基于BIM5D施工階段成本管理應(yīng)用研究
本文選題:BIM5D + 成本管理 ; 參考:《北京建筑大學(xué)》2017年碩士論文
【摘要】:我國(guó)施工行業(yè)長(zhǎng)期存在高成本、高能耗以及管理方式粗放等現(xiàn)象,而作為施工行業(yè)項(xiàng)目實(shí)施的主體,施工總承包單位成本管理水平低下是造成該現(xiàn)象的主要原因之一。BIM技術(shù)的應(yīng)用被認(rèn)為是解決該問題的途徑。BIM5D作為BIM技術(shù)在施工階段成本管理的具體深化應(yīng)用,已經(jīng)在項(xiàng)目中得到了初步實(shí)踐,然而相應(yīng)的其管理組織以及工作流程的不明確為其后續(xù)的深度應(yīng)用造成了困難。本文通過分析總承包單位基于BIM5D施工階段成本管理應(yīng)用中面臨的問題,結(jié)合成本管理理論以及BIM5D的理論,提出了基于BIM5D施工階段成本管理組織結(jié)構(gòu),并針對(duì)成本管理的五項(xiàng)核心工作實(shí)施流程以及實(shí)施方法進(jìn)行了研究,最后通過案例分析得出其在實(shí)際項(xiàng)目中結(jié)果,給后續(xù)的研究以及應(yīng)用提供了參考價(jià)值。本文首先對(duì)我國(guó)相關(guān)推廣政策以及施工總承包單位應(yīng)用狀況進(jìn)行總結(jié),得出施工階段總承包單位在應(yīng)用BIM5D進(jìn)行成本管理時(shí)所面臨相應(yīng)的管理組織框架與流程缺乏、專業(yè)人才缺乏以及相關(guān)軟件功能缺乏的問題。依據(jù)此現(xiàn)狀將基于BIM5D施工階段成本管理應(yīng)用作為主要研究?jī)?nèi)容。其次對(duì)基于BIM5D施工階段成本管理工作按照不同維度進(jìn)行分解,據(jù)此結(jié)果對(duì)施工總承包單位成本管理層級(jí)、職責(zé)進(jìn)行劃分,并遵循其組織結(jié)構(gòu)設(shè)計(jì)理論,提出基于BIM5D施工階段成本管理組織結(jié)構(gòu)。根據(jù)BIM5D施工階段成本管理的目標(biāo),給出其實(shí)施平臺(tái)架構(gòu)以及軟件配置建議,完成施工階段成本管理五項(xiàng)核心工作實(shí)施流程的梳理,并提出相應(yīng)的實(shí)施方法。最后,以杭州停車庫(kù)項(xiàng)目為例,對(duì)基于BIM5D施工階段成本管理進(jìn)行案例研究,通過展示其管理組織框架,工作實(shí)施標(biāo)準(zhǔn)以及工作成果,驗(yàn)證基于BIM5D成本管理的可行性,并分析出其實(shí)施效果,給后續(xù)項(xiàng)目的成本管理工作提供了借鑒意義。
[Abstract]:China's construction industry has a long history of high cost, high energy consumption and extensive management, but as the main implementation of construction industry projects, The low level of unit cost management is one of the main reasons for this phenomenon. The application of BIM technology is considered as the way to solve this problem. BIM5D is the concrete application of BIM technology in construction stage cost management. It has been put into practice in the project, but the uncertainty of its management organization and workflow makes it difficult to apply in depth. By analyzing the problems in the application of cost management in construction stage based on BIM5D, combining the theory of cost management and the theory of BIM5D, this paper puts forward the organization structure of cost management in construction phase based on BIM5D. The implementation process and implementation method of the five core tasks of cost management are studied. Finally, the results in the actual project are obtained through the case analysis, which provides a reference value for the subsequent research and application. In this paper, we first summarize the relevant promotion policies and the application situation of the construction general contracting unit, and draw the conclusion that the general contracting unit faces the lack of the corresponding management organization framework and process when applying BIM5D to the cost management in the construction stage. Lack of professionals and lack of related software functions. According to this situation, the application of cost management in construction phase based on BIM5D is considered as the main research content. Secondly, the cost management work in construction stage based on BIM5D is decomposed according to different dimensions. According to the results, the level and responsibility of cost management of construction general contracting unit are divided, and the organizational structure design theory is followed. The cost management organization structure of construction phase based on BIM5D is put forward. According to the goal of cost management in construction stage of BIM5D, the framework of implementation platform and the suggestion of software configuration are given, and the implementation flow of five core work of cost management in construction phase is finished, and the corresponding implementation method is put forward. Finally, taking Hangzhou parking garage project as an example, a case study on cost management in construction phase based on BIM5D is carried out. The feasibility of cost management based on BIM5D is verified by demonstrating its management organizational framework, work implementation standards and work results. And analyzes its implementation effect, provides the reference significance for the follow-up project cost management work.
