基于BIM的工程預(yù)算管理研究
本文關(guān)鍵詞:基于BIM的工程預(yù)算管理研究 出處:《華中科技大學(xué)》2013年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 建筑工程 預(yù)算管理 BIM 編碼體系 預(yù)算數(shù)據(jù)分析
【摘要】:建筑工程預(yù)算管理對(duì)減少預(yù)算人員的工作量、提高整個(gè)建筑企業(yè)的經(jīng)濟(jì)效益至關(guān)重要。隨著各種基于計(jì)算機(jī)的預(yù)算軟件的廣泛應(yīng)用,工程預(yù)算正不斷的向電算化和智能化邁進(jìn)。但是這些預(yù)算軟件并沒能有效的提高預(yù)算人員工作效率,預(yù)算人員仍然需花費(fèi)大量的時(shí)間才能完成預(yù)算工作。為解決該問題,本文進(jìn)行了基于建筑信息模型(Building Information Model, BIM)的工程成本預(yù)算管理研究,BIM以三維數(shù)字技術(shù)為基礎(chǔ),集成建筑工程各種相關(guān)信息。BIM技術(shù)不僅可以快速、精確地進(jìn)行工程預(yù)算,而且可以與設(shè)計(jì)進(jìn)行有效結(jié)合,隨著設(shè)計(jì)變更自動(dòng)變更預(yù)算成本。 本文在對(duì)國(guó)內(nèi)外的相關(guān)研究現(xiàn)狀進(jìn)行分析的基礎(chǔ)上,介紹了基于BIM的工程預(yù)算管理的基本理論,提出了BIM建模經(jīng)濟(jì)數(shù)據(jù)標(biāo)準(zhǔn),,提出了基于工程計(jì)量、計(jì)價(jià)的BIM建模問題及其解決辦法,并總結(jié)出了BIM建模經(jīng)濟(jì)數(shù)據(jù)標(biāo)準(zhǔn)的設(shè)置要求;本文通過對(duì)3種基于BIM的工程預(yù)算方法進(jìn)行對(duì)比,確定了將適用于我國(guó)的輸出到excel的方法作為本文的研究方法;本文提出了建立基于BIM的工程預(yù)算編碼體系,采用了價(jià)值工程原理對(duì)基于BIM的工程預(yù)算數(shù)據(jù)進(jìn)行分析,并進(jìn)一步總結(jié)出基于BIM的全過程的成本管理框架。 本文將理論與實(shí)際相結(jié)合,選擇了貴州XX工程項(xiàng)目作為實(shí)例來進(jìn)行分析研究,突出顯示了BIM技術(shù)對(duì)于工程預(yù)算管理所起到的重要的作用,希望能為建設(shè)工程企業(yè)進(jìn)行實(shí)際的工程項(xiàng)目預(yù)算管理工作提供一定的參考和借鑒,能夠?yàn)槲覈?guó)的建筑工程項(xiàng)目提高工程效率、降低成本費(fèi)用、有效進(jìn)行預(yù)算管理提供一些理論、方法、思想上的幫助和指引。
[Abstract]:With the wide application of computer - based budgeting software , the engineering budget is moving forward to computerization and intelligence . But these budget software can not effectively improve the working efficiency of the budget personnel . However , the budget personnel still need to spend a lot of time to complete the budget . In order to solve the problem , the BIM technology can only quickly and accurately carry out the engineering budget , but also can effectively combine with the design , and change the budget cost automatically as the design changes . Based on the analysis of the current research situation at home and abroad , this paper introduces the basic theory of BIM based engineering budget management , puts forward the BIM modeling economic data standard , puts forward the BIM modeling problem and its solution based on the BIM , and sums up the setting requirement of BIM modeling economic data standard . The paper puts forward the construction budget coding system based on BIM , analyzes the project budget data based on BIM and further summarizes the whole process cost management framework based on BIM . Based on the combination of theory and practice , this paper selects Guizhou XX Project as an example , and highlights the important role of BIM technology in the management of engineering budget , and hopes to provide some reference and reference for the construction project budget management . It can provide some theories , methods and ideas for the construction project of China to improve engineering efficiency and reduce cost .
【學(xué)位授予單位】:華中科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU723.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前9條
1 趙松波;;基于BIM技術(shù)的魯班安裝算量軟件應(yīng)用價(jià)值分析[J];安裝;2009年09期
2 過俊;;BIM在國(guó)內(nèi)建筑全生命周期的典型應(yīng)用[J];建筑技藝;2011年Z1期
3 黃華;;建設(shè)工程設(shè)計(jì)階段造價(jià)控制新方式——基于BIM的建設(shè)工程造價(jià)管理[J];內(nèi)江師范學(xué)院學(xué)報(bào);2010年10期
4 黃華;;基于BIM的建設(shè)項(xiàng)目全生命周期成本解決方案[J];內(nèi)江師范學(xué)院學(xué)報(bào);2011年08期
5 張衛(wèi);王川;;探討可持續(xù)發(fā)展理念下的建筑集成化設(shè)計(jì)[J];沈陽建筑大學(xué)學(xué)報(bào)(社會(huì)科學(xué)版);2009年03期
6 清華大學(xué)軟件學(xué)院BIM課題組;;中國(guó)建筑信息模型標(biāo)準(zhǔn)框架研究[J];土木建筑工程信息技術(shù);2010年02期
7 何關(guān)培;;BIM和BIM相關(guān)軟件[J];土木建筑工程信息技術(shù);2010年04期
8 楊寶明;;信息化路徑探索與實(shí)踐系列之五 全過程實(shí)際成本快速核算[J];施工企業(yè)管理;2011年05期
9 姜麗君;;建筑工程造價(jià)的控制與管理[J];科技資訊;2007年14期
本文編號(hào):1356580
本文鏈接:http://sikaile.net/guanlilunwen/chengbenguanlilunwen/1356580.html