延長油田崖里坪住房小區(qū)工程項目成本管理研究
[Abstract]:With the increasingly fierce competition in the oil industry at home and abroad, the established state-owned oil enterprises must closely follow the development of the market, actively introduce scientific management theory, comprehensively reduce construction costs and improve profitability. To provide assurance for the sustainable development of petroleum enterprises. However, the cost management of Yanchang Oilfield Co., Ltd. is still in the management stage of accounting afterwards, and its academic exploration on cost management is not deep enough, and the innovation is not obvious enough. Does not combine the domestic and foreign advanced cost management achievement to formulate conforms to own management system. Therefore, how to ensure the extension of the healthy and sustainable development of oil enterprises, improve the cost management system of various infrastructure projects, has become a top priority. As a key project of Yanchang Oil Field Co., Ltd, Yanchang Yaliping housing district project has the characteristics of large construction scale, high staff attention and high investment. In this paper, taking Yanchang Oilfield Yaliping Housing area Project as a case study, firstly, the problems and current situation of Yanchang Oilfield logistics support construction cost management are deeply studied. According to the cost optimization of Yaliping housing district project in the design stage, the necessity and effectiveness of cost management in the process of extending the logistics support construction of oil field are illustrated. Then using the theory knowledge of the whole cycle cost management, the omnidirectional cost management and the whole process cost management, the paper puts forward the cost management system of extending the oil field logistics support construction. This system can concretize, quantify, information and timely the cost management of each stage of the construction of Yaliping housing district project, which is conducive to the implementation of cost management in every detail of the project. Then established the dynamic assessment and the final examination system, can encourage each worker to give play to their own ability and value, finally ensured the realization of the project target cost, finally established the information management and the people-oriented management safeguard measure, To ensure the extension of oil field logistics construction of the cost management system can be effectively implemented.
【學(xué)位授予單位】:西安石油大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU723.3
【相似文獻】
相關(guān)期刊論文 前1條
1 張礦玲;;延長油田六種車型配置方案[J];中國設(shè)備工程;2013年06期
相關(guān)重要報紙文章 前10條
1 林威;延長油田醞釀海外上市[N];中國礦業(yè)報;2006年
2 陳天舉 記者 王維彬;延長油田公司著力構(gòu)建平安和諧油田[N];延安日報;2007年
3 陳天舉邋王維彬;延長油田公司努力建設(shè)生態(tài)油田[N];延安日報;2008年
4 侯小龍;延長油田用“八個見成效”衡量學(xué)習(xí)實踐活動[N];延安日報;2009年
5 記者 宋偉;創(chuàng)新機制 搞好服務(wù) 全力支持延長油田公司健康發(fā)展[N];延安日報;2013年
6 記者 程浩楠 實習(xí)生 王艷;延長油田逆勢而上實現(xiàn)“硬過半”[N];延安日報;2014年
7 劉書云;延長油田股份公司成功組建[N];中國石化報;2006年
8 本報記者 林威;延長油田醞釀海外上市[N];中國證券報;2006年
9 通訊員 胡同 記者 陳青;延長油田公司發(fā)展勢頭強勁[N];中國石油報;2006年
10 通訊員 胡同 記者 何曉龍;延長油田成功實現(xiàn)重組[N];中國石油報;2006年
相關(guān)碩士學(xué)位論文 前10條
1 趙晏鐸;延長油田甘谷驛采油廠高血壓患病情況分析及其與代謝綜合征各組分關(guān)系的研究[D];延安大學(xué);2015年
2 董翔;延長油田原油性質(zhì)分析研究[D];西安石油大學(xué);2016年
3 薛怡;延長油田崖里坪生產(chǎn)基地供熱站改造項目技術(shù)經(jīng)濟研究[D];西安石油大學(xué);2015年
4 鄧楊軍;延長油田崖里坪住房小區(qū)工程項目成本管理研究[D];西安石油大學(xué);2015年
5 李春慶;延長油田柳溝聯(lián)合站項目效益評價研究[D];西安石油大學(xué);2015年
6 李文;延長油田學(xué)習(xí)型培訓(xùn)模式構(gòu)建研究[D];延安大學(xué);2012年
7 許延軍;延長油田地面工程項目管理提升研究[D];西北大學(xué);2012年
8 郝世彥;延長油田股份有限公司技術(shù)人才開發(fā)戰(zhàn)略研究[D];西北大學(xué);2012年
9 馬如平;延長油田物資戰(zhàn)略懫購體系的研究[D];西北大學(xué);2013年
10 楊根;延長油田豐源實業(yè)總公司油田化工產(chǎn)業(yè)經(jīng)營發(fā)展戰(zhàn)略研究[D];西北大學(xué);2013年
,本文編號:2166412
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/2166412.html