主制造商—供應(yīng)商模式下復(fù)雜產(chǎn)品研發(fā)風險傳遞研究
[Abstract]:With the rapid development of information technology and the acceleration of global economic integration, enterprise competition is becoming increasingly fierce. Competition among enterprises can also be attributed to competition among new products. Product innovation has become the core task of enterprise innovation, and the complexity of product system has become the trend of the general trend, because the R & D of complex products has the characteristics of high investment, complex technology, long cycle and high risk. Risk management, including risk identification, risk measurement, risk transmission and risk control, is necessary to ensure the success of product development. In the process of complex product research and development, the main manufacturer-supplier model is gradually accepted by various enterprises, this paper also focuses on the complex product R & D risk transfer. Based on the classical GERT network model, this paper studies the single R & D risk transfer model and the integrated R D risk model and its related contents, and applies its algorithm to a practical case. The main contents of this paper are as follows: (1) the main manufacturer-supplier model is defined and a three-stage model of material and parts supplier-subsystem supplier-main manufacturer is established. The characteristics of R & D risk of complex products are defined, the risk of R D is identified, the R D risk of complex product is determined, and the risk of schedule and cost is further studied. (2) the research on risk transfer of complex product research includes two aspects: firstly, the transmission process of single R & D risk factor is studied by combining the GERT network model with single parameter. The transmission mechanism and measurement method are studied from two aspects of schedule risk and cost risk. Then, combined with the multi-parameter R-GERT network model, the transfer process of comprehensive R & D risk is studied, and the integrated R & D risk is regarded as a function of schedule risk. The solution method of multi-parameter R-GERT network model is determined by relevant definition and theorem proof. Finally, combined with the risk contribution rate of each subsystem supplier to the main manufacturer, the final comprehensive R & D risk of the main manufacturer is obtained. (3) to verify the risk factors of single R & D and the model of comprehensive R & D risk with an example, and put forward the corresponding countermeasures of risk control, mainly taking the R & D process of a certain type of aircraft as the object of study. By integrating the existing data of this model, the corresponding R-GERT model is constructed, and the transmission mechanism of comprehensive R & D risk is obtained, and the countermeasures of controlling the risk of the main manufacturer are given.
【學位授予單位】:南京航空航天大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:F273.2;F224
【參考文獻】
相關(guān)期刊論文 前10條
1 陳明;林桂娟;;復(fù)雜產(chǎn)品研發(fā)技術(shù)風險管理研究與應(yīng)用[J];同濟大學學報(自然科學版);2009年08期
2 徐華鋒;方志耕;;以時間為自變量的多參數(shù)GERT網(wǎng)絡(luò)模型的解析求解[J];統(tǒng)計與決策;2011年02期
3 程國平;邱映貴;;供應(yīng)鏈風險傳導(dǎo)模式研究[J];武漢理工大學學報(社會科學版);2009年02期
4 李曉松;蔡文軍;陳慶華;;武器裝備研制風險的GERT網(wǎng)絡(luò)模型研究[J];系統(tǒng)仿真技術(shù);2010年02期
5 徐哲;吳瑾瑾;姚李剛;;基于GERT仿真的武器裝備技術(shù)風險量化評估模型[J];系統(tǒng)仿真學報;2008年07期
6 方志耕,龔正,黃西林;公路軍事交通運輸勤務(wù)綜合演習項目GERT網(wǎng)絡(luò)模型研究與分析[J];系統(tǒng)工程理論與實踐;2000年04期
7 顧基發(fā),趙麗艷;航天系統(tǒng)安全性分析的概率風險評估方法[J];系統(tǒng)工程與電子技術(shù);1999年08期
8 李存斌;王恪鋮;;網(wǎng)絡(luò)計劃項目風險元傳遞解析模型研究[J];中國管理科學;2007年03期
9 劉思峰;萬壽慶;陸志鵬;方志耕;朱建軍;;復(fù)雜交通網(wǎng)絡(luò)中救援點與事故點間的路段重要性評價模型研究[J];中國管理科學;2009年01期
10 方志耕;楊保華;陸志鵬;劉思峰;陳曄;陳偉;姚國章;;基于Bayes推理的災(zāi)害演化GERT網(wǎng)絡(luò)模型研究[J];中國管理科學;2009年02期
相關(guān)博士學位論文 前1條
1 張卓;基于復(fù)雜性度量的產(chǎn)品質(zhì)量經(jīng)濟性評價研究[D];南京航空航天大學;2008年
本文編號:2328053
本文鏈接:http://sikaile.net/jingjilunwen/jingjiguanlilunwen/2328053.html