方法綜述[J];控制與決策;2001年S1期
7 李麗;;我國工程項(xiàng)目進(jìn)度管理研究綜述[J];科學(xué)之友;2011年02期
8 宋建磊;;電力施工工程中的項(xiàng)目管理[J];建材技術(shù)與應(yīng)用;2009年09期
9 王健;單代號(hào)時(shí)標(biāo)網(wǎng)絡(luò)計(jì)劃在工期—費(fèi)用優(yōu)化中的應(yīng)用[J];油氣田地面工程;2000年04期
10 蔡晨,萬偉;基于PERT/CPM的關(guān)鍵鏈管理[J];中國管理科學(xué);2003年06期
相關(guān)碩士學(xué)位論文 前7條
1 劉鴻洋;項(xiàng)目管理方法在XY公司STT電力工程項(xiàng)目中的應(yīng)用研究[D];華中科技大學(xué);2010年
2 邱進(jìn)冬;企業(yè)項(xiàng)目管理中的MC方法與技術(shù)研究[D];浙江大學(xué);2003年
3 仲家驊;項(xiàng)目管理理論方法及應(yīng)用[D];天津大學(xué);2006年
4 劉波;中國移動(dòng)江蘇公司綜合結(jié)算系統(tǒng)建設(shè)項(xiàng)目質(zhì)量管理研究[D];南京理工大學(xué);2007年
5 楊韶雄;廣州植之元南沙油脂加工項(xiàng)目管理實(shí)施研究[D];西南交通大學(xué);2009年
6 包飛;關(guān)鍵鏈方法在太湖船閘項(xiàng)目進(jìn)度計(jì)劃中的應(yīng)用研究[D];蘇州大學(xué);2010年
7 茍旭;基于設(shè)計(jì)結(jié)構(gòu)矩陣的高速公路工程項(xiàng)目進(jìn)度計(jì)劃研究[D];華中科技大學(xué);2009年
,本文編號(hào):2370138
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2370138.html