基于節(jié)約集約視角的長(zhǎng)沙市建設(shè)用地批前管理標(biāo)準(zhǔn)化研究
[Abstract]:With the development of socialist market economy, population growth, urbanization and the acceleration of industrialization, the total demand for construction land is increasing. Because of the limited supply of construction land, the contradiction between supply and demand of land is becoming more and more acute, and saving intensive land has become the inevitable choice to alleviate the contradiction between supply and demand of land. And strengthening the management of construction land before grant is an effective means to promote conservation and intensive land use. Carrying out standardized management, building service-oriented government, incorruptible government and high-efficient government are the important measures to carry out social management in our country. In the face of the increasingly prominent contradiction between land supply and demand, the Changsha Land and Resources Bureau took the first batch of pilot projects of comprehensive standardization of social management and public services as an opportunity to launch the subject of "pilot study on Comprehensive Standardization of economized and intensive Land use in Changsha City". In order to promote the construction land conservation intensive use of standardized management, operation procedures, the implementation of fine. This paper is an important part of this project, which aims to analyze the present situation, problems and reasons of the pre-grant management of construction land in Changsha. To establish a standard system for the pre-grant management of construction land suitable for operation in Changsha administrative area, and to formulate specific standards for the pre-grant management of construction land in Changsha, Give full play to the role of standardization to improve the efficiency of conservation and intensive use of construction land and improve the level of public services. This paper starts with the related concepts of the standardization of pre-grant management of construction land in Changsha City, and gives a clear explanation of pre-grant management, economizing on intensive land use, standardization and standard system. Land saving intensive use theory and standardized management theory are the theoretical basis of this paper. In this paper, the current situation of pre-grant management of construction land in Changsha is analyzed in detail, and the existing problems and the reasons for the problems are found out. It provides the basis for the construction of construction land pre-lot management standard system in Changsha, and constructs the Changsha construction land pre-lot management standard system by using the methods of comprehensive systematic analysis and combination of macro analysis and micro analysis, etc. At the same time, the core content of service supply standard system in Changsha construction land pre-grant management standard system is established. This core content is the specific business links involved in the pre-grant management of construction land, including the pre-examination of construction project land, the examination and approval of construction land and the supply of state-owned construction land. In this paper, through the compilation of the construction project land prehearing standard, the construction land review and approval standard, the state-owned construction land recruitment and sale standard, the state-owned construction land agreement transfer standard and the state-owned construction land allocation and supply standard, Efforts will be made to integrate various measures and means of economizing intensive land management into each link of pre-grant management of construction land, and to implement the specific contents, links, requirements and operational means of saving intensive land to each specific post, It also provides technical support for promoting and improving the overall level of economizing and intensive land use by standardizing the work flow and working time limit of specific business links.
【學(xué)位授予單位】:湖南師范大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類(lèi)號(hào)】:F301.2
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 毛煒翔;;企業(yè)標(biāo)準(zhǔn)經(jīng)濟(jì)效益評(píng)價(jià)方法研究概論[J];質(zhì)量探索;2015年04期
2 邱樂(lè)豐;孫永朋;方豪;胡偉;;現(xiàn)代農(nóng)業(yè)綜合體標(biāo)準(zhǔn)化建設(shè)評(píng)判方法的研究[J];浙江農(nóng)業(yè)科學(xué);2015年03期
3 姚杰;王群;;嘉善縣農(nóng)業(yè)標(biāo)準(zhǔn)化綜合建設(shè)的做法與成效[J];浙江農(nóng)業(yè)科學(xué);2015年02期
4 夏蘭;李紅昌;石太軍;丁建榮;;油田科技成果經(jīng)濟(jì)效益評(píng)價(jià)方法探討[J];石油科技論壇;2015年01期
5 于尚云;郭建科;;遼寧省城市土地利用集約度測(cè)定及其時(shí)空差異[J];經(jīng)濟(jì)地理;2014年11期
6 黨青;周介銘;何偉;蔣貴國(guó);;住宅用地價(jià)格與土地集約利用度相關(guān)性研究——以四川省成都市為例[J];四川師范大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年06期
7 何力;;節(jié)約集約用地研究[J];北京農(nóng)業(yè);2014年27期
8 繩海龍;;標(biāo)準(zhǔn)化機(jī)制創(chuàng)新與企業(yè)提升[J];科技與企業(yè);2014年04期
9 趙建超;;對(duì)城市存量土地的思考[J];國(guó)土資源情報(bào);2013年07期
10 周宏;朱曉莉;;我國(guó)農(nóng)業(yè)標(biāo)準(zhǔn)化實(shí)施經(jīng)濟(jì)效果分析——基于74個(gè)示范縣的實(shí)證分析[J];農(nóng)業(yè)技術(shù)經(jīng)濟(jì);2011年11期
相關(guān)博士學(xué)位論文 前3條
1 陳昱;城市土地集約利用潛力挖掘分析與政策研究[D];華中農(nóng)業(yè)大學(xué);2012年
2 江立武;開(kāi)發(fā)區(qū)土地集約利用動(dòng)態(tài)評(píng)價(jià)及潛力預(yù)測(cè)研究[D];南京農(nóng)業(yè)大學(xué);2011年
3 李上;公共服務(wù)標(biāo)準(zhǔn)化體系及評(píng)價(jià)模型研究[D];中國(guó)礦業(yè)大學(xué)(北京);2010年
相關(guān)碩士學(xué)位論文 前7條
1 豐曉麗;太原市民營(yíng)區(qū)物流企業(yè)服務(wù)標(biāo)準(zhǔn)化指標(biāo)體系設(shè)計(jì)[D];太原理工大學(xué);2014年
2 王歡歡;公共服務(wù)標(biāo)準(zhǔn)化環(huán)境建設(shè)初探[D];廈門(mén)大學(xué);2014年
3 王靜;合肥市城市土地節(jié)約集約利用實(shí)證分析[D];安徽農(nóng)業(yè)大學(xué);2013年
4 房鵬;天津市基層質(zhì)監(jiān)局公共服務(wù)標(biāo)準(zhǔn)化體系建設(shè)研究[D];天津大學(xué);2013年
5 黎志鋒;區(qū)域旅游服務(wù)標(biāo)準(zhǔn)體系的構(gòu)建與評(píng)估[D];華南理工大學(xué);2012年
6 徐婷;我國(guó)政府公共服務(wù)標(biāo)準(zhǔn)化建設(shè)探究[D];中國(guó)海洋大學(xué);2012年
7 楊瓊;我國(guó)城市土地集約利用存在的問(wèn)題及對(duì)策研究[D];湖南大學(xué);2010年
,本文編號(hào):2288763
本文鏈接:http://sikaile.net/jingjilunwen/nongyejingjilunwen/2288763.html