山區(qū)陡坡地段橋梁樁基礎(chǔ)施工的安全評(píng)價(jià)及其防護(hù)技術(shù)
[Abstract]:The bridge pile foundation in the steep slope of mountainous area is affected by the factors such as great difference in topographic height, complex and changeable geological conditions and unreasonable construction. During the construction period, various kinds of engineering diseases will inevitably appear, which will directly affect the progress of the project. At the same time, the safety hidden danger is buried in the construction. At present, there is no standard construction standard and safety protection technology for the pile foundation of steep slope bridge in mountainous area, and there is no safety evaluation system for the pile foundation of steep slope bridge during the construction period. Therefore, it is of great practical significance to study the safety evaluation system of bridge pile foundation in steep slope section during construction. The main research results of this paper are as follows: (1) based on the evaluation research on the safety of bridge superstructure and the safety management of construction, the basic principles, applicable scope, advantages and disadvantages of various evaluation methods are expounded in detail. The safety evaluation method of bridge pile foundation in steep slope section during construction is constructed. (2) summing up the phenomena of various engineering diseases occurring during the construction of pile foundation, and analyzing the causes of its formation, which provides a reference for the selection of evaluation model index. (3) the safety evaluation index system and fuzzy comprehensive evaluation model of bridge pile foundation in steep slope section during construction are studied, and the weight of each index is calculated by using AHP. Fuzzy mathematics theory is used to construct the fuzzy comprehensive evaluation model of safety. (4) through the calculation of its safety fuzzy comprehensive evaluation model, the evaluation results are consistent with the actual engineering situation, which shows that the evaluation system is reasonable and feasible. (5) according to the result of evaluation and the analysis of the cause of the disease, the paper puts forward the corresponding preventive measures to ensure the construction progress and the safety of the construction personnel, and to provide a suit of applicable protection technology for the engineering diseases of the bridge pile foundation in the mountainous area. On the one hand, this paper puts forward a practical safety evaluation method for the construction of bridge pile foundation in steep slope section in mountainous area, on the other hand, it provides a reasonable and effective technical basis for engineering diseases during construction to ensure the smooth construction of the project. It is safe and efficient, and has certain engineering practical value and theoretical significance.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:U445.551
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 姚小剛,孫強(qiáng);基于AHP的建筑企業(yè)安全評(píng)價(jià)的研究[J];安徽建筑工業(yè)學(xué)院學(xué)報(bào)(自然科學(xué)版);2001年04期
2 周火明;吳萬平;黃正加;張練;艾凱;徐宗蘇;隆然;;西南某橋基邊坡穩(wěn)定性及加固措施研究[J];長(zhǎng)江科學(xué)院院報(bào);2009年01期
3 馮忠居,張永清;滑動(dòng)帶上橋涵結(jié)構(gòu)的設(shè)計(jì)與施工[J];東北公路;2001年03期
4 李晉,馮忠居,謝永利;滑動(dòng)帶上橋墩位移監(jiān)控及防治研究[J];東北公路;2003年04期
5 周旭;陡坡路段橋梁樁基研究[J];湖南交通科技;2004年04期
6 余繼東;馬熾藩;汪益敏;陳頁(yè)開;嚴(yán)飛淞;;陡坡地段橋梁樁基的施工監(jiān)測(cè)和有限元分析[J];公路;2006年07期
7 張福強(qiáng);馮忠居;任俊甫;魏進(jìn);張長(zhǎng)安;;山區(qū)公路邊坡失穩(wěn)防治技術(shù)研究[J];公路交通科技(應(yīng)用技術(shù)版);2007年04期
8 任俊甫;;滑坡對(duì)橋梁結(jié)構(gòu)的影響及處治技術(shù)研究[J];公路交通科技(應(yīng)用技術(shù)版);2007年08期
9 羅玉虎;于大濤;王東;;巫奉線樅樹坪Ⅱ號(hào)大橋基礎(chǔ)預(yù)加固處理[J];公路交通科技(應(yīng)用技術(shù)版);2010年09期
10 王超;馮忠居;任高科;;秦巴山區(qū)陡坡橋梁樁基礎(chǔ)施工技術(shù)[J];公路交通科技(應(yīng)用技術(shù)版);2012年05期
本文編號(hào):2255946
本文鏈接:http://sikaile.net/kejilunwen/jiaotonggongchenglunwen/2255946.html