軟弱圍巖隧道大變形控制技術(shù)研究
[Abstract]:Among the tunnels that have been planned and designed, there are more and more soft surrounding rock tunnels. Because the mechanism and deformation control of large deformation of soft surrounding rock have not formed a complete and systematic theoretical system in design and construction, In this paper, the theory of large deformation of soft surrounding rock, excavation method and supporting control measures are studied. It is more and more urgent to solve the disasters such as large deformation caused by excavation of soft surrounding rock tunnel. Based on the engineering of windward tunnel and related literature, this paper summarizes and analyzes the concept of large deformation of soft surrounding rock, the mechanism of large deformation, the classification of large deformation, the definition and grade of large deformation. This paper introduces topographic geology, surrounding rock characteristics, classification of surrounding rock, large deformation problem and mechanical analysis of large deformation in construction of windward tunnel. The geotechnical engineering software FLAC3D is used to simulate and verify the large deformation of the tunnel's specific engineering geological conditions. According to the engineering characteristics and site conditions of the tunnel, two kinds of control techniques are put forward. 2 Prestressed anchor cable support control technology. Study on the control technology of large deformation of tunnel surrounding rock: by selecting a certain excavation section, four kinds of expanding excavations, including 0.60mL 0.65mm 0.70m and 0.75m, to the surrounding rock and support of tunnel, the initial support stress, and the contour line of the expanded excavation, are adopted. The vertical settlement displacement and horizontal convergent displacement of different parts of the tunnel on the inner and outer side contour of the primary support are simulated and compared. The feasibility of the scheme and the reasonable amount of expansion are analyzed. Study on the Control Technology of Prestressed Anchor Cable support: using different grades of Prestressed Anchorage cables to simulate the reinforcement of the tunnel, the axial force and stress of the surrounding rock, the initial support and the anchor cable of the tunnel are calculated. The vertical settlement displacement and horizontal convergent displacement of different parts of the tunnel with the inner and outer side profile of the initial support are compared and the control effect of the prestressed anchor cable on the large deformation of the tunnel is analyzed. At the end of the paper, the control effect of the two control schemes is summarized and compared, and the effective control scheme is given, that is, the large deformation control is carried out by the regular expansion and excavation of the surrounding rock of the tunnel. It also points out the unsolved problems of large deformation of tunnel, that is, the problems existing in the theory system and control technology in engineering practice.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U452.12;U455.4
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 徐林生,李永林,程崇國(guó);公路隧道圍巖變形破裂類型與等級(jí)的判定[J];重慶交通學(xué)院學(xué)報(bào);2002年02期
2 羅清明,李亮,楊小禮;軟巖隧道的圍巖變形計(jì)算[J];長(zhǎng)沙鐵道學(xué)院學(xué)報(bào);2003年02期
3 趙瑜;李曉紅;盧義玉;康勇;;深埋隧道圍巖應(yīng)變軟化模型參數(shù)的正交設(shè)計(jì)[J];重慶大學(xué)學(xué)報(bào);2008年07期
4 李斌;漆泰岳;高波;曠文濤;;新意法(巖土控制變形工法)概述[J];公路隧道;2009年02期
5 符華興;強(qiáng)擠壓圍巖隧道施工支護(hù)技術(shù)的商榷[J];隧道建設(shè);2003年01期
6 翟進(jìn)營(yíng);楊會(huì)軍;王莉莉;;新意法隧道設(shè)計(jì)施工概述[J];隧道建設(shè);2008年01期
7 段慶偉,何滿潮,張世國(guó);復(fù)雜條件下圍巖變形特征數(shù)值模擬研究[J];煤炭科學(xué)技術(shù);2002年06期
8 朱德仁;巖石工程破壞準(zhǔn)則[J];煤炭學(xué)報(bào);1994年01期
9 劉志春;孫明磊;賈曉云;朱永全;;烏鞘嶺隧道F4~F7斷層區(qū)段壓力、應(yīng)力實(shí)測(cè)與分析[J];石家莊鐵道學(xué)院學(xué)報(bào);2006年02期
10 孫明磊;劉志春;張德瑩;;烏鞘嶺隧道F7斷層區(qū)段左線迂回導(dǎo)坑監(jiān)控量測(cè)[J];石家莊鐵道學(xué)院學(xué)報(bào);2006年02期