【學(xué)位授予單位】:北京建筑大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:F426.92;F406.72
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 吳松林;;以“兩中心一核算”為核心的工程全過程管控[J];施工企業(yè)管理;2016年09期
2 郝瑩;;建筑行業(yè)互聯(lián)網(wǎng)應(yīng)用呈現(xiàn)五大新特點(diǎn)《中國(guó)建筑施工行業(yè)信息化發(fā)展報(bào)告(2016)互聯(lián)網(wǎng)應(yīng)用與發(fā)展》發(fā)布[J];中國(guó)勘察設(shè)計(jì);2016年07期
3 王婷;任瓊瓊;肖莉萍;;基于BIM5D的施工資源動(dòng)態(tài)管理研究[J];土木建筑工程信息技術(shù);2016年03期
4 韓華;;通過BIM設(shè)計(jì)實(shí)現(xiàn)建筑的可持續(xù)發(fā)展[J];建筑設(shè)計(jì)管理;2015年12期
5 張俊;劉洋;李偉勤;;基于云技術(shù)的BIM應(yīng)用現(xiàn)狀與發(fā)展趨勢(shì)[J];建筑經(jīng)濟(jì);2015年07期
6 李存斌;魯平;;BIM技術(shù)在建筑施工企業(yè)的應(yīng)用研究[J];中國(guó)建設(shè)信息;2015年02期
7 高興華;張洪偉;楊鵬飛;;基于BIM的協(xié)同化設(shè)計(jì)研究[J];中國(guó)勘察設(shè)計(jì);2015年01期
8 李勇;;施工進(jìn)度BIM可靠性預(yù)測(cè)方法[J];土木建筑與環(huán)境工程;2014年04期
9 朱賓梅;曹篤娜;;建筑施工企業(yè)精細(xì)化成本管理分析[J];財(cái)會(huì)通訊;2012年17期
10 陳陽(yáng);陳榕爭(zhēng);;WBS:項(xiàng)目管理的基礎(chǔ)[J];工程建設(shè)與設(shè)計(jì);2011年10期
相關(guān)博士學(xué)位論文 前1條
1 趙欽;基于BIM的建筑工程設(shè)計(jì)優(yōu)化關(guān)鍵技術(shù)及應(yīng)用研究[D];西安建筑科技大學(xué);2013年
相關(guān)碩士學(xué)位論文 前8條
1 韓東;里程碑支付模式下BIM 5D現(xiàn)金流動(dòng)態(tài)管理[D];東北財(cái)經(jīng)大學(xué);2015年
2 華通;基于BIM的房地產(chǎn)在建工程價(jià)值評(píng)估研究[D];北京交通大學(xué);2015年
3 劉新欣;供應(yīng)鏈環(huán)境下的建筑企業(yè)庫(kù)存管理研究[D];北京建筑大學(xué);2015年
4 陳麗;基于BIM技術(shù)的建筑企業(yè)投標(biāo)系統(tǒng)[D];安徽大學(xué);2015年
5 王磊;基于BIM的工程項(xiàng)目進(jìn)度預(yù)警研究[D];江西理工大學(xué);2015年
6 王欣;大型公建建筑設(shè)計(jì)管理的研究[D];清華大學(xué);2014年
7 李軍;基于BIM的項(xiàng)目建設(shè)成本動(dòng)態(tài)監(jiān)控系統(tǒng)設(shè)計(jì)與開發(fā)[D];山東建筑大學(xué);2013年
8 李冬霞;工程量清單計(jì)價(jià)模式下工程變更控制研究[D];西華大學(xué);2012年
,本文編號(hào):1814393
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/1814393.html