鉆爆法和TBM兩種不同施工方法下深埋高外水壓力隧洞的破壞特點(diǎn)及其力學(xué)機(jī)制分析
[Abstract]:Drilling and blasting method and TBM method are two main methods of underground engineering excavation, which have significant influence on the disturbance degree of surrounding rock and reinforcement measures. In this paper, the influence of different excavation methods on surrounding rock failure under the same geological conditions is studied by taking four large tunnels with parallel distribution and driven by TBM method and drilling blasting method as research objects. Through the statistical treatment and mechanical analysis of a large number of geological data, the failure mode of surrounding rock is summarized, and the common characteristics of the influence of two different construction methods on surrounding rock are summarized and compared, including the same damage site, similar damage area and close damage pit depth. In addition, the difference of the influence of the two methods on the surrounding rock is compared. The second failure range of TBM construction is larger than that of drilling blasting method, and it is easy to produce rockburst and stress type failure. However, the rock mass is prone to structural failure during drilling and blasting construction. On this basis, the mechanical mechanism of various failure phenomena is analyzed, and the research results can provide a reference for the construction and reinforcement of similar projects.
【作者單位】: 成都理工大學(xué)地質(zhì)災(zāi)害防治與地質(zhì)環(huán)境保護(hù)國家重點(diǎn)實(shí)驗(yàn)室;中國電建集團(tuán)華東勘測設(shè)計研究院有限公司;
【基金】:國家自然科學(xué)基金(51308082,51208069) 四川省教育廳基金(15ZA0075)
【分類號】:U451;U455.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;我國隧道鉆爆法施工世界先進(jìn)[J];巖土工程界;2000年03期
2 付維;;淺析隧道鉆爆法施工在高溫地?zé)釁^(qū)的應(yīng)用及技術(shù)分析[J];科技資訊;2010年35期
3 陳善亮;;談高速公路鉆爆法隧道施工安全管理[J];山西建筑;2013年11期
4 楊長興;;談高速公路鉆爆法隧道施工安全管理[J];山西建筑;2014年01期
5 李德巧;隧道鉆爆法依次施組模式進(jìn)度模型的建立與應(yīng)用[J];隧道建設(shè);2005年04期
6 徐冬青,吳衛(wèi)東;21SGBC-CR型電腦臺車的使用效果及改進(jìn)[J];鐵道建筑技術(shù);2000年06期
7 趙德剛;;津秦客專隧道鉆爆法施工技術(shù)[J];鐵道建筑技術(shù);2010年05期
8 譚春騰;;淺談沔渡隧道鉆爆法施工工藝[J];科技信息;2012年05期
9 劉勝軍;;隧道鉆爆法施工進(jìn)度模型的分析建立及應(yīng)用[J];北方交通;2013年05期
10 周曉然;;TBM在我國的發(fā)展及應(yīng)用前景[J];山西建筑;2008年14期
相關(guān)會議論文 前10條
1 曾元一;翁世梁;朱正玨;;坪林主隧道大斷面TBM之施工規(guī)劃[A];海峽兩岸土力學(xué)及基礎(chǔ)工程地工技術(shù)學(xué)術(shù)研討會論文集[C];1994年
