廣州市城區(qū)樓宇空中步行連廊項(xiàng)目建設(shè)若干問(wèn)題的研究
[Abstract]:Since 2002, the Guangzhou Planning Bureau has put forward the planning plan of building an aerial walking corridor between buildings in the urban area, and plans to build the corridor in the area of multiple personal flow and commercial concentration in Guangzhou. The Pearl River New City core area and the Xingsheng Road Air Walking Corridor system belong to the first batch of corridor projects implemented in Guangzhou. The summary of management experience is significant to the construction of pedestrian corridor system of other buildings in Guangzhou. This paper takes the Pearl River New Town core area and Xingsheng Road Air Walking Corridor Project as the research blueprint, mainly studies the planning key points of the project, project implementation points, project quality, safety, cost, construction organization and schedule control and future construction and operation, etc. The existing problems and solutions in the process of project construction are analyzed in detail. Through the research and analysis, the project plan accords with the dense development of urban traffic network, ensures the smooth traffic flow of pedestrian, effectively makes the traffic relationship between the major buildings and traffic trunk roads in the core area close, and promotes the connection between the commercial areas. As the project is a pilot project, the introduction of agent management mode is an important means to promote the successful implementation of the project before the Asian Games. At the same time, because the project starts hastily, the early work is not perfect, the project implementation is difficult, the actual construction period is delayed 93 days compared with the contract construction period, the actual construction cost is 6.305 million yuan higher than the planned cost. After the completion of the project, according to the management of municipal facilities maintenance management. First of all, from the planning work, it is necessary to urge the relevant project owners to consider implementing the lap way of the verandah, such as pile position or corbel structure, in the stage of building planning and construction. It is suggested that the planning allow commercial (advertising) to be implanted into the verandah, improve its commercial value, and effectively mobilize the building enthusiasm of the owners. Secondly, in the early stage of construction, the pipeline and underground structure must be explored and the hydropower connection of the corridor should be considered as far as possible in the municipal facilities. Third, in terms of design, various styles of design are adopted to match the appearance of various kinds of buildings. During the construction period, the engineering geological exploration work is completed ahead of time, and the construction drawings are improved before construction. Make clear the structure and construction treatment of the corridor interface and the building. Fourth, in the aspect of construction bidding, we must draw up a reasonable time limit, strictly check the bidding list to prevent leakage, and carry out independent bidding or strict examination of steel subcontract units to ensure the progress and quality requirements. According to the guiding ideology of the municipal government, the pedestrian corridor of urban buildings in Guangzhou will be popularized and implemented in all areas with dense commerce and large flow of people. Through this study, it provides experience and guidance for the construction of air walkway corridors of other buildings in the future.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2010
【分類號(hào)】:F284
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 譚小靈,楊葛飚;道路施工對(duì)城市交通影響的分析和對(duì)策研究[J];城市道橋與防洪;2005年03期
2 劉振江;;工程進(jìn)度控制管理[J];黑龍江交通科技;2006年08期
3 孟錦齡;曹海濤;;工程項(xiàng)目管理中進(jìn)度控制和質(zhì)量控制的一點(diǎn)認(rèn)識(shí)[J];黑龍江科技信息;2008年15期
4 陳偉軍;劉永添;蘇艷桃;;帶連廊高層建筑連接方式設(shè)計(jì)研究[J];建筑結(jié)構(gòu)學(xué)報(bào);2009年S1期
5 李娣娜;;香港城市空中連廊空間研究初探[J];山西建筑;2008年29期
6 宋彤;漫步中環(huán)──談香港城市公共空間和環(huán)境設(shè)計(jì)[J];建筑學(xué)報(bào);1998年09期
7 黃福雄;;建筑工程施工質(zhì)量控制[J];四川建材;2009年01期
8 顧軍,魏東平;鋼結(jié)構(gòu)施工中易發(fā)生的質(zhì)量問(wèn)題及監(jiān)理對(duì)策[J];上海建設(shè)科技;1997年05期
9 粟永輝;;建筑工程管理中的“三控制”分析[J];中國(guó)新技術(shù)新產(chǎn)品;2010年10期
10 韓少輝;;淺析施工階段的進(jìn)度控制[J];中國(guó)水運(yùn)(下半月);2008年01期
相關(guān)博士學(xué)位論文 前1條
1 滿慶鵬;建筑施工進(jìn)度計(jì)劃建模與控制方法研究[D];哈爾濱工業(yè)大學(xué);2008年
相關(guān)碩士學(xué)位論文 前3條
1 張豪;城市道路行人過(guò)街立交設(shè)施選址研究[D];西安建筑科技大學(xué);2007年
2 王寶君;城市建設(shè)項(xiàng)目交通影響評(píng)價(jià)若干問(wèn)題研究[D];西安建筑科技大學(xué);2008年
3 高鵬;建設(shè)工程項(xiàng)目進(jìn)度的監(jiān)理控制機(jī)制及策略[D];山東大學(xué);2009年
,本文編號(hào):2122332
本文鏈接:http://sikaile.net/wenyilunwen/guanggaoshejilunwen/2122332.html