受既有線控制的重慶白沙沱長江大橋施工風險控制研究
[Abstract]:The bridge affected by the existing line should not only meet the operational safety of the existing line, but also ensure the construction safety and progress of the bridge. In the construction of the bridge, it is difficult to protect and remove the existing railway line, and the terrain conditions are complex. Leapfrogging constraints and many other factors. It is because of the comprehensive restriction of these characteristics and factors that there are a lot of safety risk problems in the construction process of the bridge affected by the existing railway lines. In engineering practice, the control of these safety risk problems is still very weak. It is of great theoretical significance and practical value to analyze, evaluate and control the construction safety risk of the bridge affected by the existing railway line systematically so as to minimize the construction safety risk and reach the construction goal of the project. Firstly, the basic concept and essence of risk, the basic method of risk identification and evaluation, and the basic method and theory of risk control are summarized, and the basic content of risk control of bridge construction is determined. Secondly, on the basis of Chongqing Baisatuo Yangtze River Bridge, the characteristics of bridge construction and the demand of risk control are analyzed, and the construction scale, climate and environment, hydrogeology, topography and geomorphology of the project are put forward. In this paper, the construction risk of Chongqing Baisatuo Yangtze River Bridge is evaluated by expert weighting method, such as bridge location characteristics and construction technology maturity. According to the evaluation results, risk control techniques including risk avoidance are adopted. Finally, in view of the main bridge pier 3 of Baisatuo Yangtze River Bridge, the construction of the convenient line and other structures adjacent to (across) the existing railway line have the characteristics of close proximity to the railway, which is greatly affected by the existing line and has great difficulty in construction. The corresponding construction safety control measures are put forward. The construction safety control techniques of pier 3 of the main bridge are mainly as follows: underwater blasting technology, blasting detection and risk assessment of foundation construction; The construction safety control technology of the construction line affected by the existing line includes the inspection and safety protection of the blasting construction near the existing line, the reasonable formulation of the construction plan of the transition section of the construction line and the safety risk assessment of the construction of the adjacent business line structure, and so on. The research on construction risk assessment and control technology of Chongqing Baisatuo Yangtze River Bridge has perfected and enriched the theory of bridge construction risk identification, evaluation and control technology affected by the existing line. At the same time, it provides a reference for the effective control and management of the bridge construction safety risk affected by the existing line.
【學位授予單位】:重慶交通大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:U445.1
【相似文獻】
相關期刊論文 前10條
1 許光崇;復線施工同時進行既有線改造的探討[J];哈鐵科技通訊;1994年04期
2 李明華;既有線改造的過渡與撥接施工[J];鐵道標準設計;2000年01期
3 范華,徐學東,高亮;德國既有線提速的關鍵技術及啟示[J];鐵道標準設計;2004年12期
4 李勝臣;;鐵路既有線封鎖的施工方法研究[J];中國科技信息;2007年01期
5 周世林;;淺談既有線擴能提速改造建設方案[J];鐵道工程學報;2010年10期
6 呂保華;;既有線增建二線鋪架方案探討[J];中國新技術新產(chǎn)品;2013年07期
7 魯恩元;邊改造邊擴能,,是既有線改造減少對行車影響的積極措施[J];鐵道運輸與經(jīng)濟;1995年12期
8 孫紹麟;既有線改造有關問題的思考[J];鐵道工程學報;1998年04期
9 劉志義,孫繼忠;一種將既有線平面測繪精度提高到1/10000的方法[J];鐵道工程學報;1999年01期
10 趙廣文;既有線提速改造施工安全管理的體會和建議[J];鐵道建筑;2005年10期
相關會議論文 前5條
1 徐鶴壽;;既有線提速200 km/h關鍵技術試驗研究[A];鐵道科學技術新進展——鐵道科學研究院五十五周年論文集[C];2005年
2 王崎;;既有線原位更換等跨度鋼梁技術探討[A];鐵道工務論文集(第3冊)[C];2004年
3 肖景勝;;既有線施工安全組織與關鍵控制[A];第三屆鐵路安全風險管理及技術裝備研討會論文集(上冊)[C];2012年
4 姚中華;;既有線提速平面曲線標準探討[A];湖北省土木建筑學會學術論文集(2000-2001年卷)[C];2002年
5 黃波;;在既有線施工中工程調(diào)度的做法[A];山西省鐵道學會2004年度優(yōu)秀學術論文集[C];2005年
相關重要報紙文章 前7條
1 姜書范 伍振 翁佑龍 曹戰(zhàn)鋒 胡李;一曲鐵路提速會戰(zhàn)的壯歌[N];中國鐵道建筑報;2003年
2 石寶進 曹軍 柯浩勇;長纓在手縛蒼龍[N];中國鐵道建筑報;2009年
3 本報記者 江耀明;看龍頭如何舞起來[N];中國鐵道建筑報;2006年
4 朱洪山 張麗麗 肖新蘭 彭銳;百年夢圓之際 飛架膠濟鐵路[N];中國鐵道建筑報;2008年
5 記者 趙守民 朱海燕;戰(zhàn)線1萬里 寸寸保安全[N];中國鐵道建筑報;2009年
6 通訊員 徐金平 羅登橋;多項成果填補施工空白[N];中國鐵道建筑報;2006年
7 記者 張鶴 實習生 趙磊;中鐵二十一局先進性教育扎實有效[N];甘肅日報;2005年
相關碩士學位論文 前10條
1 李強;既有線擴能改造施工安全評價[D];石家莊鐵道大學;2015年
2 李艷哲;受既有線控制的重慶白沙沱長江大橋施工風險控制研究[D];重慶交通大學;2014年
3 郭向前;既有線提速改造線路穩(wěn)定性的研究[D];西南交通大學;2012年
4 李本;鐵路既有線提速線路技改設計原則和主要技術標準的研究[D];西南交通大學;2003年
5 陳鵬;鐵路既有線及增建二線平面計算方法的研究及軟件研制[D];西南交通大學;2005年
6 資林勇;鐵路線路改造及維修施工技術與安全風險管理研究[D];西南交通大學;2013年
7 肖慶彬;山區(qū)小半徑曲線既有線提速無砟軌道應用研究[D];西南交通大學;2010年
8 田志芳;鐵路既有線電氣化改造工程安全保障體系研究[D];北京交通大學;2014年
9 許杰;軟土地區(qū)鐵路既有線動力響應測試及提速列車—路基動力作用特性研究[D];上海交通大學;2011年
10 王日輝;既有線提速改造工程綜合測試與評估研究[D];中南大學;2013年
本文編號:2432455
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2432455.html