1.0 Introduction 介紹


1.1 General Background1.1一般的背景
為nmist項目的實際數(shù)據(jù)是由SKM巖土工程和水文地質(zhì)調(diào)查所。對于土木結(jié)構(gòu)工程的設計,,從現(xiàn)場調(diào)查獲得的地質(zhì)和巖土工程數(shù)據(jù)的理解是必要的和重要的一步。
1.2項目簡介
為了滿足上:溪北戴瑞濱溪集水區(qū)排水要求(墨爾本北部郊區(qū))今后,建議已發(fā)展為核蒸汽供應系統(tǒng)是由yvm和MWC提出。此外,兩階段項目已被確定為是NSP-1和nsp-2 NSSS的主要部分分別。
耐藥的目的是建立污水隧道傳輸上梅里溪的主下水道,埃德加溪污水截流和中央溝下水道隧道已在NSP-1設計。
圖1顯示了在墨爾本北部污水處理系統(tǒng)相關NSP-1和nsp-2項目。
The factual data for the NMIST Project was provided by the SKM geotechnical and hydrogeological investigation. For the design of civil structure projects, the understanding of the geological and geotechnical data obtained from site investigation is a necessary and an important step. 

1.2 Project Brief Description

In order to meet the sewerage requirements for the Upper Merri Creek and North Darebin Creek Catchments (northern suburbs of Melbourne) in the future, the suggestion has been developed as the NSSS which is proposed by YVM and MWC. Moreover, two stage projects have been identified as the main parts of the NSSS which are NSP-1 and NSP-2 respectively. 
The aim of NSP-2 is to construct a sewerage tunnel to transfer the Upper Merri Creek Main sewer, the Edgars Creek Intercepting sewer and the Central Creek sewer to the tunnel that has been designed in the NSP-1. 
Figure 1 shows the NSP-1 and NSP-2 projects related to the Melbourne’s Northern Sewerage System.

Abbreviation Index
SKM - Sinclair Knight Merz
NMIST Project - Northern Melbourne Interception Sewerage Tunnel Project
NSSS – Northern Suburbs Sewerage Strategy
YVW – Yarra Valley Water
MWC – Melbourne Water
NSP-1 – Northern Sewerage Project – Stage 1
NSP-2 – Northern Sewerage Project – Stage 2

Contents
1.0 Introduction 5
1.1 General Background 5
1.2 Project Brief Description 5
1.3 Project Background 6
2.0 Review and Interpretation of Factual Information 6
2.1 Assumed Tunnel Level and Dipping 7
2.2 Boreholes Location 8
2.3 Geological Settings and Intact Rock Description 9
2.3.1 Geological History & Description 9
2.3.2 Groundwater Conditions 10
3.0 Unconfined/Uniaxial Compressive Strength (UCS) 11
3.1 UCS in Basalt 11
3.2 UCS vs Moisture Content 12
3.3 UCS vs Dry Density 12
3.4 UCS vs Point Load Index(IS(50)) 13
4.0 Rock Mass Classification (RMC) Systems 13
4.1 Rock Quality Designation (RQD) 13
4.2 Geological Strength Index (GSI) 14
4.3 Bienawaski’s Rock Mass Rating (RMR) – Geomechanics Classification 15
4.4 Tunnelling Quality Index or Q System 16
4.5 The Applications of Q System and Tunnel Excavation Suggestion 17
4.6 Rock Mass Classification (RMC) – A Summary 18
5.0 Deformation Modulus 18
6.0 Discussion and Recommendation 19
7.0 References: 20
Appendix 1: NIS – 2 Project; Geotechnical and Hydrogeological Factual Report; Top/Base of Geological Units 21
Appendix 2: Geological Cross Section of Study Area for NIS-2 Project 22
Appendix 3: UCS Values and ISRM Classification (International Society for Rock Mechanics) 23
Appendix 4: RQD, RMR and Q with Descriptive Quality of the Rock Mass 24
Appendix 5: Linear Correlation between Is(50) and UCS (Lecture Notes) 24
Appendix 6 : GSI Interpretation and the Relevant Classification Table (Lecture Notes) 25
Appendix 7: Bieniawaski’s Rock Mass Rating (RMR) System 26
Appendix 8: Classification of Individual Parameters Used in the Tunnelling Quality Index Q 27
Appendix 9: Classification of Rock Mass Based on Q-Values 29
Appendix 10: Diagram of Q System Application 29
Appendix 11: Deformation Modulus – Parameters & Equations 30

6.0 Discussion and Recommendation 討論和致謝


Based on the consequences obtained from the previous sections, the discussion and recommendation for the NIS-2 Project will be given as follows:
 Tunnel Support: based in the previous estimations of Q system and RQD ranking, the Basalts are in good condition and the related support system can be rock bolts.
 Tunnel Excavation: refer to Section 4.5
 Tunnel Construction: full-face mechanical excavation. Based on the previous analysis, the Basalts condition is good.
 Future Recommendation: the consideration of erosion will be highly recommended for NIS – 2 Project. The tunnel is for sewage transportation therefore, the erosion could be a problem for the tunnel building materials and the surrounding underground environment in a long time scale

7.0 References:文獻


[1] Northern Sewerage Project – Stage 2, SKM Jacobs Associates, 9 June 2006, Volume 1 of 5
[2] Arild Palmstrom, Raibal Singh, The Deformation Modulus of Rock Masses – Comparisons Between in situ Tests and Indirect Estimates (2001), Tunnelling and Underground Space Technology, Vol.16, No.3, 2001, pp 115-131




本文編號:45227

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/wenshubaike/xindetihui/45227.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶585d7***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com
欧美色婷婷综合狠狠爱| 日韩丝袜诱惑一区二区| 蜜桃传媒在线正在播放| 欧美性高清一区二区三区视频| 亚洲国产天堂av成人在线播放| 91人妻人澡人人爽人人精品| 国产午夜福利在线免费观看| 天堂网中文字幕在线观看| 午夜福利直播在线视频| 久久香蕉综合网精品视频| 少妇丰满a一区二区三区| 国产乱淫av一区二区三区| 国产一区二区三区丝袜不卡| 大香蕉久草网一区二区三区 | 色好吊视频这里只有精| 日韩人妻毛片中文字幕| 欧美一区二区三区视频区| 国产一区一一一区麻豆| 成人精品网一区二区三区| 欧美乱视频一区二区三区| 国产精品欧美激情在线观看| 日韩精品一区二区三区射精| 99久久国产亚洲综合精品| 亚洲少妇人妻一区二区| 大香蕉大香蕉手机在线视频| 美国欧洲日本韩国二本道| 在线观看欧美视频一区| 久久精品a毛片看国产成人| 国产精品香蕉免费手机视频| 一区二区在线激情视频| 少妇激情在线免费观看| 麻豆蜜桃星空传媒在线观看| 亚洲一区二区三在线播放| 中文字幕日韩欧美一区| 欧美一区二区不卡专区| 久久精品国产亚洲熟女| 黄色片一区二区三区高清| 日本不卡一本二本三区| 国产亚洲中文日韩欧美综合网| 国产成人综合亚洲欧美日韩| 国产精品欧美激情在线观看|