基礎(chǔ)設(shè)施項目BLT模式運行機制設(shè)計優(yōu)化研究
[Abstract]:The construction of infrastructure projects is an important guarantee for the economic and social development of China and the improvement of people's living standards, and is also the basis for the survival and development of cities. For a long time, the contradiction between lagged infrastructure and rapid growth of demand is still prominent. The problems of insufficient capital and low efficiency of infrastructure construction have become the main obstacle to the economic development of our country. The traditional financing mode of infrastructure projects can no longer meet the requirements of rapid development of infrastructure projects in China, so in order to solve the problems existing in the construction of infrastructure projects in China, In this paper, BLT (Build-Lease-Transfer), or "build-lease- transfer" model, is proposed as a new financing construction mode to explore the construction of infrastructure projects in China. As a kind of derivative mode of traditional BOT financing mode, BLT mode has a short application time. At present, the international BLT project is still a new thing in practice, and it is often regarded as a combination of EPC general contract or BOT mode and financial lease. Lack of normative theoretical guidance. Based on the above analysis, this paper attempts to start with the study of the operation mechanism of BLT mode, apply the theory and method of system engineering in modern industrial engineering, master the running law of BLT mode, and standardize its operation flow and operation mode. In order to guide the application of BLT model in the construction of infrastructure projects in China, it provides a reference path for solving the problems existing in the construction of infrastructure projects in China. The relevant research ideas are as follows: first, the application of the current infrastructure project financing construction model, operation mechanism, BLT model, The application of industrial engineering theory and method in non-manufacturing industry is reviewed. This paper defines and induces the concept of BLT mode of infrastructure project, and clarifies the difference between BLT model, general BOT model and financial lease mode through comparative analysis, which lays the foundation for the application of BLT model in infrastructure project. Secondly, based on the analysis of the present financing situation of infrastructure projects, this paper puts forward that the financing of infrastructure projects in China should be solved by means of financing lease. On the basis of existing policy and legal documents, combined with the operation characteristics of infrastructure projects and the advantages of BLT model, the necessity of using BLT mode in infrastructure projects in China is analyzed. Thirdly, the operation mechanism of BLT infrastructure project is constructed by system engineering method. Based on the analysis of the relationship between the participants of BLT infrastructure projects and the contract system, the operation mode of BLT infrastructure projects is constructed by using the idea of system engineering and the three-dimensional structural modeling method of Hall. Based on the mechanism design theory and organization theory, the concept model of BLT infrastructure project operation mechanism is constructed, and the internal organization system motive force of BLT infrastructure project operation is analyzed by coupling thought. Finally, the optimization scheme of BLT infrastructure project operation mechanism is put forward. This paper mainly analyzes the meaning and significance of BLT operation mechanism optimization, establishes the BLT infrastructure project operation mechanism optimization model. This paper discusses the feasibility of IE in the BLT infrastructure project operation system, and puts forward the implementation scheme of improving the project operation flow by using the IE analytical technology.
【學(xué)位授予單位】:天津理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:F284
【參考文獻】
相關(guān)期刊論文 前10條
1 葉蘇東;;鐵路項目利用民間資本的開發(fā)模式研究[J];北京交通大學(xué)學(xué)報(社會科學(xué)版);2010年01期
2 張大力;;BOT融資模式在高校后勤基建中的應(yīng)用[J];平頂山工學(xué)院學(xué)報;2008年02期
3 宋剛;;復(fù)雜性科學(xué)視野下的城市管理三維結(jié)構(gòu)[J];城市發(fā)展研究;2007年06期
4 劉禹;何佰洲;武文婷;;城市基礎(chǔ)設(shè)施項目公私合作制模式的新探討——基于價值集成的視角[J];城市發(fā)展研究;2010年02期
5 曹曉波;;基于內(nèi)資BLT融資模式的軍隊醫(yī)院基礎(chǔ)設(shè)施建設(shè)[J];當(dāng)代經(jīng)濟(下半月);2008年06期
6 鄭春美;唐建新;汪興元;;PPP模式在我國農(nóng)村基礎(chǔ)設(shè)施建設(shè)中的應(yīng)用研究——基于湖北宜都農(nóng)村水利設(shè)施建設(shè)的案例分析[J];福建論壇(人文社會科學(xué)版);2009年12期
7 楊松;BOT投資方式的法律保障及其管制[J];法學(xué)評論;1997年05期
8 羅宜美,齊二石,楊文生;工業(yè)工程應(yīng)用趨勢研究[J];高等工程教育研究;2005年04期
9 馬緒梅;季洪濤;許映秋;談英姿;耿有權(quán);;基于IE思想和MAS仿真的人才培養(yǎng)體系[J];高等工程教育研究;2010年02期
10 李凱揚;趙濤;;現(xiàn)代工業(yè)工程與可持續(xù)發(fā)展[J];工業(yè)工程;2005年06期
相關(guān)博士學(xué)位論文 前1條
1 王耀輝;基礎(chǔ)設(shè)施建設(shè)BT投融資運行模式研究[D];長安大學(xué);2009年
本文編號:2383474
本文鏈接:http://sikaile.net/jingjilunwen/jingjiguanlilunwen/2383474.html