時間和質(zhì)量管理在CH公司國情普查項目的應用研究
[Abstract]:CH is the largest surveying and mapping enterprise in Zhongshan. It has a national Grade A surveying and mapping qualification. It has won more than 30 national, provincial and municipal science and technology progress awards. The company has grown up to be Zhongshan's land and real estate management. Urban planning and urban construction have provided a large number of surveying and mapping achievements and services. Since 2010, the surveying and mapping geographic information industry has developed rapidly, the scale of surveying and mapping projects has become larger and larger, and the quality requirements have become higher and higher. But CH's project management tools have not been improved. The project management lacks scientific and reasonable plan, and the execution and adjustment is quite random. In the process of execution, it often appears first loose and then tight. In the later stage, the quality control is often ignored for the sake of project schedule, and some projects can not be completed according to the established goal. The contradiction between the whole project management system and the current situation. The time and quality management of the Ch company's national situation census project is a political task to be solved urgently. The national situation census results are regarded as the initial data of the geographical situation monitoring. The project has the characteristics of tight time, high quality and great technical difficulty. How to manage the time and quality of the project is an urgent problem to be solved. This paper starts with the present situation and existing problems of time management and quality management of the project, combining with the practical management experience, and with the help of the theory and method of modern project management, explores the management mode suitable for the project. In the aspect of time management, this paper combines theory and practice to decompose, sort, estimate, plan and control the activities of the project step by step. The management scientific analysis methods, such as (PERT), Gantt chart and critical path method, are adopted to carry out the work of each stage of the project. Some of the working procedures and plans in actual production are deviated, and the critical path time of the other stage is compressed through the adjustment of resources. Ensure the overall progress of the project. In terms of quality management, the author starts with quality planning, quality assurance and quality control, and adopts quality verification system PDCA cycle method and total quality management method. The quality consciousness of the whole staff is put forward to ensure that the quality of the national census project meets the planning requirements. This paper is an attempt to study the project theory of the national census project, hoping to have some reference significance and reference function for the similar surveying and mapping project in the future.
【學位授予單位】:電子科技大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F49
【參考文獻】
相關(guān)期刊論文 前10條
1 陳傳河;;地理國情普查標準時點核準技術(shù)探討[J];中國科技信息;2016年01期
2 吳玉忱;;測繪企業(yè)內(nèi)部信息管理的內(nèi)容及重要性[J];測繪與空間地理信息;2015年12期
3 付治河;;地理國情普查項目監(jiān)理方法研究[J];測繪通報;2015年04期
4 楊伯鋼;王淼;;北京市第一次地理國情普查方法淺談[J];北京測繪;2015年01期
5 桂新;伍水華;;地理國情普查過程質(zhì)量控制的內(nèi)容與要求[J];江西測繪;2014年04期
6 史文博;;淺談地理國情普查的技術(shù)流程[J];測繪與空間地理信息;2014年06期
7 劉德鑫;;淺談測繪工程的質(zhì)量管理與系統(tǒng)控制[J];黑龍江冶金;2012年04期
8 劉旭;;第二次全國土地調(diào)查土地利用現(xiàn)狀數(shù)據(jù)縮編項目成果質(zhì)量檢查與評定的探討[J];測繪與空間地理信息;2011年04期
9 李光明;;測繪工程的質(zhì)量管理與系統(tǒng)控制探討[J];煤炭技術(shù);2011年02期
10 寧鎮(zhèn)亞;;中、日、韓三國測繪法對測繪成果管理的規(guī)定[J];測繪與空間地理信息;2009年05期
相關(guān)碩士學位論文 前6條
1 盧德明;東莞市某公路測繪工程質(zhì)量管理控制[D];華南理工大學;2014年
2 胥姝;SL機場測繪工程項目的進度與質(zhì)量管理研究[D];電子科技大學;2014年
3 孔旭霞;時間管理在烏茲別克泵站改造項目中的應用研究[D];首都經(jīng)濟貿(mào)易大學;2014年
4 張利輝;AMS項目質(zhì)量管理的應用研究[D];電子科技大學;2013年
5 孟凡英;XX工程施工質(zhì)量控制研究[D];西南交通大學;2013年
6 邵怡;房地產(chǎn)項目質(zhì)量管理的探索與實踐[D];復旦大學;2008年
,本文編號:2226805
本文鏈接:http://sikaile.net/jingjilunwen/xxjj/2226805.html