進度管理思路在國際工程索賠中的應用研究
發(fā)布時間:2018-01-10 22:31
本文關鍵詞:進度管理思路在國際工程索賠中的應用研究 出處:《上海交通大學》2014年碩士論文 論文類型:學位論文
【摘要】:由于國際工程中復雜的政治、經濟、工藝以及材料等風險情況特殊性,合同內或者合同外等的原因都可能對承包商的形成工期影響,造成經濟損失。實際索賠過程中,絕大多數工程以相應法律和國際通用的合同標準條款規(guī)定以及相應的程序、證據,作為工程索賠的依據。進度管理作為項目管理中的一環(huán),系統(tǒng)性地將工程中所涉及的事件都有機地結合到一起,并以邏輯關系相連,構成關鍵線路及非關鍵線路組成的管理體系,應用于整個工程中。在索賠事件的發(fā)生時,追溯進度管理過程中的關聯性,有助于提高索賠機會的成立,并且提供一系列工期及費用索賠所需的有效支持資料。本文針對國際工程進度管理思路,用以解決索賠問題。主要成果包括:(1)確定索賠的法律基礎及合同模式;(2)利用進度管理中的界面管理,確定合同各方權責,在工作分解的建立中,明確索賠的內容,并在歸集資料時建立標準系統(tǒng);(3)利用進度編制的雙邏輯模式,盡可能的使受影響的重大分項落在項目關鍵線路上,并利用進度資料的準備和確認方式,在索賠之前或者索賠的前期,提供有效資料,提高索賠的成立成功率和索賠資料的準確性。
[Abstract]:Due to the particularity of the complex political, economic, technological and material risk situations in international engineering, the reasons within or outside the contract may affect the contractor's duration of formation. In the actual claim process, the vast majority of the works are based on the terms of the relevant laws and international contract standards, as well as the corresponding procedures, evidence. As the basis of project claim, schedule management, as a link in project management, systematically combines the events involved in the project and links them with logic relations. The management system composed of critical and non-critical lines is applied to the whole project. When the claim event occurs, the correlation in the process of retroactive progress management is helpful to improve the establishment of the claim opportunity. And provide a series of time and cost claims for effective support information. This paper aims at the international project schedule management ideas. The main results include the determination of the legal basis and the contract model of the claim; 2) make use of the interface management in schedule management to determine the rights and responsibilities of the parties to the contract, make clear the content of the claim in the establishment of the work decomposition, and set up the standard system when collecting the data; Make use of the double logical model of schedule compilation, to the extent possible, make the major sub-items affected fall on the key lines of the project, and use the preparation and confirmation of progress information before or prior to the claim. Provide effective information to improve the success rate of claim and the accuracy of claim information.
【學位授予單位】:上海交通大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU72
【參考文獻】
相關期刊論文 前1條
1 胡艷玲;;網絡計劃技術在工期索賠中的應用[J];四川建材;2010年04期
,本文編號:1407096
本文鏈接:http://sikaile.net/jingjilunwen/zhengzhijingjixuelunwen/1407096.html