風(fēng)電項(xiàng)目的經(jīng)營策劃實(shí)踐
發(fā)布時(shí)間:2018-09-10 08:40
【摘要】:風(fēng)電項(xiàng)目具有工期短、涉及專業(yè)多、不可預(yù)見因素多等顯著特點(diǎn)。通過施工準(zhǔn)備階段的經(jīng)營策劃發(fā)揮主動(dòng)控制的優(yōu)勢(shì),確保目標(biāo)成本的實(shí)現(xiàn)。從風(fēng)電項(xiàng)目經(jīng)營管理實(shí)際需要出發(fā),總結(jié)借鑒有關(guān)行業(yè)經(jīng)營管理成功經(jīng)驗(yàn),深入探討經(jīng)營策劃的細(xì)節(jié),旨在提高經(jīng)營策劃書編制的實(shí)用性、針對(duì)性和可操作性,真正實(shí)現(xiàn)經(jīng)營策劃對(duì)施工成本管理的指導(dǎo)性作用。
[Abstract]:Wind power project has the characteristics of short construction period, professional involvement, unpredictable factors and so on. Take advantage of active control through management planning in construction preparation stage to ensure the realization of target cost. Based on the practical needs of wind power project management, this paper summarizes and draws lessons from the successful experience of management and management of relevant industries, and probes into the details of business planning in order to improve the practicability, pertinence and maneuverability of the compilation of business planning books. Truly realize the guiding effect of management planning on construction cost management.
【作者單位】: 中國十七冶集團(tuán)有限公司;
【分類號(hào)】:F284;F426.61
本文編號(hào):2233943
[Abstract]:Wind power project has the characteristics of short construction period, professional involvement, unpredictable factors and so on. Take advantage of active control through management planning in construction preparation stage to ensure the realization of target cost. Based on the practical needs of wind power project management, this paper summarizes and draws lessons from the successful experience of management and management of relevant industries, and probes into the details of business planning in order to improve the practicability, pertinence and maneuverability of the compilation of business planning books. Truly realize the guiding effect of management planning on construction cost management.
【作者單位】: 中國十七冶集團(tuán)有限公司;
【分類號(hào)】:F284;F426.61
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 袁_";;提升成本競(jìng)爭優(yōu)勢(shì)的五項(xiàng)措施[J];中國電力企業(yè)管理;2007年07期
2 楊德生;;對(duì)水利水電工程施工成本管理一文的疑議[J];黑龍江水利科技;2011年02期
3 張彥欣;;淺談電力工程建設(shè)中的項(xiàng)目管理[J];企業(yè)技術(shù)開發(fā);2010年23期
4 王常勇;;送電線路工程質(zhì)量通病及控制研究[J];黑龍江科技信息;2011年15期
5 ;[J];;年期
6 ;[J];;年期
7 ;[J];;年期
8 ;[J];;年期
9 ;[J];;年期
10 ;[J];;年期
相關(guān)碩士學(xué)位論文 前2條
1 梁樹忠;江蘇沙洲電廠建設(shè)項(xiàng)目成本控制研究[D];華北電力大學(xué)(河北);2009年
2 邱楓;隆鼎送變電公司工程項(xiàng)目成本管理研究[D];華北電力大學(xué)(北京);2010年
,本文編號(hào):2233943
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2233943.html
最近更新
教材專著