蟠龍采油廠間歇抽油節(jié)能項(xiàng)目設(shè)計(jì)階段的成本管理研究
本文選題:間歇抽油節(jié)能項(xiàng)目 + 成本管理。 參考:《西安石油大學(xué)》2014年碩士論文
【摘要】:在競爭日益激烈的國際環(huán)境下,蟠龍采油廠只有結(jié)合國內(nèi)外環(huán)境的變化迅速對成本管理的方法做出相應(yīng)的調(diào)整,臺理有效地降低成本,才能立于不敗之地。對于大量的低壓、低滲、低產(chǎn)油井,通過間歇抽油來提高油井經(jīng)濟(jì)效益是一種有效方法。通過調(diào)查研究及實(shí)踐觀察到蟠龍采油廠間歇抽油成本控制方面存在很多不足:間歇抽油成本概念意識薄弱,間歇抽油成本管理水平粗放沒有形成體系,先進(jìn)的技術(shù)沒有得到合理利用,本文正是針對種種問題研究最適宜蟠龍采油廠間歇抽油節(jié)能項(xiàng)目設(shè)計(jì)階段成本管理的解決方案。 本文以蟠龍油廠間歇抽油節(jié)能項(xiàng)目為研究對象,運(yùn)用成本管理及控制方法相關(guān)理論,針對蟠龍油廠問歇抽油節(jié)能項(xiàng)目成本管理方面存在的問題展開研究,通過客觀分析間歇抽油節(jié)能項(xiàng)目節(jié)能模式,成本構(gòu)成,影響成本的因素、項(xiàng)目設(shè)計(jì)階段成本管理現(xiàn)狀,通過深入剖析,提出蟠龍采油廠間歇抽油節(jié)能項(xiàng)目設(shè)計(jì)階段成本管理對策,并給出了蟠龍采油廠間歇抽油節(jié)能項(xiàng)目設(shè)計(jì)階段成本管理實(shí)施保障的建議。意在尋求更為科學(xué)有效的間歇抽油節(jié)能項(xiàng)目設(shè)計(jì)階段成本控制保障機(jī)制和管理體系,為蟠龍采油廠成本控制、提升管理能力和可持續(xù)發(fā)展能力奠定了理論與實(shí)踐相結(jié)合的基礎(chǔ)。
[Abstract]:In the increasingly competitive international environment, the Panlong Oil production Plant can be invincible only by making corresponding adjustments to the cost management method in combination with the changes in the domestic and foreign environment, so as to effectively reduce the cost.For a large number of oil wells with low pressure, low permeability and low production, it is an effective method to improve the economic benefits of wells by intermittent pumping.Through investigation and practice, it is found that there are many deficiencies in the cost control of intermittent pumping in Panlong Oil production Plant: the concept of intermittent pumping cost is weak, and the management level of intermittent pumping cost is not systematic.The advanced technology has not been used reasonably. This paper is the most suitable solution for the cost management in the design stage of the intermittent oil extraction and energy saving project in Panlong oil extraction plant.This paper takes the intermittent pumping energy saving project of Panlong Oil Plant as the research object, applies the relevant theories of cost management and control methods, and studies the problems existing in the cost management of Panlong oil plant's energy saving project.Through the objective analysis of the energy saving mode, the cost structure, the factors affecting the cost, the current situation of the cost management in the project design stage,The cost management countermeasures in the design stage of intermittent oil extraction and energy saving project in Panlong oil extraction plant are put forward, and the suggestion of cost management and guarantee in the design phase of intermittent pumping energy saving project in Panlong oil extraction plant is given.The purpose of this paper is to seek a more scientific and effective mechanism and management system for cost control and management in the design stage of intermittent pumping energy saving project, which lays a foundation for the combination of theory and practice for the cost control of Panlong Oil production Plant and the promotion of management ability and sustainable development ability.
【學(xué)位授予單位】:西安石油大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TE322
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 盧文初;;建筑工程設(shè)計(jì)階段成本管理再探析[J];中國城市經(jīng)濟(jì);2011年14期
2 戴立新;李宗;楊健;;電力建設(shè)項(xiàng)目設(shè)計(jì)階段成本控制問題與對策研究[J];中國管理信息化;2011年03期
3 朱松陽;;掙值分析法在工程項(xiàng)目管理當(dāng)中的應(yīng)用[J];科技創(chuàng)新與應(yīng)用;2013年28期
4 祝亞軍;雷艦;;基于目標(biāo)—作業(yè)成本管理理論的成本管理體系研究[J];經(jīng)濟(jì)研究導(dǎo)刊;2010年18期
5 雷艦;;目標(biāo)—作業(yè)成本管理集合模式研究[J];會計(jì)之友(中旬刊);2010年07期
6 張麗娜;;基于目標(biāo)成本的成本控制研究[J];內(nèi)蒙古農(nóng)業(yè)大學(xué)學(xué)報(bào)(社會科學(xué)版);2011年01期
7 潘美玲;馮光偉;;淺談價(jià)值工程在工程建設(shè)中的應(yīng)用[J];黑龍江科技信息;2013年06期
8 王曉麗;賈云龍;李文斌;田昌奇;;基于掙值分析的施工項(xiàng)目物資成本控制[J];價(jià)值工程;2011年04期
9 馬廣華;;淺議作業(yè)成本法在我國企業(yè)應(yīng)用的必要性與可行性[J];生產(chǎn)力研究;2009年18期
相關(guān)博士學(xué)位論文 前2條
1 蔡軍;產(chǎn)品設(shè)計(jì)階段的成本管理研究[D];中南大學(xué);2012年
2 齊建民;基于可持續(xù)發(fā)展的石油企業(yè)戰(zhàn)略成本管理研究[D];天津大學(xué);2012年
,本文編號:1738062
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/1738062.html