青島藍(lán)色硅谷核心區(qū)道路建設(shè)項(xiàng)目風(fēng)險(xiǎn)管理研究
[Abstract]:At present, there are many uncertain influencing factors in the construction process of road engineering construction project, and the contractor is also faced with many risk factors in the construction stage, which may lead to the accident of road engineering construction project. And can bring huge economic loss, therefore, should carry on the effective risk management to the road engineering construction project, thus can better carry on the risk avoidance, guarantees the road engineering project to be able to complete the construction task smoothly, In turn, it can meet the construction schedule requirements stipulated in the contract. Based on the relevant theoretical knowledge of project risk management and the author's experience in project management for many years, this paper systematically analyzes the risk management theory of road engineering construction project by taking the road construction project in Qingdao Blue Silicon Valley core area as an example. This paper summarizes the research progress of risk management at home and abroad, and designs the research means and technical route of this study, and then introduces the relevant theories of project risk management. Secondly, the paper introduces the basic situation of the road construction project in Blue Silicon Valley core area, and analyzes the actual situation and existing problems of the project risk management. Thirdly, the paper systematically analyzes the risk identification and analysis of the road construction project in Qingdao Blue Silicon Valley core area, analyzes the basic principles of the risk analysis of the road engineering construction project, and discusses the risk identification process of the road construction project. According to the risk identification method, the risk factors of the road construction projects in the Blue Silicon Valley core area are determined. Based on the basic principles of fuzzy comprehensive evaluation method and fuzzy analytic hierarchy process, the mathematical model of road construction project risk assessment in the core area of Blue Silicon Valley is constructed, and the fuzzy comprehensive evaluation results of the project are obtained by theoretical calculation. Finally, according to the project evaluation results, the paper analyzes the basic strategy of risk response, and puts forward the corresponding risk countermeasures according to the actual characteristics of the road construction project in the Blue Silicon Valley core area. Based on the three steps of risk identification, risk analysis and risk response, this paper systematically analyzes the risk of road construction projects in terms of investment, policy, schedule, contract, cost, quality, etc. In order to carry out effective risk control in the process of project implementation, reduce the impact of project risk on the project, and provide experience and reference for the risk management of other urban road construction projects.
【學(xué)位授予單位】:中國(guó)海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:U415.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉云華;項(xiàng)目風(fēng)險(xiǎn)管理[J];內(nèi)蒙古科技與經(jīng)濟(jì);2004年S1期
2 申建紅;加強(qiáng)施工項(xiàng)目風(fēng)險(xiǎn)管理[J];建筑;2001年03期
3 宋晉杰;;對(duì)房地產(chǎn)項(xiàng)目風(fēng)險(xiǎn)管理的一些認(rèn)識(shí)[J];天津建設(shè)科技;2007年S1期