2 曾元一;翁世梁;朱正玨;;全斷面隧道鉆掘機(jī)(TBM)于軟弱巖層之施工[A];海峽兩岸土力學(xué)及基礎(chǔ)工程地工技術(shù)學(xué)術(shù)研討會論文集[C];1994年
3 黃平華;;盾構(gòu)及TBM設(shè)備監(jiān)造的實(shí)踐與探索[A];中國中鐵隧道集團(tuán)2007年水底隧道專題技術(shù)交流大會論文集[C];2007年
4 李建華;呂瑞虎;李文俊;;TBM(盾構(gòu))技術(shù)應(yīng)用現(xiàn)狀及幾個主要技術(shù)關(guān)鍵的探討[A];2012年中鐵隧道集團(tuán)低碳環(huán)保優(yōu)質(zhì)工程修建技術(shù)專題交流會論文集[C];2012年
5 李治國;韓忠存;張民慶;吳全立;;鉆孔與裝藥平行作業(yè)技術(shù)研究及其危險性評估[A];中國土木工程學(xué)會隧道及地下工程學(xué)會第九屆年會論文集[C];1996年
6 康斌;;長距離單護(hù)盾TBM掘進(jìn)凹凸面球窩自鎖結(jié)構(gòu)管片安裝錯臺控制技術(shù)[A];2012年中鐵隧道集團(tuán)低碳環(huán)保優(yōu)質(zhì)工程修建技術(shù)專題交流會論文集[C];2012年
7 孫樹林;何劍凱;林起昌;;節(jié)理化巖體中最佳隧洞開挖方向的確定[A];中國土木工程學(xué)會第八屆土力學(xué)及巖土工程學(xué)術(shù)會議論文集[C];1999年
8 唐烈先;唐春安;黃滿斌;徐奴文;;TBM掘進(jìn)隧洞巖爆實(shí)時監(jiān)測系統(tǒng)的構(gòu)建[A];和諧地球上的水工巖石力學(xué)——第三屆全國水工巖石力學(xué)學(xué)術(shù)會議論文集[C];2010年
9 鐘登華;李景茹;張偉波;;復(fù)雜隧洞TBM施工系統(tǒng)仿真的理論研究[A];Systems Engineering, Systems Science and Complexity Research--Proceeding of 11th Annual Conference of Systems Engineering Society of China[C];2000年
10 金豐年;錢七虎;;隧洞開挖的三維有限元計算[A];錢七虎院士論文選集[C];2007年
相關(guān)重要報紙文章 前4條
1 通訊員 周廣寬 楊廣臣 楊吉年;十二局集團(tuán)二公司鉆爆法施工又創(chuàng)紀(jì)錄[N];中國鐵道建筑報;2011年
2 本報記者江耀明 通訊員楊廣臣 王學(xué)東 張紫瓊;解開山門的129密碼[N];中國鐵道建筑報;2009年
3 高星亮;用于敷設(shè)更大管道的微隧洞開挖機(jī)[N];中華建筑報;2001年
4 本報記者 帥弋;貴金線年底建成通車[N];貴陽日報;2009年
相關(guān)博士學(xué)位論文 前3條
1 王凱;濱海地區(qū)鉆爆法施工對鄰近腐蝕管線的影響及風(fēng)險評估分析[D];大連理工大學(xué);2013年
2 孫忠強(qiáng);公路隧道鉆爆法施工粉塵運(yùn)移規(guī)律及控制技術(shù)研究[D];北京科技大學(xué);2015年
3 張寒冰;TBM支撐—推進(jìn)—換步系統(tǒng)建模與同步控制研究[D];天津大學(xué);2016年
相關(guān)碩士學(xué)位論文 前10條
1 張水華;鉆爆法隧道施工對地面的影響及控制技術(shù)研究[D];重慶交通大學(xué);2014年
2 顧晶彪;公路隧道不同鉆爆法對施工進(jìn)度的影響研究[D];重慶交通大學(xué);2012年
3 紀(jì)珊珊;長大隧道開敞式TBM掘進(jìn)性能及刀具損耗規(guī)律研究[D];石家莊鐵道大學(xué);2015年
4 李榮鑫;TBM機(jī)頭架焊接數(shù)值模擬與接頭金相組織分析[D];鄭州大學(xué);2016年
5 王子謙;TBM支撐推進(jìn)換步機(jī)液系統(tǒng)數(shù)字仿真分析[D];天津大學(xué);2014年
6 張愛強(qiáng);TBM主減速器耦合動力學(xué)特性分析的軸系單元法及其實(shí)驗(yàn)研究[D];大連理工大學(xué);2016年
7 林文凱;鐵路隧道圍巖蠕變對TBM圓形襯砌力學(xué)特性的影響研究[D];西南交通大學(xué);2017年
8 陳青梅;TBM支撐—推進(jìn)—換步機(jī)構(gòu)動力學(xué)特性分析[D];天津大學(xué);2016年
9 王書明;隧道鉆爆法施工對地表建筑結(jié)構(gòu)的動力響應(yīng)研究[D];長安大學(xué);2014年
10 程懷舟;基于鉆機(jī)的TBM隧洞施工超前地質(zhì)預(yù)報系統(tǒng)開發(fā)研究[D];武漢大學(xué);2005年
,本文編號:2213551
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2213551.html