基于沖突技術(shù)法的導流島信號交叉口右轉(zhuǎn)車道實際通行能力模型
發(fā)布時間:2018-07-15 14:57
【摘要】:針對導流島沖突區(qū)非機動車與行人具有優(yōu)先通行權(quán)的假設(shè)與實際運行狀況不符的情況,描述了機動車截流效應(yīng),并以沖突技術(shù)法為基礎(chǔ),提出了針對導流島信號交叉口的右轉(zhuǎn)車道實際通行能力模型.該模型充分考慮了信號控制、非機動車與行人的混合流率、非機動車與行人過街群的過街時間、非機動車與行人過街群的單群個數(shù)及人行橫道寬度等因素的影響,并采用福州市的實測數(shù)據(jù)對模型進行標定與檢驗.結(jié)果表明:提出的模型能較好地反映導流島沖突區(qū)的實際運行狀況.
[Abstract]:In view of the fact that the assumption that non-motor vehicles and pedestrians have priority right of passage in conflict zone of diversion island is not in accordance with the actual running condition, the effect of motor vehicle closure is described, and the conflict technique method is used as the basis. The actual capacity model of the right turning lane for the signal intersection of the diversion island is proposed. The effects of signal control, mixed flow rate of non-motor vehicle and pedestrian, crossing time of non-motor vehicle and pedestrian group, single group number of non-motor vehicle and pedestrian crossing group and width of crosswalk are fully considered in the model. The model is calibrated and verified by the measured data of Fuzhou. The results show that the proposed model can better reflect the actual operation of the conflict zone of the diversion island.
【作者單位】: 北京工業(yè)大學城市交通學院;福州大學土木工程學院;
【基金】:北京市科技計劃資助項目(Z131100004513002)
【分類號】:U491.233
本文編號:2124457
[Abstract]:In view of the fact that the assumption that non-motor vehicles and pedestrians have priority right of passage in conflict zone of diversion island is not in accordance with the actual running condition, the effect of motor vehicle closure is described, and the conflict technique method is used as the basis. The actual capacity model of the right turning lane for the signal intersection of the diversion island is proposed. The effects of signal control, mixed flow rate of non-motor vehicle and pedestrian, crossing time of non-motor vehicle and pedestrian group, single group number of non-motor vehicle and pedestrian crossing group and width of crosswalk are fully considered in the model. The model is calibrated and verified by the measured data of Fuzhou. The results show that the proposed model can better reflect the actual operation of the conflict zone of the diversion island.
【作者單位】: 北京工業(yè)大學城市交通學院;福州大學土木工程學院;
【基金】:北京市科技計劃資助項目(Z131100004513002)
【分類號】:U491.233
【相似文獻】
相關(guān)期刊論文 前5條
1 賴元文;榮建;劉小明;;設(shè)置導流島的信號交叉口右轉(zhuǎn)通行能力模型[J];北京工業(yè)大學學報;2012年06期
2 吳有奇;城市斜交叉路口平面處理[J];城市道橋與防洪;2003年01期
3 何佼龍,張新勝,肖劍波;城市道路斜交路口平面設(shè)計分析[J];森林工程;2005年03期
4 長軒;;厲兵秣馬鋪就暢通路——吉林省長春市暢通工程連續(xù)七年被評為全國一等水平工作紀實[J];道路交通管理;2011年01期
5 ;[J];;年期
相關(guān)會議論文 前1條
1 繆勝敏;宋為;弓成;;談?wù)劷煌▽Я鲘u[A];土木建筑學術(shù)文庫(第9卷)[C];2008年
相關(guān)重要報紙文章 前1條
1 記者 林偉;?谡埳虾<野衙}交通難題[N];海南日報;2013年
,本文編號:2124457
本文鏈接:http://sikaile.net/kejilunwen/daoluqiaoliang/2124457.html