萊州市云峰壹號二期進度控制研究
[Abstract]:Project schedule management is a management method that integrates project time and investment control, resource optimization, project schedule planning and management. With the rapid development of domestic economy, the quantity and scale of project construction are increasing. As one of the key contents of project management, the optimization and control of schedule is closely related to the cost, duration and quality of the project. It is also an important measure to ensure the completion of the project on time, to arrange the supply of resources scientifically and to save the cost, which directly affects the smooth construction of the project and relates to the reputation and benefit of the construction unit. At present, the research of project schedule management mainly focuses on the time and cost control and optimization of the project, and seeks a balance between the project construction time and the construction cost. The method of schedule management is to manage the schedule of a single project without the restriction of project resources, but in the actual work, There is a phenomenon of mutual influence and competition for resources among many projects or processes within projects. Therefore, how to coordinate the progress of projects under the condition of limited resources has become a key issue for scholars to study. Based on the comprehensive analysis of the status quo of project schedule management and construction schedule management at home and abroad, this paper aims at the problems existing in the current construction project schedule control. Combined with the actual situation of the second phase of project schedule management in Yunfeng No. 1, Laizhou, mainly from the project schedule planning, schedule optimization to the project and progress control management and implementation of analysis and research, The main research contents of this paper include the following aspects: (1) introduce the background and general situation of the second phase project of Yunfeng No. 1 in Laizhou City, analyze the characteristics and construction difficulties of the project and the risks faced by the project schedule management. This paper puts forward the necessity of the schedule management of the second phase of Yunfeng 1 project. (2) decomposing the WBS task of the second phase of Yunfeng 1 project in Laizhou City, analyzing the logical relationship of the project work, and compiling the horizontal road diagram of the project schedule plan by using the CMP method. The corresponding key routes and duration of Yunfeng 1 Phase II project are preliminarily determined. (3) the theory of critical chain and the optimization of project schedule are analyzed, including the classification of work tasks, the elimination of working procedure safety time, and the identification of project bottleneck resources. The key chain of the construction project, the setting and calculation of the project buffer, the calculation of the working elasticity coefficient and the calculation of the project buffer are determined. For an engineering example, this paper analyzes the second phase project schedule of Yunfeng No. 1 project by using the key chain theory (CMM method) and draws up the progress plan of the project. (4) according to the characteristics of the project, the author analyzes the advantages of the CMM method. (4) according to the characteristics of the project, the organization and technology are introduced. On the basis of contract and management, economy and information, this paper puts forward the guarantee measures, prevention and correction measures for the progress plan of the project. Based on the theory of key chain, the dynamic control and management method of construction schedule is put forward.
【學位授予單位】:中國海洋大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TU722
【相似文獻】
相關(guān)期刊論文 前10條
1 時潤生;試論監(jiān)理進度控制的方式[J];建設監(jiān)理;2002年01期
2 李永奎,王井祥;結(jié)構(gòu)化集成進度控制模式的研究和實踐[J];基建優(yōu)化;2003年06期
3 裴劍平;淺析施工階段的進度控制[J];山西建筑;2005年04期
4 殷照生;;以質(zhì)量優(yōu)化成本 以進度控制成本[J];治淮;2006年08期
5 佘榮;;質(zhì)量與進度控制在施工中的作用與關(guān)系[J];科技咨詢導報;2007年23期
6 韓少輝;;淺析施工階段的進度控制[J];中國水運(下半月);2008年01期
7 林韓龍;;進度控制理論和方法的探討[J];廣東建材;2008年10期
8 趙瑞卿;;公路施工成本、質(zhì)量和進度控制[J];黑龍江交通科技;2009年09期
9 邵啟德;;淺析如何發(fā)揮進度控制的作用[J];山西建筑;2010年06期
10 武強;;談項目部進度控制的方法和措施[J];山西建筑;2012年04期
相關(guān)會議論文 前10條
1 毋琨;常中剛;李新莊;;監(jiān)理如何做好工程建設的進度控制工作[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2005)[C];2005年
2 楊利利;屠望;;淺談業(yè)主對工程項目建設的進度控制[A];土木建筑學術(shù)文庫(第16卷)[C];2012年
3 段紅策;;項目計劃進度控制與資源管理[A];河南省土木建筑學會2008年學術(shù)交流會論文集[C];2008年
4 喬軍;;淺談項目的進度控制[A];建材建設工程優(yōu)秀論文集[C];2011年
5 余應厚;;工程建設施工階段的進度控制[A];河南省土木建筑學會2010年學術(shù)大會論文集[C];2010年
6 王鑫;溫紅運;;談建筑施工項目控制中的進度控制[A];土木建筑學術(shù)文庫(第9卷)[C];2008年
7 胡曉聰;康汝杰;湛麗;;量化合同進度控制體系應用研究[A];中國核科學技術(shù)進展報告(第二卷)——中國核學會2011年學術(shù)年會論文集第10冊(核情報(含計算機技術(shù))分卷、核技術(shù)經(jīng)濟與管理現(xiàn)代化分卷)[C];2011年
8 陳友杰;;淺談建設工程項目的進度控制[A];第五屆全國礦山采選技術(shù)進展報告會論文集[C];2006年
9 張方良;李健;;P3E/C在石化項目實施階段進度控制中的應用[A];2010年石油石化行業(yè)建設工程總承包與項目管理論壇文集[C];2010年
10 石繼光;張鵬輝;;對當前監(jiān)理進度控制工作的幾點思考[A];土木建筑學術(shù)文庫(第7卷)[C];2007年
相關(guān)重要報紙文章 前10條
1 記者 張建平;今年一季度我州安全生產(chǎn)控制指標平穩(wěn)運行[N];大理日報(漢);2007年
2 記者 張建平;上半年我州安全生產(chǎn)整體運行平穩(wěn)[N];大理日報(漢);2007年
3 記者 張建平 通訊員 蘇云;我州一至九月安全生產(chǎn)運行平穩(wěn)[N];大理日報(漢);2007年
4 ;常德市安全生產(chǎn)委員會辦公室關(guān)于2010年1至5月全市生產(chǎn)安全事故及指標控制情況的通報[N];常德日報;2010年
5 梁英;淺議進度控制和質(zhì)量控制在建筑施工中的作用[N];伊犁日報(漢);2010年
6 記者 張建平;我州1—9月安全生產(chǎn)運行平穩(wěn)[N];大理日報(漢);2006年
7 記者 張建平;我州安全生產(chǎn)運行平穩(wěn)[N];大理日報(漢);2006年
8 單曉敬;軟包裝企業(yè)如何做好生產(chǎn)與物料控制[N];中國包裝報;2008年
9 王迪海 龔小忠(作者單位:浙江中聯(lián)建設集團有限公司);淺談施工項目的進度控制[N];建筑時報;2007年
10 記者 謝春陽;湖南通報指標進度[N];中國安全生產(chǎn)報;2005年
相關(guān)碩士學位論文 前10條
1 徐鵬;網(wǎng)絡游戲項目的研發(fā)進度控制研究[D];昆明理工大學;2015年
2 毛亞南;A變電站建設項目進度管理研究[D];復旦大學;2013年
3 魏圣亭;電力工程施工階段的進度控制[D];山西大學;2015年
4 宋曉華;基于關(guān)鍵法中小建筑企業(yè)施工項目的進度控制研究[D];江西理工大學;2015年
5 王友峰;煤礦企業(yè)項目管理信息系統(tǒng)的設計與實現(xiàn)[D];電子科技大學;2014年
6 李U,
本文編號:2176750
本文鏈接:http://sikaile.net/jingjilunwen/jianzhujingjilunwen/2176750.html