hydraulic and hydroelectric project grade cross operations s

發(fā)布時間:2016-08-08 15:18

  本文關(guān)鍵詞:水利水電工程立體交叉作業(yè)安全管理執(zhí)行傳遞機(jī)制設(shè)計(jì),由筆耕文化傳播整理發(fā)布。


水利水電工程立體交叉作業(yè)安全管理執(zhí)行傳遞機(jī)制設(shè)計(jì)

Transmission mechanism design for grade cross operations safety management execution in hydraulic and hydroelectric project

[1] [2] [3] [4]

WANG Jian-ping, NIE Ben-wu, ZHANG Feng-yu, LI Zhi ( 1 College of Economics & Management, China Three Gorges University, Yichang Hubei 443002,China 2 Dadu Ricer Hydropower D

[1]三峽大學(xué)經(jīng)濟(jì)與管理學(xué)院,湖北宜昌443002; [2]國電大渡河流域水電開發(fā)有限公司,四川成都610041; [3]中國長江三峽集團(tuán)公司機(jī)電工程局,四川成都610041

文章摘要為有效解決水利水電工程立體交叉作業(yè)引發(fā)的安全組織管理問題,必須實(shí)現(xiàn)安全管理各類信息順利溝通,進(jìn)而提高安全管理績效。借助應(yīng)用控制系統(tǒng)原理與方法,結(jié)合水電工程施工特點(diǎn)和施工組織結(jié)構(gòu)模式,將安全管理責(zé)任系統(tǒng)分成多個控制層次,設(shè)置多種功能模塊;通過在不同模塊中設(shè)立反饋環(huán)節(jié),進(jìn)行機(jī)制運(yùn)行的補(bǔ)償和調(diào)節(jié),以實(shí)現(xiàn)閉環(huán)管理。對三峽升船機(jī)工程進(jìn)行買證研究,提出立體交叉作業(yè)協(xié)調(diào)管理機(jī)制。研究結(jié)果表明:工作單元分配和信息溝通渠道是立體交叉作業(yè)傳遞機(jī)制的關(guān)鍵點(diǎn),,提出一縱一橫2大管理層面的安全組織結(jié)構(gòu)新思路,設(shè)計(jì)立體交叉作業(yè)的縱向系統(tǒng)傳涕機(jī)制和橫向系統(tǒng)傳遞機(jī)制。

AbstrIt was held by the authors that in order to solve effectively the problem of safety organizational management for grade cross operations in hydraulic and hydroelectric projects, all kinds of information on safety management should be disseminated properly. The responsibility system of safety management was divided into several control layers. Several function modules were set up. Closed-loop management was considered for the system by designing feedback paths between the modules. Its coordination management mechanism was designed for project's grade cross operations. It was discovered that both work unit alloca- tion and information communication channel are the key points. A safety management organization structure was designed with two main management layers, a horizontal one and a vertical one. Three Gorges ship lift project was studied empirically.

文章關(guān)鍵詞:

Keyword::hydraulic and hydroelectric project grade cross operations safety organization structure executive force transmission mechanism

課題項(xiàng)目:國家自然科學(xué)基金資助(51379110).

 

 


  本文關(guān)鍵詞:水利水電工程立體交叉作業(yè)安全管理執(zhí)行傳遞機(jī)制設(shè)計(jì),由筆耕文化傳播整理發(fā)布。



本文編號:88607

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/anquangongcheng/88607.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶26def***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com