小凈距交叉隧道爆破振動控制技術(shù)研究
[Abstract]:Based on the project of Zhongchuan Intercity Railway and the North Ring Tunnel of Lanzhou North marshalling Station, this paper takes the Hongshan Tunnel, a project of Lanzhou hub, as the basis of theoretical analysis. Blasting vibration monitoring and numerical simulation are used to systematically study the blasting technology and control measures in the construction of small clear-spaced space crossing tunnel, which provides basic data and theoretical and technical support for design and construction decision. In order to ensure the successful construction of the North Ring Tunnel, and to provide a useful reference for other similar geological conditions of the tunnel construction. The main research contents and conclusions are as follows: (1) the relationship between vibration velocity and dynamic strain is obtained by linear fitting according to the vibration velocity and dynamic strain data obtained from field blasting vibration monitoring. Based on the control standard of allowable tensile stress increment in near-connection construction, it is determined that the safe vibration velocity control standard of blasting vibration is 7.0 cm / s. (2) on the basis of blasting safety regulations and the existing research data of small clear distance tunnel construction, the critical monitoring range of North Ring Tunnel is determined to be 鹵20m from intersection point by Saadolski formula. Based on the safety considerations, the total synthetic velocity in three directions is taken as the control standard of blasting vibration velocity, and the maximum vibration velocity of the existing tunnel is 5.89 cm / s when blasting is constructed in the range of 鹵20m cross section of the new North Ring Tunnel, and the maximum vibration velocity of the existing tunnel is 5.89 cm / s. Less than the proposed safety speed of blasting vibration. (3) through the analysis of a large number of documents and field measured data, the vibration intensity of blasting is mainly affected by geological conditions, the distance between the blasting centers, the charge quantity, the blasting conditions (the blasting position, the condition of the face near the air), and so on. On the basis of Sadolski's formula and fitting, the empirical formula of blasting vibration suitable for North Ring Tunnel is obtained. Cutting blasting is regarded as the key point of blasting vibration control and monitoring. (4) the spectrum analysis and main frequency distribution analysis of blasting vibration wave pattern are carried out. Through Fourier transform, the typical spectrum chart of blasting vibration signal of North Ring Tunnel is obtained, and the distribution range of main frequency domain of vibration wave is determined. Based on the blasting safety regulations, the main vibration frequency is regarded as the criterion of blasting vibration control standard. It is necessary to strictly control the frequency of blasting vibration wave to avoid the damage caused by resonance. (5) based on the influence factors of blasting vibration intensity, the original blasting scheme is adjusted when passing through the area affected by small net distance. By modifying the borehole design, the charge quantity is controlled, the number of detonation is increased, and the excavation advance is reduced. The blasting vibration effect is reduced to the minimum by selecting reasonable detonator time difference and other methods. (6) the three-dimensional model of cross tunnel with small net distance is established by ANSYS software. By numerical simulation, the maximum vibration velocity of existing tunnel is smaller than that of 7cm/s. Both the tensile and compressive stress and the increment of the tensile and compressive stress of the cross-section lining of the existing tunnel meet the requirements of the code, which shows that the lining structure of the existing tunnel is safe and reliable during blasting. (7) ANSYS finite element software is used to simulate the dynamic response of cutting blasting to the existing tunnel during the step construction of the new tunnel before and after the cross section. The safety of existing tunnel lining is judged by vibration speed and stress. The maximum vibration of existing tunnel lining is less than that of 7cm/s, and the minimum pressure of lining is obtained. The safety factor of tension and the increment of tension and compression stress also meet the safety requirements.
【學(xué)位授予單位】:蘭州交通大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U455.6
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 葉顯亮;;隧道爆破施工對附近房屋的振動監(jiān)測與影響分析[J];貴州大學(xué)學(xué)報(自然科學(xué)版);2010年02期
2 謝興洋;毛彪;;方家山核電隧道爆破工程概述[J];價值工程;2011年17期
3 程圍峰;梁旭;王振宇;;隧道爆破施工對鄰近輸油管道的影響評價[J];石油工程建設(shè);2011年04期
4 馮義;趙先鵬;馬菖林;陳壽根;;臨近隧道爆破研究的現(xiàn)行問題分析[J];公路隧道;2011年03期
5 賈世平;;隧道爆破施工對某高壓油管的影響分析[J];土工基礎(chǔ);2012年05期
6 吳開才;;實(shí)例探析瓦斯隧道爆破設(shè)計[J];黑龍江交通科技;2013年09期
7 曹增福,李會祥;使用多種爆破器材進(jìn)行隧道爆破[J];鐵道工程學(xué)報;1985年04期
8 王華;市區(qū)的隧道爆破工程[J];隧道譯叢;1994年03期
9 謝泰極;隧道爆破與直眼掏槽(續(xù))[J];爆破器材;1997年04期
10 李樹良;對鄰近隧道爆破施工的幾點(diǎn)體會[J];鐵道建筑技術(shù);1998年04期
相關(guān)會議論文 前7條
1 鄭大榕;;控制隧道爆破振動研究[A];中國土木工程學(xué)會隧道及地下工程學(xué)會第八屆年會論文集[C];1994年
2 楊年華;魏志韜;;隧道爆破中乳化炸藥泵送裝填技術(shù)及其應(yīng)用[A];鐵路長大隧道設(shè)計施工技術(shù)研討會論文集[C];2004年
3 常翔;;侯月鐵路云臺山隧道爆破技術(shù)安全管理淺談[A];爆破安全技術(shù)與管理研討會論文集[C];2006年
4 王世n