4 劉漢榮;秦紅燕;丁向麗;;國(guó)防科研試驗(yàn)項(xiàng)目風(fēng)險(xiǎn)管理[J];裝備指揮技術(shù)學(xué)院學(xué)報(bào);2008年04期
5 顧軍政;;建筑企業(yè)項(xiàng)目風(fēng)險(xiǎn)管理中存在問(wèn)題及防治措施[J];交通科技與經(jīng)濟(jì);2009年03期
6 楊曉華;李盛;曾朝文;;淺談水利水電施工企業(yè)的項(xiàng)目風(fēng)險(xiǎn)管理[J];江西水利科技;2013年01期
7 丁遠(yuǎn);;房地產(chǎn)項(xiàng)目風(fēng)險(xiǎn)管理探討[J];科技創(chuàng)新與應(yīng)用;2013年15期
8 張愛(ài)珍;;公路項(xiàng)目風(fēng)險(xiǎn)管理的認(rèn)識(shí)與思考[J];科技促進(jìn)發(fā)展;2010年S1期
9 楊正祥;;軟件項(xiàng)目風(fēng)險(xiǎn)管理分析與實(shí)踐[J];中國(guó)水運(yùn)(理論版);2007年03期
10 崔金志;;論施工項(xiàng)目風(fēng)險(xiǎn)管理[J];中國(guó)民航大學(xué)學(xué)報(bào);2007年S1期
相關(guān)會(huì)議論文 前7條
1 彭英民;劉化民;;項(xiàng)目風(fēng)險(xiǎn)管理的重要性[A];河南省冶金企業(yè)創(chuàng)新與和諧發(fā)展研討會(huì)——暨技術(shù)經(jīng)濟(jì)年會(huì)論文集[C];2008年
2 王虎軍;毛明裕;周建敏;;淺談項(xiàng)目風(fēng)險(xiǎn)管理[A];土木建筑學(xué)術(shù)文庫(kù)(第16卷)[C];2012年
3 胡勇;肖靜華;龐家峰;謝康;;軟件項(xiàng)目風(fēng)險(xiǎn)管理的協(xié)同過(guò)程模型[A];信息經(jīng)濟(jì)與國(guó)民經(jīng)濟(jì)增長(zhǎng)方式的轉(zhuǎn)變——中國(guó)信息經(jīng)濟(jì)學(xué)會(huì)2006年學(xué)術(shù)年會(huì)論文集[C];2006年
4 初哲;江共養(yǎng);;澳大利亞礦山項(xiàng)目風(fēng)險(xiǎn)管理工作的分析及反思[A];第九屆全國(guó)采礦學(xué)術(shù)會(huì)議暨礦山技術(shù)設(shè)備展示會(huì)論文集[C];2012年
5 鄭清濤;楊世明;孫元文;;項(xiàng)目風(fēng)險(xiǎn)管理的幾點(diǎn)體會(huì)及做法[A];山東水利學(xué)會(huì)第八屆優(yōu)秀學(xué)術(shù)論文匯編[C];2003年
6 楊律青;;基于SAP的ERP項(xiàng)目風(fēng)險(xiǎn)管理[A];第10屆計(jì)算機(jī)模擬與信息技術(shù)會(huì)議論文集[C];2005年
7 孫曉蕾;李建平;陳建明;;基于項(xiàng)目生命周期觀的R&D項(xiàng)目風(fēng)險(xiǎn)管理分析[A];第八屆中國(guó)管理科學(xué)學(xué)術(shù)年會(huì)論文集[C];2006年
相關(guān)重要報(bào)紙文章 前8條
1 宏偉;中國(guó)企業(yè)項(xiàng)目風(fēng)險(xiǎn)管理任務(wù)艱巨[N];中國(guó)質(zhì)量報(bào);2011年
2 記者 陳樹(shù)青 李仕兵 通訊員 王建勛;實(shí)施項(xiàng)目風(fēng)險(xiǎn)管理[N];中國(guó)鐵道建筑報(bào);2006年
3 張慧民;化解項(xiàng)目風(fēng)險(xiǎn)走好“四步棋”[N];中國(guó)建設(shè)報(bào);2009年
4 張慧民;設(shè)計(jì)院如何化解轉(zhuǎn)型風(fēng)險(xiǎn)[N];建筑時(shí)報(bào);2010年
5 中南大學(xué)商學(xué)院副院長(zhǎng)、博士導(dǎo)師、教授 肖序;評(píng)《高速公路BOT項(xiàng)目風(fēng)險(xiǎn)管理問(wèn)題研究》[N];湖南日?qǐng)?bào);2011年
6 本報(bào)記者 何志丹 劉立巖 特約記者 盧迪;一封表?yè)P(yáng)信引發(fā)的新聞[N];石油管道報(bào);2009年
7 記者 姜瑜;美亞“中國(guó)護(hù)照計(jì)劃”助企業(yè)“走出去”[N];上海金融報(bào);2011年
8 王建國(guó);多措并舉,破解蘭成管道難題[N];石油管道報(bào);2011年
相關(guān)博士學(xué)位論文 前3條
1 葉峗;設(shè)計(jì)項(xiàng)目風(fēng)險(xiǎn)管理研究[D];中國(guó)美術(shù)學(xué)院;2015年
2 蔣國(guó)萍;軟件項(xiàng)目風(fēng)險(xiǎn)管理的貝葉斯網(wǎng)絡(luò)模型研究[D];國(guó)防科學(xué)技術(shù)大學(xué);2005年
3 潘春光;軟件項(xiàng)目風(fēng)險(xiǎn)計(jì)劃與過(guò)程控制模型研究[D];國(guó)防科學(xué)技術(shù)大學(xué);2006年
相關(guān)碩士學(xué)位論文 前10條
1 李文浩;基于財(cái)務(wù)盡職調(diào)查的新三板項(xiàng)目風(fēng)險(xiǎn)管理研究[D];蘇州大學(xué);2015年
2 李蓁;東吳創(chuàng)投項(xiàng)目風(fēng)險(xiǎn)管理問(wèn)題研究[D];蘇州大學(xué);2015年
3 岳偉領(lǐng);河北建材職業(yè)技術(shù)學(xué)院新校區(qū)建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];燕山大學(xué);2015年
4 郭芳;基于貝葉斯網(wǎng)絡(luò)的西南國(guó)際商貿(mào)城項(xiàng)目風(fēng)險(xiǎn)管理[D];江西理工大學(xué);2015年
5 魏巍;中建總公司集成協(xié)同平臺(tái)建設(shè)項(xiàng)目風(fēng)險(xiǎn)評(píng)估與管控研究[D];華北電力大學(xué);2015年
6 黃洵斌;火力發(fā)電企業(yè)基建項(xiàng)目風(fēng)險(xiǎn)管理及其智能管理系統(tǒng)研究[D];華北電力大學(xué);2015年
7 尹翔;NG物流信息系統(tǒng)開(kāi)發(fā)中的項(xiàng)目風(fēng)險(xiǎn)管理研究[D];電子科技大學(xué);2013年
8 孫鑫;成都鐵路口岸國(guó)際業(yè)務(wù)區(qū)項(xiàng)目風(fēng)險(xiǎn)管理的研究[D];電子科技大學(xué);2015年
9 肖家勝;伊拉克薩拉哈丁燃油氣電站DCS項(xiàng)目風(fēng)險(xiǎn)管理[D];上海交通大學(xué);2014年
10 王燁鋒;企業(yè)IT項(xiàng)目風(fēng)險(xiǎn)管理平臺(tái)設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2014年
,本文編號(hào):2423709
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2423709.html