建設(shè)工程合同信用對合同管理績效的影響研究
[Abstract]:Modern construction project is a complex system engineering. In the process of construction project implementation, there are different contractual relationships among many project participants. The contract management is indispensable from the planning of the construction project to the completion of the project, and the tasks are different. Therefore, the contract determines the overall objectives of the project, such as cost, time limit, quality, etc. The rights and obligations of the parties are defined and clarified. In the actual project management process, the contract breach of contract, illegal phenomenon frequently appears, resulting in the lack of contract credit, the project participants trust damage, which may lead to the project quality standards, capital and resource waste and other problems. Based on the domestic and foreign research on the subject and task of contract management, firstly, combining the related theories and methods of credit and performance, this paper systematically analyzes and defines the connotation of contract credit and contract management performance of construction project; secondly, This paper analyzes and summarizes the main tasks, objectives and characteristics of the whole life cycle of the contract by using the method of system theory, from the aspects of contract planning, contract signing, The four stages of contract performance and contract termination are comprehensively and systematically analyzed the variables and indicators that affect contract credit and contract management performance. Through the questionnaire survey and related statistical analysis tools to select the primary index system, and then get the key indicators of the impact variables, and combined with the contract credit impact on contract management performance analysis. Then the index system and the hypothesis model between variables are constructed, and the optimal and accurate model is obtained by fitting and modifying the hypothesis model based on the structural equation model theory. Through the analysis and study of the model, the relationship between contract credit and contract management performance and the existing influence factors can be obtained to a certain extent, and finally the beneficial cooperation and win-win relationship between the project participants can be realized. It has certain theoretical significance and reference value for the project participants to improve their own contract management credit level and management performance level.
【學(xué)位授予單位】:西安建筑科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TU723.1;F426.92
【參考文獻】
相關(guān)期刊論文 前10條
1 盧陽春;WTO與我國信用制度的建設(shè)[J];財經(jīng)科學(xué);2002年01期
2 塔娜;柴彥威;;時間地理學(xué)及其對人本導(dǎo)向社區(qū)規(guī)劃的啟示[J];國際城市規(guī)劃;2010年06期
3 李海婷;;建筑施工企業(yè)信用評價體系的管理和運作——以天津市為例[J];城市;2012年08期
4 張德群,關(guān)柯;建筑業(yè)信息模型及信息不對稱分析[J];哈爾濱建筑大學(xué)學(xué)報;2000年04期
5 陳曉紅;王地寧;;企業(yè)信用管理制度的缺失與后果——基于838戶企業(yè)調(diào)查數(shù)據(jù)的經(jīng)驗研究[J];金融研究;2009年01期
6 楊偉濤;;論市場經(jīng)濟中契約信用的不對稱——以政府和壟斷行業(yè)為例[J];南昌大學(xué)學(xué)報(人文社會科學(xué)版);2012年05期
7 沈陽;;企業(yè)合同信用指標(biāo)體系研究[J];標(biāo)準(zhǔn)科學(xué);2013年11期
8 孫勁峰;晏路明;;行為評價的灰色模型及其監(jiān)管意義[J];土木工程與管理學(xué)報;2012年02期
9 陳勁;景勁松;童亮;;復(fù)雜產(chǎn)品系統(tǒng)創(chuàng)新項目風(fēng)險因素實證研究[J];研究與發(fā)展管理;2005年06期
10 馬經(jīng);加強信用制度建設(shè)[J];中國金融;2001年08期
相關(guān)博士學(xué)位論文 前1條
1 趙華;風(fēng)險分擔(dān)對工程項目管理績效的作用機理研究[D];天津大學(xué);2012年
相關(guān)碩士學(xué)位論文 前2條
1 邵文明;綠色供應(yīng)鏈管理的績效評價研究[D];同濟大學(xué);2008年
2 劉偉;基于結(jié)構(gòu)方程的政府信用對政府績效的激勵研究[D];浙江大學(xué);2008年
,本文編號:2142572
本文鏈接:http://sikaile.net/qiyeguanlilunwen/2142572.html